Third-party inspection (TPI)Kaveridhruv3 variants
SampleServiceThird-party inspection (TPI) Kaveridhruv · KAV-093 series
- Inspection effort
- 10 man-days to 50 man-days (see variants)
- Equipment inspected
- PV modules and inverters
- Inspection stage
- In-process
- Standards used
- Per client specification
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day
Product certification (BIS, IEC, ALMM)Urjatron6 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Urjatron · URJ-B85 series
- Certification scope
- Product family BIS to Full global set (see variants)
- Standards covered
- IS 14286 and IS 16077
- Application support
- End-to-end with lab liaison
- Test lab liaison
- Notified bodies
- Factory audit
- BIS inspection support
Lead time 8-24 weeks for certificate · Warranty As per contract · MOQ 1 application
Cabling, trenching & HDD worksSabarmati5 variants
SampleServiceCabling, trenching & HDD works Sabarmati · SAB-C87 series
- Cable route length
- 1 km to 20 km (see variants)
- Method
- Trench plus HDD for crossings
- HDD capacity
- Up to 450 mm bore
- Trench depth
- 1.5 m
- Cable type
- LT armoured
Lead time Permits may extend timeline · Warranty Workmanship 12 months · MOQ 1 km
Thermography & condition monitoringKrishna5 variants
SampleServiceThermography & condition monitoring Krishna · KRI-4E5 series
- Asset size
- 5 MW to 100 MW (see variants)
- Technique
- Vibration analysis
- Camera resolution
- 640x480 radiometric
- Deliverable
- Annotated hotspot report
- Drone services
- Ground sampling 3 cm per pixel
Lead time Mobilisation in 3-7 days · Warranty Report accuracy as per method · MOQ 1 site
Solar & wind BoP constructionRavikiran3 variants
SampleServiceSolar & wind BoP construction Ravikiran · RAV-9E9 series
- Project size
- 25 MW to 100 MW (see variants)
- Scope
- Complete BoP except modules
- DC cables
- 6 sq mm solar cable
- MV cables
- 33 kV XLPE Al armoured
- Inverter station
- Skid or containerised
Lead time 3-9 months execution · Warranty Defect liability 24 months · MOQ 1 MW
Simulators & e-learningDoaba6 variants
SampleServiceSimulators & e-learning Doaba · DOA-7E2 series
- Licensed users
- 10 users to 500 users (see variants)
- Product type
- Desktop simulator
- Content
- Safety scenarios
- Languages
- English
- Assessment
- Certificate on completion
Lead time Custom content 8-12 weeks · Warranty Bug fixes at no cost · MOQ 1 nos
Surveys (topo, geotech, drone)Hoysala5 variants
SampleServiceSurveys (topo, geotech, drone) Hoysala · HOY-629 series
- Survey area
- 50 acres to 1000 acres (see variants)
- Survey method
- DGPS and total station
- Accuracy
- Horizontal 20 mm, vertical 30 mm
- Deliverables
- Contour map, DEM, CAD plan
- Geotech boreholes
- As per project requirement
Lead time Report within 3 weeks of fieldwork · Warranty Report validity for design purpose · MOQ 1 site
Transmission line erection & stringingChola6 variants
SampleServiceTransmission line erection & stringing Chola · CHO-E14 series
- Voltage level
- 11 kV to 400 kV (see variants)
- Circuit type
- Single circuit
- Conductor
- AAAC or HTLS
- Scope
- Foundation, erection and stringing
- Stringing method
- Conventional stringing
Lead time Material availability dependent · Warranty Defect liability 24 months · MOQ 1 km
Surveys (topo, geotech, drone)Wayanad6 variants
SampleServiceSurveys (topo, geotech, drone) Wayanad · WAY-F38 series
- Survey area
- 10 acres to 500 acres (see variants)
- Survey method
- Drone LiDAR
- Accuracy
- Vertical 50 mm
- Deliverables
- Orthomosaic, DSM and contours
- Geotech boreholes
- 1 per 10 acres to 15 m depth
Lead time Report within 3 weeks of fieldwork · Warranty Re-survey of disputed areas at no cost · MOQ 1 site
EIA, ESG & environmental studiesDeccan3 variants
SampleServiceEIA, ESG & environmental studies Deccan · DEC-8B8 series
- Project scale
- Under 25 MW to 100 MW (see variants)
- Study
- ESIA to IFC standards
- Baseline season
- One season
- Deliverables
- Draft EIA, EMP, public hearing support
- Lab testing
- In-house lab
Lead time 8-12 weeks, longer with seasonal baseline · Warranty As per contract · MOQ 1 report
Product certification (BIS, IEC, ALMM)Malwavolt3 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Malwavolt · MAL-231 series
- Certification scope
- Product family BIS to ALMM List-II (cells) (see variants)
- Standards covered
- IEC 61215 and 61730
- Application support
- Documentation and filing
- Test lab liaison
- NABL accredited labs
- Factory audit
- Pre-audit gap analysis
Lead time 8-24 weeks for certificate · Warranty As per contract · MOQ 1 application
Power system studies (load flow, short circuit, grid code)Magadh5 variants
SampleServicePower system studies (load flow, short circuit, grid code) Magadh · MAG-4B9 series
- Network scale
- 33 kV plant to 400 kV system (see variants)
- Study type
- Load flow and short circuit
- Software
- DIgSILENT PowerFactory
- Model data
- Utility network model
- Deliverables
- Model files and relay settings
