Voltage stabilisersPrakashtek6 variants
SampleVoltage stabilisers Prakashtek · PRA-C17 series
- Rating
- 5 kVA to 200 kVA (see variants)
- Input range
- 300-460 V
- Output voltage
- 230 V ±1%
- Phases
- 1-ph
- Correction speed
- 25 V/s
Lead time 1-2 weeks · Warranty 24 months from commissioning · MOQ 2 nos
Cooling towersShivaliklumen5 variants
Shivaliklumen · SHI-DA7 series
- Flow rate
- 500 m3/h to 10000 m3/h (see variants)
- Tower type
- Natural draft
- Construction
- RCC
- Fill type
- PVC film
- Range
- 10 C
Lead time 16-24 weeks · Warranty 24 months on FRP parts · MOQ 10 nos
Feasibility studies & DPRMalwatarang3 variants
SampleServiceFeasibility studies & DPR Malwatarang · MAL-629 series
- Project capacity
- 5 MW to 50 MW (see variants)
- Scope
- Pre-feasibility
- Energy yield
- WAsP wind energy assessment
- Financial model
- Project IRR, equity IRR, DSCR
- Grid assessment
- GNA/connectivity route study
Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 report
Asset & O&M managementTaxilatamra3 variants
SampleAsset & O&M management Taxilatamra · TAX-698 series
- Capacity covered
- Up to 5 MWp to Up to 100 MWp (see variants)
- Deployment
- Cloud SaaS
- Users
- 50
- Work orders
- Preventive, corrective, predictive
- Mobile app
- Android and iOS offline
Lead time 1-2 weeks · Warranty Support included for subscription term · MOQ 1 licence
Hybrid & off-grid inverters, charge controllersAwadhanant3 variants
SampleHybrid & off-grid inverters, charge controllers Awadhanant · AWA-F72 series
- Rated power
- 5 kVA to 10 kVA (see variants)
- Battery voltage
- 96 V
- Battery type
- Lead-acid
- Max PV input
- 1000 W
- Controller type
- MPPT
Lead time 1-2 weeks · Warranty 5 years on hybrid units · MOQ 10 nos
Hydro generatorsTeestaarc6 variants
Teestaarc · TEE-4F5 series
- Rating
- 3 MVA to 125 MVA (see variants)
- Generator voltage
- 6.6 kV
- Speed
- 300 rpm
- Power factor
- 0.8 lag
- Excitation
- Static
Lead time 9-12 months · Warranty 36 months · MOQ 1 nos
Impressed-current & sacrificial-anode CPNalanda5 variants
SampleImpressed-current & sacrificial-anode CP Nalanda · NAL-845 series
- TR unit rating
- 24 V 20 A to 100 V 100 A (see variants)
- System type
- Galvanic
- Anode material
- MMO titanium
- Cooling
- Air cooled
- Output
- Constant potential
Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 1 set
Feeder pillars & LT distribution boxesSahyadrisurya4 variants
SampleFeeder pillars & LT distribution boxes Sahyadrisurya · SAH-698 series
- Rating
- 100 A to 630 A (see variants)
- Enclosure material
- SMC / FRP
- Ways
- 8-way
- Busbar
- Copper
- Incomer
- Switch-fuse
Lead time 4-5 weeks · Warranty 12 months from supply · MOQ 2 nos
Power conversion systems (PCS)Tirhut5 variants
SamplePower conversion systems (PCS) Tirhut · TIR-964 series
- Rated power
- 100 kW to 1.725 MW (see variants)
- DC voltage range
- 700-1200 V
- AC output voltage
- 400 V
- Topology
- Two-level IGBT
- Peak efficiency
- 98.8%
Lead time 8-10 weeks · Warranty 5 years standard · MOQ 1 nos
SMPS & power suppliesChola3 variants
SampleSMPS & power supplies Chola · CHO-162 series
- Output rating
- 24 V / 5 A to 24 V / 20 A (see variants)
- Input voltage
- Universal 90-300 VAC
- Output voltage
- 110 VDC
- Efficiency
- > 92%
- Power factor
- > 0.95 (active PFC)
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 1 nos
Lightning arresters (ESE, conventional)Kutch4 variants
SampleLightning arresters (ESE, conventional) Kutch · KUT-0E5 series
- Protection radius (Level III)
- 55 m to 107 m (see variants)
- Type
- Franklin rod
- Advance time
- 60 µs
- Material
- Copper
- Mast
- 3 m GI pole
Lead time 2-3 weeks · Warranty 36 months · MOQ 1 nos
Insulating materials (pressboard, paper, mica, resins)Krishna3 variants
SampleInsulating materials (pressboard, paper, mica, resins) Krishna · KRI-CF8 series
- Thickness / grade
- 0.5 mm to 2 mm (see variants)
- Material
- Muscovite mica
- Density
- 1.15 g/cc
- Dielectric strength
- Min 12 kV/mm
- Form
- Sheet
Lead time 3-5 weeks · Warranty Test report per batch · MOQ 5 kg
