Wind resource assessment (met masts, LiDAR, SoDAR)Setutron3 variants
SampleWind resource assessment (met masts, LiDAR, SoDAR) Setutron · SET-307 series
- Measurement height
- 50 m to 100 m (see variants)
- Instrument type
- SoDAR
- Mast construction
- Tubular guyed
- Sensors
- Cup anemometer, vane, T/RH, pressure
- Number of levels
- 10
Lead time 8-12 weeks · Warranty 12 months · MOQ 5 set
Pitch & yaw systemsSetutron5 variants
SamplePitch & yaw systems Setutron · SET-F99 series
- Turbine class
- 1.5 MW to 4.0 MW (see variants)
- System type
- Electric pitch
- Motor
- DC series wound
- Backup supply
- Ultracapacitor
- Gearbox
- Planetary 1:200
Lead time 10-14 weeks · Warranty 24 months · MOQ 2 set
Bank guarantees & surety bondsNalanda5 variants
SampleServiceBank guarantees & surety bonds Nalanda · NAL-1D8 series
- Guarantee amount
- INR 50 lakh to INR 100 crore (see variants)
- Instrument
- Bank guarantee
- Purpose
- Advance payment
- Validity
- 24 months
- Margin
- Nil with surety
Lead time Renewals 3 days · Warranty As per guarantee terms · MOQ 1 job
Concrete batching & transit mixersKavachsys5 variants
SampleFor rentConcrete batching & transit mixers Kavachsys · KAV-7B6 series
- Output capacity
- Mobile mixer 3 cu m to Pump 30 cu m/h (see variants)
- Drum capacity
- 3 cu m
- Type
- Static pump
- Operator
- Included
- Fuel
- Included
Lead time 1 week · Warranty Breakdown replacement within 48 h · MOQ 1 nos
Live-line & hot-line washingVidarbha3 variants
SampleServiceLive-line & hot-line washing Vidarbha · VID-345 series
- Voltage level
- 33 kV to 132 kV (see variants)
- Method
- Pressurised water jet
- Resistivity of water
- Demineralised water
- Scope
- Per km of line
- Frequency
- Pre- and post-monsoon
Lead time Mobilisation in 5-7 days · Warranty As per contract · MOQ 1 job
Open-access approvalsSatpura5 variants
SampleServiceOpen-access approvals Satpura · SAT-C67 series
- Contract demand
- 5 MW to 100 MW (see variants)
- Access type
- Short term
- Scope
- Application and follow-up
- Approvals
- DISCOM and STU
- Charges analysis
- Landed cost workings
Lead time Approval in 15-90 days · Warranty As per contract · MOQ 1 application
Auto-reclosers & sectionalisersSahyadrisurya6 variants
SampleAuto-reclosers & sectionalisers Sahyadrisurya · SAH-AD5 series
- Rating
- 11 kV 400 A 12.5 kA to 33 kV 630 A 16 kA (see variants)
- Device type
- Recloser
- Interrupting medium
- Vacuum
- Insulation
- Solid dielectric
- Mounting
- Substation structure
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 1 nos
Survey & inspection dronesKavachline5 variants
SampleFor rentSurvey & inspection drones Kavachline · KAV-D98 series
- Drone class
- RTK mapping to Fixed wing 100 sq km (see variants)
- Sensor
- Radiometric thermal
- Positioning
- RTK
- Flight time
- 90 min
- Pilot
- DGCA pilot plus visual observer
Lead time 2-3 days · Warranty Re-flight at no charge if data unusable · MOQ 1 nos
Transformer NIFPSKonarkakshay5 variants
Konarkakshay · KON-5C6 series
- Transformer oil volume
- Up to 10 kL to 60-100 kL (see variants)
- Principle
- Nitrogen injection and drain
- Nitrogen cylinders
- 8 x 68 L
- Operating pressure
- 150 bar
- Oil drain valve
- Pneumatic
Lead time 8-10 weeks · Warranty 24 months from commissioning · MOQ 1 set
Abrasives & cutting wheelsBeas3 variants
SampleAbrasives & cutting wheels Beas · BEA-A64 series
- Disc diameter
- 180 mm to 355 mm (see variants)
- Type
- Cutting
- Thickness
- 1 mm
- Bore
- 16 mm
- Grit
- P80
Lead time 3-7 days · Warranty Replacement for manufacturing defects · MOQ 1 nos
Resource assessment (solar, wind, hydro)Pallava4 variants
SampleServiceResource assessment (solar, wind, hydro) Pallava · PAL-C86 series
- Measurement duration
- 3 months to 18 months (see variants)
- Technology
- Small hydro
- Data source
- Hybrid with MCP
- Equipment
- Class A pyranometer station
- Uncertainty
- P50/P90 with uncertainty budget
Lead time Desktop in 2-3 weeks · Warranty Data availability guarantee above 95% · MOQ 1 report
Cable cleatsPushpakgen3 variants
Pushpakgen · PUS-251 series
- Cable diameter
- 15-20 mm to 30-45 mm (see variants)
- Arrangement
- Single
- Material
- Aluminium
- Short-circuit rating
- Up to 150 kA peak
- Fixing
- M10