Lead time Kick-off in 1 week · Warranty Clarifications to utility at no cost · MOQ 1 report
Open-access approvalsNilgiritesla6 variants
SampleServiceOpen-access approvals Nilgiritesla · NIL-023 series
- Contract demand
- 1 MW to 100 MW (see variants)
- Access type
- Medium term
- Scope
- Application and follow-up
- Approvals
- SLDC
- Charges analysis
- Landed cost workings
Lead time Approval in 15-90 days · Warranty As per contract · MOQ 1 application
Civil & foundation worksHoysala3 variants
SampleServiceCivil & foundation works Hoysala · HOY-5E1 series
- Works volume
- 1 MW equivalent to 10 MW equivalent (see variants)
- Foundation type
- Raft or isolated footing
- Concrete grade
- M25
- Pull-out testing
- 2% piles tested
- Reinforcement
- Fe 500D TMT
Lead time 4-12 weeks execution · Warranty Pile load test certified · MOQ 1 job
Tariff & regulatory advisoryMaduraividyut5 variants
SampleServiceTariff & regulatory advisory Maduraividyut · MAD-3D1 series
- Matter complexity
- Simple petition to Appeal before APTEL (see variants)
- Forum
- State Electricity Regulatory Commission
- Deliverable
- Opinion note
- Representation
- Appearance before Commission
- Data support
- Cost data and tariff model
Lead time Petition 4-8 weeks · Warranty Free redrafting if Commission raises defects · MOQ 1 case
Statutory approvals (CEIG, pollution, forest)Ravinandi4 variants
SampleServiceStatutory approvals (CEIG, pollution, forest) Ravinandi · RAV-575 series
- Approval package
- 3 approvals to Wind park set (10) (see variants)
- Approvals covered
- Forest, wildlife and CRZ
- Documentation
- Self-certification and fee payment
- Liaison
- Site inspection coordination
- Statutory fee
- At actuals
Lead time Filing in 1-2 weeks · Warranty Rework of rejected applications at no fee · MOQ 1 application
Recruitment servicesTapti3 variants
SampleServiceRecruitment services Tapti · TAP-793 series
- Role seniority
- Engineer to Senior manager (see variants)
- Fee basis
- Fixed fee per hire
- Search
- Database and referrals
- Screening
- Assessment centre
- Verification
- Criminal and credit check
Lead time Shortlist in 7-15 days · Warranty Replacement within 3 months · MOQ 1 case
Live-line & hot-line washingKaverispark3 variants
SampleServiceLive-line & hot-line washing Kaverispark · KAV-AF1 series
- Voltage level
- 132 kV to 400 kV (see variants)
- Method
- Dry ice blasting
- Resistivity of water
- Above 5000 ohm-cm
- Scope
- Per bay
- Frequency
- Pre-monsoon
Lead time Permit based scheduling · Warranty As per contract · MOQ 1 job
Installation & erectionUrjatek6 variants
SampleServiceInstallation & erection Urjatek · URJ-DB7 series
- Installation scope
- 5 MW to 200 MW (see variants)
- Scope
- Complete mechanical and electrical erection
- Manpower deployed
- 25 technicians per MW-block
- Supervision
- Project manager, engineers, QA/QC
- Equipment
- Pile driver, crane, telehandler
Lead time Phased by block · Warranty Workmanship 12 months · MOQ 1 MW
Training & certification (electrical licence, work at height)Kamrup6 variants
SampleServiceTraining & certification (electrical licence, work at height) Kamrup · KAM-4F9 series
- Course duration
- 2 days to 3 months (see variants)
- Programme
- Solar installer
- Mode
- On-site
- Batch size
- 30 participants
- Certification
- Training completion certificate
Lead time Next batch in 2-4 weeks · Warranty Re-attempt of assessment at no cost · MOQ 1 nos
Grid connectivity & GNA applicationsPennarlumen4 variants
SampleServiceGrid connectivity & GNA applications Pennarlumen · PEN-F33 series
- Capacity applied
- 100 MW to 1000 MW (see variants)
- Application
- Connectivity
- Scope
- End-to-end liaison
- Bank guarantee
- Arranged by client
- Studies
- Grid impact summary
Lead time Filing in 1-2 weeks · Warranty As per contract · MOQ 1 application
Freight forwarding & customs clearanceMalwavolt5 variants
SampleServiceFreight forwarding & customs clearance Malwavolt · MAL-FC9 series
- Shipment size
- 5 CBM to Project cargo (see variants)
- Mode
- Air freight
- Customs services
- Bill of entry and clearance
- Incoterm
- FOB
- Permits
- BIS, WPC, import licences
Lead time Booking in 2-3 days · Warranty As per freight terms · MOQ 1 lot
Skilled technicians & electriciansShaktimark4 variants
SampleServiceSkilled technicians & electricians Shaktimark · SHA-9F9 series
- Team size
- 5 persons to 50 persons (see variants)
- Trade
- Electrician
- Qualification
- Diploma
- Experience
- 2-5 years
- Compliance
- Contract labour licence
Lead time Deployment in 7-14 days · Warranty Replacement at no cost for unsuitable workers · MOQ 1 man-month
Type & routine testing laboratories (NABL)Vidyutline6 variants
SampleServiceType & routine testing laboratories (NABL) Vidyutline · VID-921 series
- Test class
- Routine test to Type test (HV) (see variants)
- Equipment under test
- Power transformers
- Accreditation
- NABL ISO/IEC 17025
- Rating range
- Up to 400 kV
- Test standard
- Customer specific test plan
Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos