Insulators (porcelain, polymer, glass)Prakashtek5 variants
SampleInsulators (porcelain, polymer, glass) Prakashtek · PRA-477 series
- Voltage and strength
- 11 kV 45 kN to 220 kV 120 kN (see variants)
- Material
- Silicone polymer
- Type
- Post
- Failing load
- 160 kN
- Creepage
- Anti-fog 40 mm/kV
Lead time 6-8 weeks · Warranty 24 months · MOQ 1 nos
Power semiconductors (IGBT, SiC, thyristors)Kaveri4 variants
SamplePower semiconductors (IGBT, SiC, thyristors) Kaveri · KAV-885 series
- Rating
- 1200 V / 150 A to 3300 V / 800 A (see variants)
- Device type
- Trench IGBT
- Topology
- Chopper
- Package
- TO-247
- Isolation voltage
- 2.5 kV
Lead time 4-8 weeks · Warranty 24 months from supply · MOQ 10 nos
Data & telecom cables (Cat6, coaxial)Vidyuttek4 variants
SampleData & telecom cables (Cat6, coaxial) Vidyuttek · VID-4F1 series
- Type
- Cat5e UTP to Cat6A U/FTP (see variants)
- Box length
- 305 m
- Conductor
- 23 AWG bare copper
- Pairs
- 4 pair
- Jacket
- PVC
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 5 box
Precast cable trenches & RCC productsChambalgrid5 variants
SamplePrecast cable trenches & RCC products Chambalgrid · CHA-145 series
- Trench inner size (W x D)
- 300 x 300 mm to 1000 x 1000 mm (see variants)
- Unit length
- 1.5 m
- Concrete grade
- M30
- Wall thickness
- 100 mm
- Cover slab
- Precast RCC
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 5 m
First aid & emergency showersTaxila3 variants
SampleFirst aid & emergency showers Taxila · TAX-1B8 series
- Type / size
- Kit for 50 persons to Safety shower with eye wash (see variants)
- Cabinet material
- ABS plastic
- Contents
- Dressings, burn gel, antiseptics, splints
- Eye wash flow
- 11.4 L/min for 15 min
- Shower flow
- 75 L/min
Lead time 3-4 weeks · Warranty 12 months · MOQ 1 nos
Effluent & sewage treatment (ETP / STP)Betwafaraday3 variants
SampleEffluent & sewage treatment (ETP / STP) Betwafaraday · BET-544 series
- Capacity
- 25 KLD to 100 KLD (see variants)
- Process
- SBR
- Tank material
- MS epoxy coated
- Treated BOD
- Below 20 mg/l
- Blower
- Ring blower
Lead time 8-12 weeks · Warranty 24 months on equipment · MOQ 10 set
Flow batteriesTaxila3 variants
Taxila · TAX-582 series
- Discharge duration
- 8 hours to 12 hours (see variants)
- Chemistry
- Vanadium redox
- Rated power
- 1 MW
- Round-trip efficiency
- 70-75%
- Cycle life
- 15000 cycles
Lead time 16-20 weeks · Warranty 10 years performance · MOQ 1 kWh
STATCOM & SVGKanchi3 variants
Kanchi · KAN-593 series
- Rating
- 400 kVAr to 3 MVAr (see variants)
- Voltage
- 11 kV
- Topology
- 3-level IGBT
- Response time
- < 5 ms
- Compensation
- Capacitive and inductive, bidirectional
Lead time 16-24 weeks · Warranty 36 months with AMC · MOQ 2 nos
Transmission line erection & stringingPrakashtron6 variants
SampleServiceTransmission line erection & stringing Prakashtron · PRA-5C7 series
- Voltage level
- 33 kV to 765 kV (see variants)
- Circuit type
- Multi-circuit on narrow base
- Conductor
- ACSR Moose
- Scope
- Erection and stringing only
- Stringing method
- Conventional stringing
Lead time Per section schedule · Warranty Workmanship 12 months · MOQ 1 km
Earth pits, chambers & enhancing compoundsMysoreojas6 variants
SampleEarth pits, chambers & enhancing compounds Mysoreojas · MYS-E74 series
- Type / size
- Chamber 300x300 mm to Compound 50 kg bag (see variants)
- Chamber material
- Cast iron
- Cover load rating
- Class B 125 kN
- Compound type
- Hydrophilic gel
- Resistivity
- < 0.2 Ω·m
Lead time 2-3 weeks · Warranty As per manufacturer, 5 years life · MOQ 1 nos
Furnace & rectifier transformersAwadhakshay3 variants
SampleFurnace & rectifier transformers Awadhakshay · AWA-2B5 series
- Rating
- 2 MVA to 10 MVA (see variants)
- Primary voltage
- 66 kV
- Secondary voltage
- Up to 400 V DC rectified
- Application
- Rectifier
- Cooling
- OFAF
Lead time 16-20 weeks · Warranty 24 months · MOQ 5 nos
Cranes & hydrasJhelum5 variants
SampleFor rentCranes & hydras Jhelum · JHE-9B3 series
- Crane capacity
- 8 t hydra to 80 t (see variants)
- Boom length
- 10 m
- Operator
- Not included
- Fuel
- Client scope
- Minimum hire
- 1 shift of 8 h
Lead time 2-3 days · Warranty Replacement within 24 h · MOQ 1 nos
