Catalogue

Every product and service of the power sector, arranged in technical and professional groups. Listed by verified manufacturers and merchants; every order and GST invoice goes through BARREL.

13 groups · 59 categories · 435 sub-categories

Listings (15,240)

Prices are shown to verified buyers. Register your company to see them and request quotes.

Regulatory advisory on open access and banking, Ultra series

SampleServiceTariff & regulatory advisory

Guptaphase · GUP-105 series

Matter complexity
Simple petition to Appeal before APTEL (see variants)
Forum
State Electricity Regulatory Commission
Deliverable
Opinion note
Representation
Drafting only
Data support
Benchmark analysis

Lead time Petition 4-8 weeks · Warranty Free redrafting if Commission raises defects · MOQ 1 case

Price on quote

by Guptaphase Infra Services (Sample) · invoiced by BARREL

Request quote

ODC transport for power transformers, Flex series

SampleServiceODC & heavy-haul transport

Malwavolt · MAL-8F1 series

Consignment weight
20 tonnes to 100 tonnes (see variants)
Equipment
Low-bed trailer
Route survey
Optional
Escort and permits
Police and highway permits included
Insurance
Marine-cum-road transit insurance

Lead time Dispatch in 5-10 days · Warranty Carrier liability as per law · MOQ 1 job

Price on quote

by Malwavolt Technical Services (Sample) · invoiced by BARREL

Request quote

350 bar hydrogen dispenser, Plus 3 series

SampleHydrogen dispensers & refuelling stations

Saurashtra · SAU-C98 series

Daily capacity
100 kg/day to 1000 kg/day (see variants)
Dispensing pressure
350 bar
Fill protocol
SAE J2601
Pre-cooling
None
Nozzle
H70

Lead time 20-26 weeks · Warranty 24 months · MOQ 1 nos

Price for verified buyers

by Saurashtra New Energy (Sample) · invoiced by BARREL

Request quote

Rajatsys · RAJ-225 series

Type
Double-point harness to Self-retracting lifeline 10 m (see variants)
Attachment points
Dorsal + front + side
Material
Polyester webbing 45 mm
Shock absorber
Included, <6 kN arrest force
Lanyard length
1.8 m

Lead time 1-2 weeks · Warranty 12 months against defects · MOQ 5 nos

Price for verified buyers

by Rajatsys Safety Systems (Sample) · invoiced by BARREL

Request quote

Transformer rectifier unit, Xtra 5 series

SampleImpressed-current & sacrificial-anode CP

Wattsys · WAT-C36 series

TR unit rating
50 V 25 A to 100 V 100 A (see variants)
System type
ICCP
Anode material
Magnesium 17 lb
Cooling
Oil cooled
Output
Constant potential

Lead time 6-8 weeks · Warranty Anode life as per design (20 years) · MOQ 1 set

Price on quote

by Wattsys Corrosion Engineers (Sample) · invoiced by BARREL

Request quote

Saurashtra · SAU-163 series

Configuration
4-way (2LBS+LBS+VCB) to 5-way (3LBS+2VCB) (see variants)
Rated voltage
24 kV
Rated current - ring
400 A
Transformer feeder
200 A fuse-switch
Short-circuit rating
25 kA/3 s

Lead time 8-12 weeks · Warranty 12 months from commissioning · MOQ 1 nos

Price for verified buyers

by Saurashtra Switchboards (Sample) · invoiced by BARREL

Request quote

Single-phase prepaid smart meter, Volt series

SamplePrepaid metering systems

Pennar · PEN-F01 series

Meter type
1-ph 5-30 A to 3-ph LTCT 5 A (see variants)
Accuracy class
0.5S
Communication
GPRS/4G
Protocol
IS 15959 Part 2
Disconnect relay
Internal 200 A (3-ph)

Lead time 3-4 weeks · Warranty 7 years from supply · MOQ 10 nos

Price for verified buyers

by Pennar Metering Systems (Sample) · invoiced by BARREL

Request quote

Star-delta starter panel, Eco series

SampleContactors, overload relays & motor starters

Dwarakaurja · DWA-8B3 series

Rating
32 A to 185 A (see variants)
Device type
Overload relay
Coil voltage
24 V AC
Utilisation category
AC-3
Motor rating at 415 V
55 kW

Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos

Price for verified buyers

by Dwarakaurja Panels (Sample) · invoiced by BARREL

Request quote

Pre-commissioning tests for substations, Eco series

SampleServiceSite acceptance & pre-commissioning tests

Kamrup · KAM-1A9 series

Plant size
5 MW to 100 MW (see variants)
Scope
Electrical pre-commissioning
Instruments
Relay test set, IV tracer, CRM
Test sequence
Per client approved format
Team
Team of 6 with lead

Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site

Price for verified buyers

by Kamrup Projects (Sample) · invoiced by BARREL

Request quote

Tripod turnstile, Pro series

SampleAccess control & boom barriers

Vijayavajra · VIJ-4C1 series

Type
Boom barrier 6 m to ANPR gate system (see variants)
Opening time
6 s
Boom length
3 m
Credential
QR code
Capacity
50,000 users

Lead time 2-3 weeks · Warranty 24 months from supply · MOQ 2 nos

Price on quote

by Vijayavajra Security Solutions (Sample) · invoiced by BARREL

Request quote

OPGW (optical ground wire), Titan series

SampleFibre optic (OPGW, ADSS)

Krishna · KRI-B73 series

Fibre count
12F to 96F (see variants)
Cable type
OPGW
Fibre type
G.652D single-mode
Structure
Stainless steel loose tube
Short-circuit rating
120 kA2s

Lead time 10-14 weeks · Warranty 24 months from supply · MOQ 1 km

Price on quote

by Krishna Wires & Cables (Sample) · invoiced by BARREL

Request quote

BEE 5 star ceiling fan, Prime 3 series

SampleEnergy-efficient appliances (BEE star rated)

Tejtek · TEJ-A97 series

Capacity or rating
1 ton AC to 5 ton package AC (see variants)
BEE star rating
5 star
Technology
Fixed speed
ISEER
5.5
Refrigerant
R32

Lead time Delivery in 5-10 days · Warranty Product 1-3 years · MOQ 1 nos

Price on quote

by Tejtek Advisory (Sample) · invoiced by BARREL

Request quote

Three-phase STS cabinet, Core 6 series

SampleStatic transfer switches

Satavahana · SAT-B45 series

Rating
32 A to 250 A (see variants)
Phase
3-phase 4-wire
Rated voltage
230 V AC
Transfer time
Below 6 ms
Transfer type
Make-before-break

Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 1 nos

Price for verified buyers

by Satavahana Critical Power (Sample) · invoiced by BARREL

Request quote

Catalyst module, Pro 3 series

SampleSCR / SNCR NOx control

Kamrup · KAM-736 series

Flue gas flow
20000 Nm3/h to 1000000 Nm3/h (see variants)
Technology
SCR
NOx removal efficiency
40%
Reagent
Ammonia 25%
Catalyst
Honeycomb V2O5-WO3/TiO2

Lead time 30-44 weeks · Warranty 12 months from commissioning · MOQ 1 set

Price on quote

by Kamrup Emission Systems (Sample) · invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited