Hot-dip galvanisingNarmada4 variants
SampleServiceHot-dip galvanising Narmada · NAR-F62 series
- Minimum zinc coating
- 85 micron to 610 g/sq m (see variants)
- Item type
- Structure assembly
- Max piece length
- 14 m
- Bath size
- 14 x 1.8 x 3.5 m
- Zinc purity
- 99.95%
Lead time 1-2 weeks · Warranty Free re-galvanising for rejected pieces · MOQ 1 MT
Lighting poles & armsVijaya6 variants
SampleLighting poles & arms Vijaya · VIJ-433 series
- Height
- 4 m to 12 m (see variants)
- Pole shape
- Round tubular
- Material
- Aluminium
- Wall thickness
- 4 mm
- Galvanising
- Hot dip 120 micron
Lead time 4-5 weeks · Warranty 12 months from supply · MOQ 1 nos
Excavators, backhoes & loadersJhelum6 variants
SampleFor rentExcavators, backhoes & loaders Jhelum · JHE-EE5 series
- Operating weight
- 3 t mini to 36 t (see variants)
- Bucket capacity
- 1.5 cu m
- Operator
- Included
- Fuel
- Included
- Attachments
- Hydraulic breaker
Lead time 1-2 days · Warranty Breakdown replacement within 48 h · MOQ 1 nos
Survey & inspection dronesGridmax4 variants
SampleFor rentSurvey & inspection drones Gridmax · GRI-FC1 series
- Drone class
- RTK mapping to Heavy payload (see variants)
- Sensor
- 20 MP RGB
- Positioning
- RTK
- Flight time
- 30 min
- Pilot
- DGCA pilot plus visual observer
Lead time 1 week · Warranty Re-flight at no charge if data unusable · MOQ 1 nos
OHE masts, cantilevers & catenarySabarmati4 variants
SampleOHE masts, cantilevers & catenary Sabarmati · SAB-1C9 series
- Mast type
- Double track mast to Tunnel bracket (see variants)
- Section
- Tubular
- Height
- 9.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty As per contract · MOQ 10 nos
High-mast & flood lightsKaveriprakash3 variants
SampleHigh-mast & flood lights Kaveriprakash · KAV-962 series
- Wattage
- 400 W to 1000 W (see variants)
- Luminous efficacy
- 150 lm/W
- Beam angle
- 120 deg
- Colour temperature
- 5700 K
- CRI
- Above 80
Lead time 2-3 weeks · Warranty 60 months from supply · MOQ 2 nos
InvertersSamarthline5 variants
Samarthline · SAM-3C2 series
- AC rated power
- 25 kW to 1000 kW (see variants)
- Phase
- Three phase
- Max DC input voltage
- 1000 V
- MPPT range
- 200-800 V
- Number of MPPT
- 6
Lead time 1-2 weeks · Warranty 10 years extended · MOQ 10 nos
Gas-based suppressionKavachcore4 variants
SampleGas-based suppression Kavachcore · KAV-616 series
- Protected volume
- Up to 50 m³ to 400-1000 m³ (see variants)
- Agent
- CO2
- Cylinder pressure
- 42 bar
- Discharge time
- 60 seconds (inert gas)
- Detection
- Cross-zoned smoke detectors
Lead time 8-12 weeks · Warranty 24 months from supply · MOQ 2 set
Generation forecastingAmaravati4 variants
SampleGeneration forecasting Amaravati · AMA-2B8 series
- Plant capacity
- Up to 50 MW to Up to 500 MW (see variants)
- Forecast horizon
- 7-day
- Resolution
- 15-minute blocks
- Update frequency
- Hourly
- Method
- Satellite cloud-motion
Lead time 1-2 weeks · Warranty Service level as per agreement · MOQ 2 month
Active harmonic filtersMahanadi3 variants
SampleActive harmonic filters Mahanadi · MAH-FF8 series
- Compensation current
- 100 A to 200 A (see variants)
- Voltage
- 3-ph 480 V
- Wires
- 4-wire
- Harmonic order
- 2nd to 25th
- Response time
- < 100 µs sampling
Lead time 6-8 weeks · Warranty 24 months from commissioning · MOQ 1 nos
ESCO & performance contractingKiransys5 variants
SampleServiceESCO & performance contracting Kiransys · KIR-B91 series
- Investment size
- INR 50 lakh to INR 25 crore (see variants)
- Contract model
- Guaranteed savings
- Term
- 7 years
- Savings share
- 80:20
- M&V
- IPMVP Option B
Lead time Implementation 2-6 months · Warranty Savings guarantee as per contract · MOQ 1 project
Cooling-water & boiler chemicalsDwarakaprakash4 variants
SampleCooling-water & boiler chemicals Dwarakaprakash · DWA-8C5 series
- Pack size
- 50 kg to 1000 kg (see variants)
- Chemical type
- pH booster
- Form
- Liquid
- Active content
- 50%
- pH of product
- 9-11
Lead time 3-7 days · Warranty 24 months in sealed pack · MOQ 1 kg
Conveyors & material handlingArcmark6 variants
SampleConveyors & material handling Arcmark · ARC-767 series
- Belt width
- 400 mm to 1200 mm (see variants)
