AMC & breakdown servicesTungabhadra5 variants
SampleServiceAMC & breakdown services Tungabhadra · TUN-018 series
- Equipment value covered
- INR 25 lakh to INR 5 crore (see variants)
- Coverage
- Comprehensive with parts
- Visits
- 2 per year
- Response time
- 8 hours
- Spare parts
- Consumables only
Lead time Emergency mobilisation in 4-24 hours · Warranty Parts replaced covered for 6 months · MOQ 1 job
Smart lighting controls & CCMSSahyadri3 variants
SampleSmart lighting controls & CCMS Sahyadri · SAH-C21 series
- Capacity
- 63 A to 200 A (see variants)
- Controller type
- CCMS feeder panel
- Communication
- NB-IoT
- Protocol
- 0-10 V
- Phases
- 1-phase
Lead time 4-6 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Pumped-storage pump-turbines & motor-generatorsTirhutamrit3 variants
SamplePumped-storage pump-turbines & motor-generators Tirhutamrit · TIR-823 series
- Unit rating
- 100 MW to 250 MW (see variants)
- Machine type
- Variable speed
- Head range
- 600-800 m
- Rated speed
- 333 rpm
- Mode
- Generating / pumping
Lead time 24-36 months · Warranty 60 months · MOQ 5 nos
Energy meters (smart, ABT, net)Konkan5 variants
SampleEnergy meters (smart, ABT, net) Konkan · KON-A07 series
- Meter type
- 1-ph smart 5-30 A to ABT 0.2S 3P4W (see variants)
- Accuracy class
- 1.0
- Reference voltage
- 3x63.5/110 V
- Frequency
- 50 Hz
- Communication
- RF mesh
Lead time 4-6 weeks · Warranty 60 months from installation · MOQ 1 nos
Flexible, trailing & mining cablesWayanadprabha3 variants
SampleFlexible, trailing & mining cables Wayanadprabha · WAY-FF2 series
- Size
- 3C x 6 sq mm to 3C x 35 sq mm (see variants)
- Voltage grade
- 3.3 kV
- Conductor
- Bare copper class 5
- Insulation
- Rubber
- Sheath
- HOFR CSP
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 5 m
Carbon credits & offsetsKonark3 variants
SampleServiceCarbon credits & offsets Konark · KON-239 series
- Annual credits
- 5,000 tCO2e to 50,000 tCO2e (see variants)
- Programme
- Both
- Project type
- Waste heat
- Methodology
- Baseline development
- MRV
- Annual report
Lead time Registration 6-18 months · Warranty As per contract · MOQ 1 job
Sensors & transducersBeasprithvi3 variants
SampleSensors & transducers Beasprithvi · BEA-276 series
- Sensor type
- Voltage 1000 V to PT100 4-wire (see variants)
- Output
- PNP NO
- Accuracy
- Class A (RTD)
- Supply voltage
- 10-30 VDC
- Response time
- < 5 µs
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 nos
Insulated gloves & matsIndraprasthasudarshan3 variants
SampleInsulated gloves & mats Indraprasthasudarshan · IND-019 series
- Voltage class
- Class 00 (500 V) to Class 1 (7.5 kV) (see variants)
- Gloves length
- 280 mm
- Proof test
- 40 kV
- Material
- Composite
- Mat thickness
- 3 mm
Lead time 1-2 weeks · Warranty 24 months · MOQ 2 nos
Title search & land documentationArcmark3 variants
SampleServiceTitle search & land documentation Arcmark · ARC-CE6 series
- Parcels covered
- 25 parcels to 100 parcels (see variants)
- Search depth
- Back to root of title
- Deliverables
- Title opinion
- Records checked
- Court and RERA databases
- Registration
- Drafting only
Lead time Batch 2-6 weeks · Warranty Professional indemnity · MOQ 1 case
Fire-survival & LSZH cablesPallavafaraday6 variants
SampleFire-survival & LSZH cables Pallavafaraday · PAL-D26 series
- Size
- 3C x 2.5 sq mm to 4C x 120 sq mm (see variants)
- Fire resistance
- Circuit integrity 180 min
- Insulation
- XLPE
- Sheath
- LSZH
- Conductor
- Copper
Lead time 4-5 weeks · Warranty 12 months from supply · MOQ 1 m
Operational all-risk & machinery breakdown insuranceCoorg6 variants
SampleServiceOperational all-risk & machinery breakdown insurance Coorg · COO-698 series
- Sum insured
- INR 5 crore to INR 1000 crore (see variants)
- Policy
- Machinery breakdown
- Business interruption
- Loss of revenue cover
- Deductible
- Standard
- Perils
- Fire, lightning, natural catastrophe
Lead time Quote in 3-5 days · Warranty Claims support · MOQ 1 job
Inverter & PCS sparesNalanda3 variants
SampleInverter & PCS spares Nalanda · NAL-1F1 series
- Inverter rating
- 10 kW to 100 kW (see variants)
- Component
- SPD
- DC voltage
- 1000 V
- Cooling
- Forced air
- Fits make
- As per inverter nameplate
Lead time 1-2 weeks · Warranty 6 months for repaired units · MOQ 1 nos