Lead time 3-4 weeks · Warranty As per manufacturer · MOQ 1 nos
Battery cells & modules (LFP, NMC, sodium-ion)Dwaraka5 variants
SampleBattery cells & modules (LFP, NMC, sodium-ion) Dwaraka · DWA-F66 series
- Cell capacity
- 3.2 V 50 Ah to 3.2 V 314 Ah (see variants)
- Chemistry
- NMC
- Format
- Prismatic
- Nominal voltage
- 3.1 V
- Energy density
- 140-170 Wh/kg
Lead time 2-4 weeks · Warranty 36 months · MOQ 1 nos
Hot-gas-path parts & overhaul kitsLonavalavajra5 variants
SampleHot-gas-path parts & overhaul kits Lonavalavajra · LON-A91 series
- Turbine class
- 5 MW to 100 MW (see variants)
- Component
- Nozzles
- Stage
- Stage 1
- Base alloy
- Cobalt alloy
- Coating
- MCrAlY
Lead time 20-36 weeks · Warranty 8000 equivalent operating hours · MOQ 5 set
Isolators & earth switchesPrithvicore6 variants
SampleIsolators & earth switches Prithvicore · PRI-1C9 series
- System voltage
- 12 kV to 420 kV (see variants)
- Rated current
- 1250 A
- Type
- Pantograph
- Earth switch
- With 1 earth switch
- Short-time current
- 50 kA
Lead time 6-8 weeks · Warranty 30 months from supply · MOQ 1 nos
Module cleaning systemsTeslamark6 variants
SampleModule cleaning systems Teslamark · TES-839 series
- Plant capacity covered
- 100 kWp to 50 MWp (see variants)
- Cleaning method
- Waterless
- Drive
- Diesel tractor
- Row length handled
- Up to 40 m
- Cleaning speed
- 20 m/min
Lead time 2-3 weeks · Warranty 24 months on drive unit · MOQ 5 set
Fencing & gatesTejgen5 variants
Tejgen · TEJ-A84 series
- Fence height
- 1.5 m to 3.0 m (see variants)
- Mesh type
- Chain link 50x50 mm
- Wire diameter
- 4.5 mm
- Post
- 50 NB GI pipe
- Post spacing
- 2.5 m
Lead time 1-2 weeks · Warranty 5 years against rusting · MOQ 1 m
SCR / SNCR NOx controlKamrup4 variants
SampleSCR / SNCR NOx control Kamrup · KAM-454 series
- Flue gas flow
- 20000 Nm3/h to 250000 Nm3/h (see variants)
- Technology
- SCR
- NOx removal efficiency
- 70%
- Reagent
- Ammonia 25%
- Catalyst
- Plate type
Lead time 16-24 weeks · Warranty 12 months from commissioning · MOQ 10 set
Earth & soil resistivity testersMalwa5 variants
SampleEarth & soil resistivity testers Malwa · MAL-E96 series
- Measuring range
- 0-20 ohm to 0-30 kohm (see variants)
- Method
- 3-pole fall of potential
- Test frequency
- Auto-select 94-128 Hz
- Test current
- Up to 20 mA
- Accuracy
- +/-5%
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 2 nos
Mounting structures & trackersVindhya3 variants
SampleMounting structures & trackers Vindhya · VIN-D08 series
- Structure type
- Fixed ground mount to Single-axis tracker (see variants)
- Material
- Zn-Al-Mg coated steel
- Zinc coating
- 86 micron
- Design wind speed
- 50 m/s
- Module tilt
- 10 deg
Lead time 4-6 weeks · Warranty 10 years against corrosion · MOQ 2 kWp
Cabling, trenching & HDD worksSatpurapushpak6 variants
SampleServiceCabling, trenching & HDD works Satpurapushpak · SAT-C11 series
- Cable route length
- 1 km to 50 km (see variants)
- Method
- Trenchless HDD
- HDD capacity
- Up to 450 mm bore
- Trench depth
- 1.2 m
- Cable type
- LT armoured
Lead time Mobilisation in 7 days · Warranty Workmanship 12 months · MOQ 1 km
Fire-rated coatings & penetration sealsRajatgen5 variants
SampleFire-rated coatings & penetration seals Rajatgen · RAJ-C96 series
- Fire rating
- 30 min to 180 min (see variants)
- Product type
- Modular transit (Roxtec-type)
- Application
- Gun-applied
- Thickness
- 1 mm wet
- Smoke and toxicity
- Low smoke, halogen-free
Lead time 2-3 weeks · Warranty 10 years performance (system) · MOQ 2 kg
Pumped-storage pump-turbines & motor-generatorsPataliputravayu4 variants
SamplePumped-storage pump-turbines & motor-generators Pataliputravayu · PAT-DB1 series
- Unit rating
- 50 MW to 250 MW (see variants)
- Machine type
- Variable speed
- Head range
- 150-300 m
- Rated speed
- 333 rpm
- Mode
- Generating / pumping
Lead time 24-36 months · Warranty 24 months · MOQ 10 nos
Instrument transformers (CT, PT, CVT)Konark3 variants
SampleInstrument transformers (CT, PT, CVT) Konark · KON-BD1 series
- System voltage
- 33 kV to 132 kV (see variants)
- Type
- Current transformer
- Ratio
- 400-800/1 A
- Accuracy class
- 0.2S
- Burden
- 30 VA
Lead time 4-6 weeks · Warranty 24 months from commissioning · MOQ 1 nos