Bushings, OLTC & transformer accessoriesSabarmati5 variants
SampleBushings, OLTC & transformer accessories Sabarmati · SAB-4F3 series
- Voltage class
- 33 kV to 400 kV (see variants)
- Component
- OTI/WTI
- Current rating
- 1250 A
- Insulation type
- RIS
- Creepage
- 31 mm/kV
Lead time 3-6 weeks · Warranty 24 months · MOQ 10 nos
Bird diverters, aviation warning spheres & anti-climbing devicesKanchi6 variants
SampleBird diverters, aviation warning spheres & anti-climbing devices Kanchi · KAN-084 series
- Conductor / size
- Spiral for 10-15 mm to Anti-climbing spikes (see variants)
- Material
- Hot-dip galvanised steel
- Colour
- Red and white
- Visibility
- Day and night reflective
- Fixing
- Bolted
Lead time 2-3 weeks · Warranty 12 months · MOQ 10 nos
Earthing & auxiliary transformersMauryajal5 variants
SampleEarthing & auxiliary transformers Mauryajal · MAU-FC5 series
- Rating
- 100 kVA to 1600 kVA (see variants)
- Type
- Auxiliary (Dyn11)
- Primary voltage
- 11 kV
- Secondary voltage
- 0.433 kV
- Short-time rating
- 30 s
Lead time 3-5 weeks · Warranty 18 months · MOQ 1 nos
Traction substations & transformersLumengen3 variants
SampleTraction substations & transformers Lumengen · LUM-569 series
- Rating
- 20 MVA to 30 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 27.5 kV
- Connection
- V-V
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 36 months from supply · MOQ 1 nos
Substation automation (IEC 61850)Sabarmatideep5 variants
SampleSubstation automation (IEC 61850) Sabarmatideep · SAB-084 series
- Bays
- Up to 8 bays to Up to 128 bays (see variants)
- Architecture
- Station bus
- Protocol
- DNP3
- Network topology
- Dual star
- HMI
- Redundant servers
Lead time 10-14 weeks · Warranty 36 months · MOQ 1 lot
Furnace & rectifier transformersBundel5 variants
SampleFurnace & rectifier transformers Bundel · BUN-694 series
- Rating
- 5 MVA to 60 MVA (see variants)
- Primary voltage
- 11 kV
- Secondary voltage
- Up to 400 V DC rectified
- Application
- Rectifier
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 1 nos
SF6-free (vacuum, clean-air) HV breakersKonkanparam3 variants
SampleSF6-free (vacuum, clean-air) HV breakers Konkanparam · KON-528 series
- System voltage
- 145 kV to 245 kV (see variants)
- Insulation medium
- Fluoronitrile mix
- Interrupter
- Multi-break vacuum
- Rated current
- 3150 A
- Breaking current
- 31.5 kA
Lead time 30-40 weeks · Warranty 24 months · MOQ 2 nos
Control & relay panelsSabarmatideep6 variants
SampleControl & relay panels Sabarmatideep · SAB-4D4 series
- System voltage
- 11 kV to 400 kV (see variants)
- Panel type
- Free-standing
- Bay type
- Line
- Protection
- Distance + DEF
- Panel size
- 1000 x 800 x 2200 mm
Lead time 10-14 weeks · Warranty 30 months from supply · MOQ 1 nos
Numerical relaysJalcore4 variants
Jalcore · JAL-9E9 series
- Function
- Motor protection to Line distance (see variants)
- Aux supply
- 110 V DC
- CT input
- 1 A
- VT input
- 63.5 V
- Binary inputs
- 32
Lead time 3-6 weeks · Warranty 36 months · MOQ 1 nos
Substation automation (IEC 61850)Tejtron5 variants
SampleSubstation automation (IEC 61850) Tejtron · TEJ-873 series
- Bays
- Up to 8 bays to Up to 128 bays (see variants)
- Architecture
- Station bus
- Protocol
- DNP3
- Network topology
- PRP
- HMI
- Redundant servers
Lead time 16-24 weeks · Warranty 24 months · MOQ 5 lot
Power transformersTamratek6 variants
Tamratek · TAM-278 series
- Rating
- 31.5 MVA to 500 MVA (see variants)
- Voltage ratio
- 220/132 kV
- Cooling
- ONAN/ONAF
- Vector group
- YNyn0 d11
- Tap changer
- OLTC 1.25% steps
Lead time 16-24 weeks · Warranty 24 months from commissioning · MOQ 10 nos
Control & relay panelsTaxila3 variants
SampleControl & relay panels Taxila · TAX-717 series
- System voltage
- 66 kV to 220 kV (see variants)
- Panel type
- Simplex
