Power-exchange trading servicesJhelum5 variants
SampleServicePower-exchange trading services Jhelum · JHE-053 series
- Traded volume
- 1 MU per month to 50 MU per month (see variants)
- Segment
- Green market
- Licence
- Trading licensee
- Margin
- Fixed monthly fee
- Bidding
- Manual with analyst
Lead time Trading from next market day · Warranty Settlement accuracy · MOQ 1 month
Open-access approvalsWayanad4 variants
SampleServiceOpen-access approvals Wayanad · WAY-354 series
- Contract demand
- 10 MW to 100 MW (see variants)
- Access type
- Long term
- Scope
- Agreement drafting and execution
- Approvals
- SLDC
- Charges analysis
- Wheeling, CSS and additional surcharge
Lead time Approval in 15-90 days · Warranty As per contract · MOQ 1 application
Cable trays & laddersKavachsys5 variants
SampleCable trays & ladders Kavachsys · KAV-868 series
- Width
- 150 mm to 900 mm (see variants)
- Type
- Wire mesh
- Material
- FRP
- Finish
- Powder coated
- Thickness
- 1.6 mm
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 5 m
EIA, ESG & environmental studiesTaptideep4 variants
SampleServiceEIA, ESG & environmental studies Taptideep · TAP-8B1 series
- Project scale
- Under 25 MW to 250 MW (see variants)
- Study
- Rapid EIA
- Baseline season
- One season
- Deliverables
- Final EIA with approvals
- Lab testing
- NABL accredited lab
Lead time 8-12 weeks, longer with seasonal baseline · Warranty As per contract · MOQ 1 report
Station batteries (Ni-Cd, VRLA)Prabhatron4 variants
SampleStation batteries (Ni-Cd, VRLA) Prabhatron · PRA-248 series
- Capacity
- 100 Ah to 500 Ah (see variants)
- Chemistry
- VRLA gel
- Nominal cell voltage
- 1.2 V
- Number of cells
- 110
- Bank voltage
- 110 V
Lead time 6-8 weeks · Warranty 24 months · MOQ 1 nos
Aspirating smoke detectionAravalijal4 variants
SampleAspirating smoke detection Aravalijal · ARA-F04 series
- Coverage
- Up to 250 m² / 1 pipe to Up to 2000 m² (see variants)
- Sensitivity
- Class A (very high)
- Detection
- Laser light scattering
- Alarm levels
- Alert, Action, Fire 1, Fire 2
- Pipe network
- Up to 100 m
Lead time 3-4 weeks · Warranty 36 months from supply · MOQ 1 nos
Electrical safety auditsDwaraka5 variants
SampleServiceElectrical safety audits Dwaraka · DWA-882 series
- Installed load
- 1 MVA to 50 MVA (see variants)
- Scope
- Visual and documentation audit
- Auditor
- CEA-licensed engineer
- Measurements
- Thermography and power quality
- Report
- Action plan with timeline
Lead time Report in 7-14 days · Warranty Re-audit at reduced rate · MOQ 1 site
OT cybersecurity (IEC 62443)Coorgjyoti3 variants
SampleOT cybersecurity (IEC 62443) Coorgjyoti · COO-539 series
- Assets monitored
- Up to 1,000 assets to Up to 20,000 assets (see variants)
- Deployment
- Passive sensor + central
- Protocol DPI
- OPC UA
- Functions
- Asset inventory, anomaly detection, CVE mapping
- Alerting
- Email
Lead time 4-6 weeks · Warranty 24x7 support under subscription · MOQ 5 licence
Weather monitoring stationsLonavalatamra6 variants
SampleWeather monitoring stations Lonavalatamra · LON-472 series
- Configuration
- Basic: GHI + ambient temp to Wind mast 80 m (see variants)
- Pyranometer class
- Reference cell 2% accuracy
- Wind sensor
- Cup anemometer
- Temperature sensor
- PT1000 back-of-module
- Humidity range
- 0-100% RH
Lead time 6-8 weeks · Warranty 24 months from commissioning · MOQ 2 set
Exothermic weldingMauryaakash3 variants
Mauryaakash · MAU-B79 series
- Weld type
- Cable to rod to Strip to strip (see variants)
- Weld metal size
- 45 g
- Mould material
- High-density graphite
- Mould life
- 50-100 welds
- Conductor
- Copper to steel
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 set
Earthing & auxiliary transformersJalline5 variants
SampleEarthing & auxiliary transformers Jalline · JAL-C07 series
- Rating
- 100 kVA to 1600 kVA (see variants)
- Type
- Auxiliary (Dyn11)
- Primary voltage
- 11 kV
- Secondary voltage
- 3.3 kV
- Short-time rating
- 30 s
Lead time 3-5 weeks · Warranty 18 months · MOQ 1 nos
Module materials (glass, EVA/POE, backsheet, frames, ribbon)Doabasamarth5 variants
SampleModule materials (glass, EVA/POE, backsheet, frames, ribbon) Doabasamarth · DOA-A95 series
- Material
- POE film to Tinned ribbon (see variants)
- Thickness
- 0.5 mm
