Hybrid & dead-tank switchgearSahyadritamra3 variants
SampleHybrid & dead-tank switchgear Sahyadritamra · SAH-259 series
- System voltage
- 145 kV to 420 kV (see variants)
- Concept
- Hybrid
- Rated current
- 3150 A
- Breaking current
- 40 kA
- Gas
- SF6
Lead time 28-36 weeks · Warranty 36 months · MOQ 1 nos
Furnace & rectifier transformersSabarmati4 variants
SampleFurnace & rectifier transformers Sabarmati · SAB-695 series
- Rating
- 5 MVA to 40 MVA (see variants)
- Primary voltage
- 33 kV
- Secondary voltage
- Up to 400 V DC rectified
- Application
- EAF
- Cooling
- ONAN/ONAF
Lead time 28-36 weeks · Warranty 24 months · MOQ 1 nos
Traction SCADALumengen3 variants
Lumengen · LUM-6A8 series
- Control posts
- Up to 25 posts to Up to 100 posts (see variants)
- Architecture
- Redundant server
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 61850
Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 1 lot
OHE masts, cantilevers & catenaryLumengen6 variants
SampleOHE masts, cantilevers & catenary Lumengen · LUM-1C3 series
- Mast type
- Single track mast to Booster mast (see variants)
- Section
- Rolled beam
- Height
- 8 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty 12 months · MOQ 10 nos
Transformer monitoring (online DGA, bushing monitors)Tejmark3 variants
SampleTransformer monitoring (online DGA, bushing monitors) Tejmark · TEJ-9F1 series
- Gases monitored
- 3 gases to 9 gases (see variants)
- Gases measured
- H2, CO
- Technology
- Infrared
- Measurement interval
- 4 hours
- Accuracy
- +/- 5%
Lead time 4-6 weeks · Warranty 24 months · MOQ 2 nos
Bird diverters, aviation warning spheres & anti-climbing devicesKonkangrid6 variants
SampleBird diverters, aviation warning spheres & anti-climbing devices Konkangrid · KON-514 series
- Conductor / size
- Spiral for 10-15 mm to Anti-climbing spikes (see variants)
- Material
- Hot-dip galvanised steel
- Colour
- White
- Visibility
- Glow in dark
- Fixing
- Clip-on
Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos
Bay control units & gatewaysTaxila4 variants
SampleBay control units & gateways Taxila · TAX-9C9 series
- I/O capacity
- 16 DI / 8 DO to 128 DI / 64 DO (see variants)
- Analog inputs
- 8
- Protocols south
- Modbus
- Protocols north
- IEC 60870-5-104
- Interlocking
- Bay and station level
Lead time 8-10 weeks · Warranty 36 months · MOQ 1 nos
Transformer monitoring (online DGA, bushing monitors)Bundel3 variants
SampleTransformer monitoring (online DGA, bushing monitors) Bundel · BUN-9F1 series
- Gases monitored
- 3 gases to 9 gases (see variants)
- Gases measured
- H2, CO, CO2, CH4, C2H2, C2H4, C2H6
- Technology
- Gas chromatography
- Measurement interval
- 24 hours
- Accuracy
- +/- 5%
Lead time 4-6 weeks · Warranty 36 months with AMC · MOQ 2 nos
Bushings, OLTC & transformer accessoriesAwadhakshay6 variants
SampleBushings, OLTC & transformer accessories Awadhakshay · AWA-283 series
- Voltage class
- 11 kV to 400 kV (see variants)
- Component
- Bushing
- Current rating
- 3150 A
- Insulation type
- RIS
- Creepage
- 31 mm/kV
Lead time 12-20 weeks · Warranty 24 months · MOQ 5 nos
Poles (PSC, steel, tubular)Dhruvmax5 variants
SamplePoles (PSC, steel, tubular) Dhruvmax · DHR-B53 series
- Pole length
- 8 m to 16 m (see variants)
- Type
- GRP
- Working load
- 200 kg
- Cross section
- Octagonal
- Steel grade
- Fe 540
Lead time 2-3 weeks · Warranty 24 months · MOQ 1 nos
SF6-free (vacuum, clean-air) HV breakersMalabarojas3 variants
SampleSF6-free (vacuum, clean-air) HV breakers Malabarojas · MAL-3E7 series
- System voltage
- 145 kV to 245 kV (see variants)
- Insulation medium
- Dry air
- Interrupter
- Multi-break vacuum
- Rated current
- 2000 A
- Breaking current
- 31.5 kA
Lead time 30-40 weeks · Warranty 36 months · MOQ 1 nos
Insulators (porcelain, polymer, glass)Godavari4 variants
SampleInsulators (porcelain, polymer, glass) Godavari · GOD-475 series
- Voltage and strength