- Bay type
- Transformer
- Protection
- O/C + E/F
- Panel size
- 1000 x 800 x 2200 mm
Lead time 6-8 weeks · Warranty 30 months from supply · MOQ 2 nos
Contact & messenger wiresKakatiya5 variants
SampleContact & messenger wires Kakatiya · KAK-012 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Copper magnesium
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 1 km
Compact secondary substationsKakatiya3 variants
SampleCompact secondary substations Kakatiya · KAK-573 series
- Transformer rating
- 250 kVA to 630 kVA (see variants)
- Primary voltage
- 11 kV
- Secondary voltage
- 0.433 kV
- HV equipment
- VCB panel
- Transformer type
- Oil-immersed
Lead time 10-14 weeks · Warranty 18 months · MOQ 5 nos
Lattice towers & monopolesGodavari3 variants
SampleLattice towers & monopoles Godavari · GOD-CF3 series
- Voltage class
- 132 kV to 400 kV (see variants)
- Type
- Monopole
- Circuit
- Single
- Tower type
- D dead end
- Height
- 18 m
Lead time 14-20 weeks · Warranty As per contract · MOQ 1 MT
Mobile substationsAjantajyoti3 variants
Ajantajyoti · AJA-8E3 series
- Transformer rating
- 5 MVA to 20 MVA (see variants)
- Primary voltage
- 66 kV
- Secondary voltage
- 11 kV
- Chassis
- Skid
- Primary switchgear
- GIS bay
Lead time 30-40 weeks · Warranty 36 months · MOQ 5 nos
Numerical relaysPushpakmax4 variants
Pushpakmax · PUS-C46 series
- Function
- Motor protection to Line distance (see variants)
- Aux supply
- 110 V DC
- CT input
- 1/5 A selectable
- VT input
- 63.5 V
- Binary inputs
- 32
Lead time 8-10 weeks · Warranty 24 months · MOQ 2 nos
SF6-free (vacuum, clean-air) HV breakersPrithvimax4 variants
SampleSF6-free (vacuum, clean-air) HV breakers Prithvimax · PRI-2A6 series
- System voltage
- 36 kV to 170 kV (see variants)
- Insulation medium
- Clean air
- Interrupter
- Multi-break vacuum
- Rated current
- 2000 A
- Breaking current
- 25 kA
Lead time 16-20 weeks · Warranty 24 months · MOQ 1 nos
Bushings, OLTC & transformer accessoriesCoromandel6 variants
SampleBushings, OLTC & transformer accessories Coromandel · COR-434 series
- Voltage class
- 11 kV to 400 kV (see variants)
- Component
- Bushing
- Current rating
- 2000 A
- Insulation type
- OIP
- Creepage
- 25 mm/kV
Lead time 3-6 weeks · Warranty 24 months · MOQ 1 nos
Station batteries (Ni-Cd, VRLA)Sahyadri3 variants
SampleStation batteries (Ni-Cd, VRLA) Sahyadri · SAH-098 series
- Capacity
- 100 Ah to 300 Ah (see variants)
- Chemistry
- Ni-Cd
- Nominal cell voltage
- 2 V
- Number of cells
- 110
- Bank voltage
- 220 V
Lead time 6-8 weeks · Warranty 60 months pro-rata · MOQ 2 nos
Station batteries (Ni-Cd, VRLA)Sabarmatideep5 variants
SampleStation batteries (Ni-Cd, VRLA) Sabarmatideep · SAB-ED7 series
- Capacity
- 40 Ah to 500 Ah (see variants)
- Chemistry
- Flooded lead-acid
- Nominal cell voltage
- 1.2 V
- Number of cells
- 90
- Bank voltage
- 220 V
Lead time 3-4 weeks · Warranty 60 months pro-rata · MOQ 10 nos
Section insulators & neutral sectionsUrjaline5 variants
SampleSection insulators & neutral sections Urjaline · URJ-2A9 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Epoxy glass
- Length
- 20 m
- Rated current
- 400 A
Lead time 8-10 weeks · Warranty 12 months · MOQ 5 nos
Bushings, OLTC & transformer accessoriesEllora4 variants
SampleBushings, OLTC & transformer accessories Ellora · ELL-176 series
- Voltage class
- 66 kV to 400 kV (see variants)
- Component
- PRV
- Current rating
- 1250 A
- Insulation type
- RIS
- Creepage
- 25 mm/kV
Lead time 3-6 weeks · Warranty 18 months · MOQ 5 nos
Poles (PSC, steel, tubular)Tungabhadrajal4 variants
SamplePoles (PSC, steel, tubular) Tungabhadrajal · TUN-A43 series
- Pole length
- 9 m to 16 m (see variants)
- Type
- PSC
- Working load
- 140 kg
- Cross section
- Rectangular
- Steel grade
- Fe 410
Lead time 2-3 weeks · Warranty 12 months · MOQ 5 nos