- Belt type
- PVC
- Capacity
- 50 TPH
- Belt speed
- 1.0 m/s
- Idler pitch
- 1.5 m
Lead time 6-8 weeks · Warranty 18 months from supply · MOQ 1 m
Generation forecastingTaxilaarc4 variants
SampleGeneration forecasting Taxilaarc · TAX-637 series
- Plant capacity
- Up to 10 MW to Up to 250 MW (see variants)
- Forecast horizon
- 7-day
- Resolution
- 15-minute blocks
- Update frequency
- Every 15 minutes
- Method
- Satellite cloud-motion
Lead time 1-2 weeks · Warranty Monthly accuracy report included · MOQ 10 month
BESS thermal management & HVACSutlejsurya3 variants
SampleBESS thermal management & HVAC Sutlejsurya · SUT-B86 series
- Cooling capacity
- 25 kW to 60 kW (see variants)
- Type
- Liquid chiller
- Refrigerant
- R410A
- Coolant
- Deionised water glycol
- Supply voltage
- 230 V 1-ph
Lead time 6-8 weeks · Warranty 24 months · MOQ 2 nos
Bird diverters, aviation warning spheres & anti-climbing devicesBrahmaputrasamarth5 variants
SampleBird diverters, aviation warning spheres & anti-climbing devices Brahmaputrasamarth · BRA-517 series
- Conductor / size
- Spiral for 15-30 mm to Anti-climbing spikes (see variants)
- Material
- Fibreglass
- Colour
- White
- Visibility
- Glow in dark
- Fixing
- Clip-on
Lead time 2-3 weeks · Warranty 24 months · MOQ 5 nos
Product certification (BIS, IEC, ALMM)Urjatron3 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Urjatron · URJ-B82 series
- Certification scope
- Single product BIS to ALMM List-I (see variants)
- Standards covered
- IEC 62109 for inverters
- Application support
- Documentation and filing
- Test lab liaison
- NABL accredited labs
- Factory audit
- BIS inspection support
Lead time 8-24 weeks for certificate · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Small & micro wind turbinesBundelakshay4 variants
SampleSmall & micro wind turbines Bundelakshay · BUN-A22 series
- Rated power
- 1 kW to 10 kW (see variants)
- Axis
- Vertical
- Number of blades
- Helical
- Rotor diameter
- 3.2 m
- Output voltage
- 230 V AC
Lead time 4-6 weeks · Warranty 24 months · MOQ 5 nos
Resource assessment (solar, wind, hydro)Magadh4 variants
SampleServiceResource assessment (solar, wind, hydro) Magadh · MAG-CB2 series
- Measurement duration
- Desktop study to 12 months (see variants)
- Technology
- Small hydro
- Data source
- On-site measurement
- Equipment
- 80-120 m met mast with LiDAR
- Uncertainty
- Bankable assessment
Lead time Campaign 3-24 months · Warranty Data availability guarantee above 95% · MOQ 1 report
Detuned & series reactorsPrakashtek4 variants
SampleDetuned & series reactors Prakashtek · PRA-B59 series
- Rating
- 50 kVAr to 400 kVAr (see variants)
- Detuning factor
- 7% (189 Hz)
- Rated voltage
- 525 V
- Core
- CRGO silicon steel, gapped
- Winding
- Copper
Lead time 2-3 weeks · Warranty 18 months from supply · MOQ 10 nos
Substation automation (IEC 61850)Hoysala5 variants
SampleSubstation automation (IEC 61850) Hoysala · HOY-A52 series
- Bays
- Up to 8 bays to Up to 128 bays (see variants)
- Architecture
- Station bus
- Protocol
- IEC 61850 Ed 2
- Network topology
- PRP
- HMI
- Single HMI
Lead time 16-24 weeks · Warranty 36 months · MOQ 10 lot
ACSR, AAAC & HTLS conductorsTaptishakti4 variants
SampleACSR, AAAC & HTLS conductors Taptishakti · TAP-814 series
- Conductor
- Dog to Moose (see variants)
- Type
- HTLS (ACCC)
- Stranding
- 30/7
- Aluminium area
- 400 mm2
- Overall diameter
- 9.6 mm
Lead time 3-5 weeks · Warranty 12 months · MOQ 1 km
Capacitors, resistors & magneticsIndraprasthafaraday4 variants
SampleCapacitors, resistors & magnetics Indraprasthafaraday · IND-F32 series
- Value
- 100 µF to 4700 µF (see variants)
- Rated voltage
- 1100 VDC
- Capacitor type
- Snap-in electrolytic
- Tolerance
- ±20%
- Temperature range
- -40 to 85 °C
Lead time 2-4 weeks · Warranty 12 months from supply · MOQ 2 nos
EHV & HV cablesPallavafaraday3 variants
Pallavafaraday · PAL-5E4 series
- Rating
- 66 kV 1C x 300 sq mm Al to 110 kV 1C x 630 sq mm Al (see variants)
- Conductor
- Stranded copper
- Insulation
- XLPE (dry cured)
- Metallic screen
- Copper wire + Al laminate
- Outer sheath
- PVC ST2
Lead time 10-14 weeks · Warranty 24 months from commissioning · MOQ 2 km