Load-break & AB switchesDeccanhertz4 variants
SampleLoad-break & AB switches Deccanhertz · DEC-D37 series
- Rating
- 11 kV 400 A to 33 kV 630 A (see variants)
- Switch type
- Load-break switch
- Operation
- Hookstick
- Mounting
- Pole top
- Poles
- 3P
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 1 set
AMI head-end & meter data managementPennar3 variants
SampleAMI head-end & meter data management Pennar · PEN-9A2 series
- Meter capacity
- 500,000 meters to 2,500,000 meters (see variants)
- Deployment
- On-premise
- Protocols
- IEC 61968-9
- Communication support
- GPRS/4G
- Data validation
- VEE rules engine
Lead time 16-24 weeks · Warranty 12 months with AMC option · MOQ 5 licence
Small & micro wind turbinesSahyadri6 variants
SampleSmall & micro wind turbines Sahyadri · SAH-014 series
- Rated power
- 1 kW to 50 kW (see variants)
- Axis
- Horizontal
- Number of blades
- 3
- Rotor diameter
- 6.4 m
- Output voltage
- 12 V DC
Lead time 4-6 weeks · Warranty 12 months · MOQ 10 nos
Lender's engineer & TEV studiesNilgiri4 variants
SampleServiceLender's engineer & TEV studies Nilgiri · NIL-A27 series
- Project cost
- INR 100 crore to INR 1000 crore (see variants)
- Phase
- Construction monitoring
- Scope
- Contract and permit review
- Reporting
- Monthly progress report
- Site visits
- At milestones
Lead time 4-8 weeks for TEV · Warranty Professional indemnity · MOQ 1 report
Load-break & AB switchesDeccanhertz6 variants
SampleLoad-break & AB switches Deccanhertz · DEC-B24 series
- Rating
- 11 kV 200 A to 33 kV 800 A (see variants)
- Switch type
- AB switch
- Operation
- Motor operated
- Mounting
- Vertical
- Poles
- 3P
Lead time 2-3 weeks · Warranty 18 months from supply · MOQ 2 set
Switches, sockets & modular platesDeccan6 variants
SampleSwitches, sockets & modular plates Deccan · DEC-AF8 series
- Module
- 1M to 8M (see variants)
- Item
- Switch
- Current rating
- 25 A
- Rated voltage
- 240 V AC
- Switch type
- One-way
Lead time 2-3 weeks · Warranty 24 months from supply · MOQ 5 nos
Project management (PMC) & owner's engineerSabarmati3 variants
SampleServiceProject management (PMC) & owner's engineer Sabarmati · SAB-C07 series
- Project size
- 10 MW to 50 MW (see variants)
- Scope
- Owner's engineer through COD
- Team on site
- PM, 3 engineers, QA/QC inspector
- Schedule control
- MS Project weekly
- Reporting
- Monthly dashboard for lenders
Lead time Engagement for 6-24 months · Warranty As per contract · MOQ 1 month
Insulators (porcelain, polymer, glass)Prabhamark6 variants
SampleInsulators (porcelain, polymer, glass) Prabhamark · PRA-477 series
- Voltage and strength
- 11 kV 45 kN to 400 kV 160 kN (see variants)
- Material
- Porcelain
- Type
- Suspension
- Failing load
- 210 kN
- Creepage
- 31 mm/kV
Lead time 6-8 weeks · Warranty 24 months · MOQ 2 nos
Pumped-storage pump-turbines & motor-generatorsSaurashtra4 variants
SamplePumped-storage pump-turbines & motor-generators Saurashtra · SAU-311 series
- Unit rating
- 150 MW to 400 MW (see variants)
- Machine type
- Motor-generator
- Head range
- 150-300 m
- Rated speed
- 250 rpm
- Mode
- Generating / pumping
Lead time 18-24 months · Warranty 60 months · MOQ 10 nos
Site acceptance & pre-commissioning testsDeccan6 variants
SampleServiceSite acceptance & pre-commissioning tests Deccan · DEC-244 series
- Plant size
- 1 MW to 100 MW (see variants)
- Scope
- Solar SAT
- Instruments
- Insulation tester, earth tester
- Test sequence
- Visual, mechanical, electrical
- Team
- Team of 6 with lead
Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Detuned & series reactorsSahyadriagni4 variants
SampleDetuned & series reactors Sahyadriagni · SAH-D73 series
- Rating
- 10 kVAr to 100 kVAr (see variants)
- Detuning factor
- 14% (134 Hz)
- Rated voltage
- 525 V
- Core
- Air core
- Winding
- Aluminium
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 10 nos
Lighting poles & armsAgnimark5 variants
SampleLighting poles & arms Agnimark · AGN-247 series
- Height
- 6 m to 12 m (see variants)
- Pole shape
- Swaged
- Material
- Steel tubes IS 1161
- Wall thickness
- 3 mm
- Galvanising
- Hot dip 120 micron
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 5 nos
I-V curve tracers & EL testers (solar)Vijaya5 variants