- 11 kV 45 kN to 132 kV 90 kN (see variants)
- Material
- Toughened glass
- Type
- Post
- Failing load
- 160 kN
- Creepage
- Anti-fog 40 mm/kV
Lead time 6-8 weeks · Warranty 24 months · MOQ 10 nos
Earthing & auxiliary transformersKaverianant5 variants
SampleEarthing & auxiliary transformers Kaverianant · KAV-FC8 series
- Rating
- 315 kVA to 3150 kVA (see variants)
- Type
- Auxiliary (Dyn11)
- Primary voltage
- 33 kV
- Secondary voltage
- 0.433 kV
- Short-time rating
- 30 s
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
EarthwireCoromandelakash4 variants
Coromandelakash · COR-B22 series
- Size
- 7/3.15 mm to OPGW 12F (see variants)
- Type
- OPGW
- Strands
- 7
- Tensile strength
- 110 kN
- Fibres
- 12
Lead time 3-5 weeks · Warranty 12 months · MOQ 1 km
Compact secondary substationsSabarmati6 variants
SampleCompact secondary substations Sabarmati · SAB-113 series
- Transformer rating
- 100 kVA to 1600 kVA (see variants)
- Primary voltage
- 33 kV
- Secondary voltage
- 0.433 kV
- HV equipment
- VCB panel
- Transformer type
- Oil-immersed
Lead time 10-14 weeks · Warranty 18 months · MOQ 1 nos
Lattice towers & monopolesTungabhadra5 variants
SampleLattice towers & monopoles Tungabhadra · TUN-CD1 series
- Voltage class
- 33 kV to 400 kV (see variants)
- Type
- Tubular
- Circuit
- Single
- Tower type
- C 15-deg angle
- Height
- 90 m
Lead time 8-12 weeks · Warranty As per contract · MOQ 2 MT
Surge arresters (station class)Madurai4 variants
SampleSurge arresters (station class) Madurai · MAD-8C5 series
- System voltage
- 36 kV to 245 kV (see variants)
- Rated voltage
- 192 kV
- Nominal discharge current
- 20 kA
- Line discharge class
- Class 3
- Housing
- Porcelain
Lead time 3-5 weeks · Warranty 36 months · MOQ 1 nos
Traction SCADATaxila5 variants
Taxila · TAX-D78 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Redundant server
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 61850
Lead time 12-16 weeks · Warranty 24 months · MOQ 1 lot
Traction substations & transformersDhruvline3 variants
SampleTraction substations & transformers Dhruvline · DHR-567 series
- Rating
- 21.6 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 27.5 kV
- Connection
- Single-phase
- Cooling
- ONAN/ONAF
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Hybrid & dead-tank switchgearTungabhadra4 variants
SampleHybrid & dead-tank switchgear Tungabhadra · TUN-CB5 series
- System voltage
- 72.5 kV to 420 kV (see variants)
- Concept
- Compact
- Rated current
- 4000 A
- Breaking current
- 40 kA
- Gas
- SF6
Lead time 16-24 weeks · Warranty 36 months · MOQ 2 nos
Bay control units & gatewaysMalabarsurya4 variants
SampleBay control units & gateways Malabarsurya · MAL-9C9 series
- I/O capacity
- 16 DI / 8 DO to 128 DI / 64 DO (see variants)
- Analog inputs
- 8
- Protocols south
- IEC 61850
- Protocols north
- IEC 60870-5-104
- Interlocking
- Bay and station level
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Station batteries (Ni-Cd, VRLA)Sabarmatideep6 variants
SampleStation batteries (Ni-Cd, VRLA) Sabarmatideep · SAB-DF3 series
- Capacity
- 100 Ah to 1000 Ah (see variants)
- Chemistry
- VRLA gel
- Nominal cell voltage
- 1.2 V
- Number of cells
- 108
- Bank voltage
- 110 V
Lead time 3-4 weeks · Warranty 24 months · MOQ 10 nos
Control & relay panelsLumentron6 variants
SampleControl & relay panels Lumentron · LUM-EB5 series
- System voltage
- 11 kV to 400 kV (see variants)
- Panel type
- Simplex
- Bay type
- Transformer
- Protection
- Differential + REF
- Panel size
- 800 x 800 x 2200 mm
Lead time 10-14 weeks · Warranty 30 months from supply · MOQ 10 nos
OHE masts, cantilevers & catenaryUrjaline4 variants
SampleOHE masts, cantilevers & catenary Urjaline · URJ-F52 series
- Mast type
- Portal 2-track to Booster mast (see variants)
- Section
- Tubular
- Height
- 9.5 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty As per contract · MOQ 10 nos