Resource assessment (solar, wind, hydro)Deepmark6 variants
SampleServiceResource assessment (solar, wind, hydro) Deepmark · DEE-C85 series
- Measurement duration
- Desktop study to 24 months (see variants)
- Technology
- Solar GHI/DNI
- Data source
- Satellite and reanalysis
- Equipment
- Class A pyranometer station
- Uncertainty
- P50/P90 with uncertainty budget
Lead time Desktop in 2-3 weeks · Warranty Data availability guarantee above 95% · MOQ 1 report
Type & routine testing laboratories (NABL)Dwaraka3 variants
SampleServiceType & routine testing laboratories (NABL) Dwaraka · DWA-4F8 series
- Test class
- Type test (MV) to Short-circuit test (see variants)
- Equipment under test
- Cables
- Accreditation
- NABL ISO/IEC 17025
- Rating range
- Up to 400 kV
- Test standard
- IS or IEC as specified
Lead time Slot in 1-2 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Supply-chain / invoice financeRavinandi6 variants
SampleServiceSupply-chain / invoice finance Ravinandi · RAV-C63 series
- Programme limit
- INR 25 lakh to INR 100 crore (see variants)
- Structure
- Invoice discounting
- Advance rate
- 90% of invoice
- Tenor
- Up to 180 days
- Recourse
- Without recourse
Lead time Onboarding in 1-2 weeks · Warranty No hidden fees · MOQ 1 job
Static VAR compensators (SVC)Bundel4 variants
SampleStatic VAR compensators (SVC) Bundel · BUN-728 series
- Rating
- 10 MVAr to 80 MVAr (see variants)
- System voltage
- 66 kV
- Configuration
- TSC only
- Thyristor valve
- Air-cooled
- Response time
- < 20 ms
Lead time 20-28 weeks · Warranty 36 months from commissioning · MOQ 2 nos
Corrosion monitoringRajattek3 variants
SampleCorrosion monitoring Rajattek · RAJ-596 series
- Channel count
- 2 channel to 8 channel (see variants)
- Measurement
- Pipe-to-soil potential
- Range
- 0-2 V
- Accuracy
- +/-1 mV
- Logging interval
- 15 min
Lead time 2-3 weeks · Warranty 24 months with calibration · MOQ 1 set
Tower erection gin poles & derricksBrahmaputraurja4 variants
SampleTower erection gin poles & derricks Brahmaputraurja · BRA-907 series
- Safe working load
- 1 t to 5 t (see variants)
- Pole type
- Lattice
- Pole length
- 18 m
- Material
- MS galvanised
- Winch
- Electric
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 1 set
Earth pits, chambers & enhancing compoundsBeasspark5 variants
SampleEarth pits, chambers & enhancing compounds Beasspark · BEA-E76 series
- Type / size
- Chamber 300x300 mm to Compound 25 kg bag (see variants)
- Chamber material
- Polymer concrete
- Cover load rating
- Class C 250 kN
- Compound type
- Marconite-type conductive
- Resistivity
- < 0.2 Ω·m
Lead time 1-2 weeks · Warranty As per manufacturer, 5 years life · MOQ 2 nos
SF6 gas & handlingUrjamark5 variants
Urjamark · URJ-D41 series
- Cylinder size
- 1 kg to 40 kg (see variants)
- Purity
- 99.995%
- Moisture
- Below 5 ppmv
- Cylinder
- Aluminium
- Valve
- CGA 590
Lead time 1-2 weeks · Warranty Test certificate per cylinder · MOQ 10 kg
Pre-engineered buildings (PEB)Malabaranant5 variants
SamplePre-engineered buildings (PEB) Malabaranant · MAL-F83 series
- Clear span
- 12 m to 30 m (see variants)
- Primary frame
- Built-up tapered I-section
- Steel grade
- IS 2062 E350
- Roof sheeting
- 0.5 mm Galvalume
- Wall cladding
- 0.45 mm PPGI
Lead time 8-12 weeks · Warranty 20 years sheet coating (limited) · MOQ 10 sq m
OHE masts, cantilevers & catenaryKakatiya6 variants
SampleOHE masts, cantilevers & catenary Kakatiya · KAK-F84 series
- Mast type
- Single track mast to Booster mast (see variants)
- Section
- Tubular
- Height
- 11.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty As per contract · MOQ 1 nos
Insulating materials (pressboard, paper, mica, resins)Voltcore5 variants
SampleInsulating materials (pressboard, paper, mica, resins) Voltcore · VOL-572 series
- Thickness / grade
- 0.5 mm to 5 mm (see variants)
- Material
- Epoxy
- Density
- 1.25 g/cc
- Dielectric strength
- Min 8 kV/mm in oil
- Form
- Roll
Lead time 1-2 weeks · Warranty Test report per batch · MOQ 1 kg
Tower erection gin poles & derricksPataliputra5 variants
SampleTower erection gin poles & derricks Pataliputra · PAT-C72 series
- Safe working load
- 500 kg to 5 t (see variants)
- Pole type
- Lattice
- Pole length
- 24 m
- Material
- MS galvanised
- Winch
- Electric
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 1 set