SampleI-V curve tracers & EL testers (solar) Vijaya · VIJ-2B9 series
- Max DC voltage / current
- 1500 V 15 A to EL camera 20 MP (see variants)
- Measurement
- EL imaging
- Irradiance sensor
- Pyranometer
- Temperature sensor
- PT1000 cell
- Accuracy
- +/-1%
Lead time 6-10 weeks · Warranty 12 months from supply · MOQ 1 nos
Lender's engineer & TEV studiesRavipushpak3 variants
SampleServiceLender's engineer & TEV studies Ravipushpak · RAV-9D8 series
- Project cost
- INR 250 crore to INR 1000 crore (see variants)
- Phase
- Construction monitoring
- Scope
- Contract and permit review
- Reporting
- TEV report
- Site visits
- Quarterly
Lead time Appointment in 1 week · Warranty Report reliance letter to lenders · MOQ 1 report
Plant decommissioning & dismantlingPhasetron6 variants
SampleServicePlant decommissioning & dismantling Phasetron · PHA-D16 series
- Plant capacity
- 1 MW to 100 MW (see variants)
- Scope
- Dismantling with recycling
- Technology
- Wind
- Cranes
- Heavy crawler cranes
- Material disposal
- Client store
Lead time Execution 4 weeks to 6 months · Warranty Workmanship 6 months · MOQ 1 MW
MCB distribution boardsAmaravatinandi5 variants
SampleMCB distribution boards Amaravatinandi · AMA-661 series
- Ways
- 4-way to 16-way (see variants)
- Type
- TPN
- Incomer
- MCB 63 A
- Rated current
- 100 A
- Rated voltage
- 415 V
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 5 nos
Building energy management systems (BEMS)Kamrupagni5 variants
SampleBuilding energy management systems (BEMS) Kamrupagni · KAM-174 series
- Monitored points
- 100 points to 2500 points (see variants)
- Protocols
- Modbus, BACnet
- Metering
- Utility meter integration
- Controls
- HVAC scheduling
- Dashboard
- Web and mobile
Lead time Supply in 4-6 weeks · Warranty Software support 12 months · MOQ 1 nos
Thermal energy storageSutlejsurya5 variants
SampleThermal energy storage Sutlejsurya · SUT-074 series
- Storage capacity
- 100 kWh-th to 20 MWh-th (see variants)
- Storage medium
- Graphite or refractory block
- Operating temperature
- 600-1000 deg C
- Charge source
- Chiller
- Discharge output
- Hot air
Lead time 16-24 weeks · Warranty 5 years on tank · MOQ 1 kWh
Module materials (glass, EVA/POE, backsheet, frames, ribbon)Nilgirisudarshan6 variants
SampleModule materials (glass, EVA/POE, backsheet, frames, ribbon) Nilgirisudarshan · NIL-613 series
- Material
- EVA film to Tinned ribbon (see variants)
- Thickness
- 2.0 mm
- Light transmittance
- 91.5%
- Gel content
- 80%
- Volume resistivity
- > 1e15 ohm-cm
Lead time 2-3 weeks · Warranty As per supply agreement · MOQ 1 kg
MV XLPE cablesSudarshancore3 variants
Sudarshancore · SUD-5F5 series
- Size
- 3C x 185 sq mm to 3C x 300 sq mm (see variants)
- Voltage grade
- 19/33 kV (E)
- Conductor
- Copper
- Insulation
- XLPE
- Screen
- Copper wire
Lead time 3-4 weeks · Warranty As per contract · MOQ 2 km
MV XLPE cablesWayanadprabha4 variants
Wayanadprabha · WAY-AF2 series
- Size
- 3C x 185 sq mm to 3C x 400 sq mm (see variants)
- Voltage grade
- 12.7/22 kV (E)
- Conductor
- Aluminium
- Insulation
- XLPE
- Screen
- Copper tape
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 1 km
Connectors & terminal blocksKrishna5 variants
SampleConnectors & terminal blocks Krishna · KRI-6B3 series
- Rating
- 2.5 mm² / 24 A to 16 mm² / 76 A (see variants)
- Connection type
- Screw clamp
- Rated voltage
- 800 V
- Housing material
- PBT
- Conductor material
- Brass
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 10 nos
Type & routine testing laboratories (NABL)Krishna3 variants
SampleServiceType & routine testing laboratories (NABL) Krishna · KRI-413 series
- Test class
- Acceptance test to Type test (LV) (see variants)
- Equipment under test
- Switchgear
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 400 kV
- Test standard
- Customer specific test plan
Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos
Weather monitoring stationsKonkan4 variants
SampleWeather monitoring stations Konkan · KON-CE8 series
- Configuration
- Basic: GHI + ambient temp to Class A: + albedo, DNI, DHI (see variants)
- Pyranometer class
- ISO 9060 Class B
- Wind sensor
- Ultrasonic 2D
- Temperature sensor
- PT1000 back-of-module
- Humidity range
- 0-100% RH
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 1 set