Submarine & export cablesIndraprasthaanant4 variants
SampleSubmarine & export cables Indraprasthaanant · IND-2C3 series
- Rating
- 66 kV 3C x 300 sq mm to 220 kV 3C x 800 sq mm (see variants)
- Conductor
- Copper
- Insulation
- XLPE
- Water barrier
- Laminated aluminium
- Armour
- Single-layer galvanised steel wire
Lead time 20-28 weeks · Warranty As per contract · MOQ 10 km
Charging cables & connectors (CCS2, Type 2)Anantsys3 variants
SampleCharging cables & connectors (CCS2, Type 2) Anantsys · ANA-EE1 series
- Current rating
- 125 A to 350 A (see variants)
- Connector standard
- CCS2
- Cable length
- 7.5 m
- Phases
- 3-phase
- Rated voltage
- 250 V AC
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
Industrial & hazardous-area lightingNeelgen4 variants
SampleIndustrial & hazardous-area lighting Neelgen · NEE-FA1 series
- Wattage
- 100 W to 240 W (see variants)
- Protection concept
- Ex tb dust
- Gas group
- IIB
- Zone
- Zone 2
- Temperature class
- T6
Lead time 3-4 weeks · Warranty 36 months from supply · MOQ 1 nos
Transformer oilAravali6 variants
Aravali · ARA-E08 series
- Pack size
- 20 litre to Bulk 16000 litre (see variants)
- Grade
- Grade II
- Type
- Trace inhibited
- BDV after treatment
- Min 70 kV
- Flash point
- Min 140 deg C
Lead time 3-7 days · Warranty Test certificate per batch · MOQ 2 litre
Voltage stabilisersDeccan6 variants
SampleVoltage stabilisers Deccan · DEC-591 series
- Rating
- 5 kVA to 200 kVA (see variants)
- Input range
- 340-480 V (3-ph)
- Output voltage
- 415 V ±1%
- Phases
- 1-ph
- Correction speed
- 25 V/s
Lead time 1-2 weeks · Warranty 24 months from commissioning · MOQ 2 nos
Ethanol & biofuel plant equipmentSwarnatek6 variants
SampleEthanol & biofuel plant equipment Swarnatek · SWA-2D3 series
- Plant capacity
- 30 KLPD to 300 KLPD (see variants)
- Feedstock
- Sugarcane juice
- Distillation
- Multi-pressure
- Dehydration
- Molecular sieve
- Product purity
- 99.8% v/v
Lead time 14-20 months · Warranty 12 months · MOQ 1 lot
Supply-chain / invoice financeMadurai3 variants
SampleServiceSupply-chain / invoice finance Madurai · MAD-CA1 series
- Programme limit
- INR 5 crore to INR 25 crore (see variants)
- Structure
- Invoice discounting
- Advance rate
- 80-85% of invoice
- Tenor
- Up to 120 days
- Recourse
- With recourse
Lead time Funding in 24-72 hours after approval · Warranty As per programme terms · MOQ 1 job
Inverter & PCS sparesAravali3 variants
SampleInverter & PCS spares Aravali · ARA-6C2 series
- Inverter rating
- 175 kW to 1 MW (see variants)
- Component
- Capacitor
- DC voltage
- 1500 V
- Cooling
- Liquid
- Fits make
- As per inverter nameplate
Lead time 1-2 weeks · Warranty 6 months for repaired units · MOQ 2 nos
SCADA / EMS / DMS platformsPallava4 variants
SampleSCADA / EMS / DMS platforms Pallava · PAL-166 series
- Points / tags
- 500 tags to 50,000 tags (see variants)
- Architecture
- Web-based
- Protocols
- OPC UA
- Database
- SQL
- Redundancy
- Hot standby
Lead time 12-20 weeks · Warranty 36 months support · MOQ 1 licence
Third-party inspection (TPI)Kaverispark6 variants
SampleServiceThird-party inspection (TPI) Kaverispark · KAV-216 series
- Inspection effort
- 1 man-day to 100 man-days (see variants)
- Equipment inspected
- Towers and structures
- Inspection stage
- Final pre-dispatch
- Standards used
- Per client specification
- Inspector qualification
- B.E. Electrical with 8 years experience
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Casting & forgingChambalurja3 variants
SampleServiceCasting & forging Chambalurja · CHA-D73 series
- Casting weight
- Up to 5 kg to Up to 100 kg (see variants)
- Material
- FG 260
- Process
- Sand casting
- Pattern
- Made by foundry
- Machining
- Rough
Lead time 6-8 weeks · Warranty 12 months against casting defects · MOQ 1 kg
Glands & lugsCoorgkavach6 variants
Coorgkavach · COO-4B6 series
- Size
- 20 to 63 (see variants)
- Item
- Gland
- Material
- Tinned copper
- Gland type
- CW
- Thread
- NPT
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 2 nos