- Light transmittance
- 91.5%
- Gel content
- > 75%
- Volume resistivity
- > 1e15 ohm-cm
Lead time 4-6 weeks · Warranty As per supply agreement · MOQ 1 kg
AC chargersTaptiurja3 variants
Taptiurja · TAP-D65 series
- Rated power
- 3.3 kW to 11 kW (see variants)
- Input voltage
- 230 V 1-ph
- Connector
- Type 2 socket
- Cable length
- 5 m
- Authentication
- Plug and charge
Lead time 3-5 weeks · Warranty 12 months · MOQ 2 nos
Charging transformers & LT panelsVijaya3 variants
SampleCharging transformers & LT panels Vijaya · VIJ-8E5 series
- Rating
- 500 kVA to 1000 kVA (see variants)
- Voltage ratio
- 22/0.433 kV
- Type
- Compact substation
- Secondary windings
- Triple isolated
- Vector group
- Dyn11
Lead time 8-12 weeks · Warranty 24 months from commissioning · MOQ 10 nos
Covered conductors & LT spacersGodavari4 variants
SampleCovered conductors & LT spacers Godavari · GOD-772 series
- Conductor size
- 50 mm2 to 120 mm2 (see variants)
- Voltage
- LT 1.1 kV
- Conductor
- ACSR
- Insulation
- XLPE
- Layers
- Triple (tree wire)
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 km
Biogas digesters & CBG upgradingBundeljal4 variants
SampleBiogas digesters & CBG upgrading Bundeljal · BUN-A83 series
- Plant capacity
- 100 m3/day to 2 TPD CBG (see variants)
- Feedstock
- Press mud
- Digester type
- CSTR
- Retention time
- 25 days
- Upgrade technology
- Amine
Lead time 24-36 weeks · Warranty 12 months · MOQ 5 lot
Generation forecastingVijaya3 variants
SampleGeneration forecasting Vijaya · VIJ-2B7 series
- Plant capacity
- Up to 10 MW to Up to 100 MW (see variants)
- Forecast horizon
- Day-ahead
- Resolution
- 15-minute blocks
- Update frequency
- Hourly
- Method
- NWP + machine learning
Lead time 1-2 weeks · Warranty Service level as per agreement · MOQ 2 month
DCIM softwareMysorearc5 variants
SampleServiceDCIM software Mysorearc · MYS-FA1 series
- Scope
- Up to 50 racks to Up to 1000 racks (see variants)
- Licence type
- Annual subscription
- Deployment
- On-premises
- Monitoring points
- Up to 10000
- Protocols
- IPMI
Lead time 3-5 weeks · Warranty As per contract · MOQ 1 licence
Plant decommissioning & dismantlingKakatiya6 variants
SampleServicePlant decommissioning & dismantling Kakatiya · KAK-D06 series
- Plant capacity
- 1 MW to 100 MW (see variants)
- Scope
- Dismantling with recycling
- Technology
- Wind
- Cranes
- Mobile cranes
- Material disposal
- Client store
Lead time Execution 4 weeks to 6 months · Warranty Workmanship 6 months · MOQ 1 MW
Installation & erectionArcmark6 variants
SampleServiceInstallation & erection Arcmark · ARC-C48 series
- Installation scope
- 1 MW to 100 MW (see variants)
- Scope
- Complete mechanical and electrical erection
- Manpower deployed
- 60 technicians plus supervisors
- Supervision
- Site engineer and safety officer
- Equipment
- Own cranes and erection tools
Lead time Phased by block · Warranty Defect liability 24 months · MOQ 1 MW
Feeder pillars & LT distribution boxesVindhya4 variants
SampleFeeder pillars & LT distribution boxes Vindhya · VIN-C02 series
- Rating
- 200 A to 800 A (see variants)
- Enclosure material
- Galvanised steel
- Ways
- 8-way
- Busbar
- Copper
- Incomer
- MCCB
Lead time 4-5 weeks · Warranty 24 months from supply · MOQ 1 nos
Contract engineersAjanta6 variants
SampleServiceContract engineers Ajanta · AJA-C53 series
- Engineers deployed
- 1 engineer to 50 engineers (see variants)
- Discipline
- Mechanical
- Experience
- 5-10 years
- Qualification
- B.E./B.Tech
- Engagement
- Offsite design hub
Lead time Profiles in 3 days · Warranty As per contract · MOQ 1 man-month
PCC, MCC, ACDB, DCDBKamrup4 variants
SamplePCC, MCC, ACDB, DCDB Kamrup · KAM-706 series
- Rating
- 250 A to 1000 A (see variants)
- Panel type
- PCC
- System voltage
- 415 V AC
- Short-circuit rating
- 65 kA/1 s
- Form of separation
- Form 3b
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 2 nos
ESCO & performance contractingKamrup5 variants
SampleServiceESCO & performance contracting Kamrup · KAM-DB4 series
- Investment size
- INR 25 lakh to INR 10 crore (see variants)
- Contract model
- Annuity
- Term
- 5 years
- Savings share
- 80:20
- M&V
- Option C whole facility
Lead time Implementation 2-6 months · Warranty Savings guarantee as per contract · MOQ 1 project