GI & copper stripsPataliputraohm6 variants
Pataliputraohm · PAT-458 series
- Size
- 25x3 mm GI to 40x3 mm Cu (see variants)
- Material
- Mild steel galvanised
- Galvanising
- Hot-dip, min 70 µm
- Zinc coating
- IS 4759
- Current rating
- Fault current 1 s rated
Lead time 1-2 weeks · Warranty Material conformity per test certificate · MOQ 1 m
Blowers, fans & compressorsNarmada5 variants
SampleBlowers, fans & compressors Narmada · NAR-944 series
- Power rating
- 2.2 kW to 110 kW (see variants)
- Type
- Centrifugal
- Flow
- 500000 m3/h
- Pressure
- 600 mmWC
- Impeller
- Backward curved
Lead time 2-4 weeks · Warranty 12 months · MOQ 1 nos
Equipotential bondingPataliputraohm3 variants
SampleEquipotential bonding Pataliputraohm · PAT-982 series
- Capacity
- 24-way bar to Jumper 35 mm² x 500 mm (see variants)
- Bar material
- Electrolytic copper
- Bar size
- 100x10 mm
- Terminals
- M8 studs
- Insulators
- SMC
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 10 set
Radio, RF mesh & LoRaWANMalwa4 variants
SampleRadio, RF mesh & LoRaWAN Malwa · MAL-CF4 series
- Type
- LoRaWAN indoor gateway to PMP base station (see variants)
- Frequency
- 2.4 GHz
- Output power
- 30 dBm
- Range
- 3 km line of sight
- Data rate
- 250 kbps
Lead time 3-4 weeks · Warranty 36 months from supply · MOQ 1 nos
Static transfer switchesKiranmax4 variants
SampleStatic transfer switches Kiranmax · KIR-DF9 series
- Rating
- 63 A to 400 A (see variants)
- Phase
- 1-phase
- Rated voltage
- 415 V AC
- Transfer time
- Below 4 ms
- Transfer type
- Make-before-break
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 2 nos
Housekeeping & cleaning suppliesArcsys6 variants
SampleHousekeeping & cleaning supplies Arcsys · ARC-079 series
- Pack size
- 500 ml to 1000 litre (see variants)
- Product type
- Disinfectant
- pH
- Neutral
- Dilution
- Ready to use
- Residue
- Non-residue
Lead time 1-2 weeks · Warranty 24 months shelf life in sealed pack · MOQ 1 nos
Transformer sparesMagadhgrid6 variants
Magadhgrid · MAG-284 series
- Voltage class
- 11 kV to 400 kV (see variants)
- Component
- WTI
- Rated current
- 250 A
- Material
- Resin impregnated paper
- Creepage
- 25 mm/kV
Lead time 6-12 weeks · Warranty 18 months from commissioning · MOQ 1 nos
Battery chargers & DC systemsUjjayinisetu4 variants
SampleBattery chargers & DC systems Ujjayinisetu · UJJ-228 series
- Rating
- 25 A to 200 A (see variants)
- Output voltage
- 48 V
- Input
- 415 V 3-ph
- Topology
- Thyristor
- Voltage regulation
- +/- 1%
Lead time 6-8 weeks · Warranty 36 months · MOQ 1 nos
Scheduling & forecasting (QCA)Godavariakshay3 variants
SampleServiceScheduling & forecasting (QCA) Godavariakshay · GOD-D89 series
- Aggregated capacity
- 100 MW to 500 MW (see variants)
- Service
- Forecast and scheduling
- Forecast horizon
- Intraday 15-minute blocks
- Accuracy
- Error under 10%
- Data input
- Satellite nowcasting
Lead time Onboarding in 2-3 weeks · Warranty Forecast accuracy guarantee with fee linkage · MOQ 1 MW
Project management (PMC) & owner's engineerDeepmark5 variants
SampleServiceProject management (PMC) & owner's engineer Deepmark · DEE-A06 series
- Project size
- 25 MW to 500 MW (see variants)
- Scope
- Design review and QA/QC
- Team on site
- 1 project manager plus 1 engineer
- Schedule control
- MS Project weekly
- Reporting
- Weekly progress report
Lead time Deployment in 2 weeks · Warranty As per contract · MOQ 1 month
Installation & erectionKalingaamrit3 variants
SampleServiceInstallation & erection Kalingaamrit · KAL-DB2 series
- Installation scope
- 5 MW to 25 MW (see variants)
- Scope
- Electrical BoP erection
- Manpower deployed
- 25 technicians per MW-block
- Supervision
- Project manager, engineers, QA/QC
- Equipment
- Pile driver, crane, telehandler
Lead time Start after material at site · Warranty Workmanship 12 months · MOQ 1 MW
Conduits & HDPE ductsGodavariakash6 variants
SampleConduits & HDPE ducts Godavariakash · GOD-213 series
- Outside diameter
- 50 mm to 200 mm (see variants)
- Type
- Smooth wall
- Material
- HDPE PE100
- Pressure class
- PN 10
- Colour
- Orange
Lead time 3-4 weeks · Warranty As per manufacturer · MOQ 1 m