Substation & line O&MMahanadiparam3 variants
SampleServiceSubstation & line O&M Mahanadiparam · MAH-058 series
- Voltage level
- 11 kV to 66 kV (see variants)
- Scope
- Operation and maintenance
- Shift pattern
- 3 shifts, 24x7
- Manpower
- Engineer plus 6 operators
- Line patrolling
- Monthly foot patrol
Lead time Baseline condition audit first · Warranty As per contract · MOQ 1 month
Trench coversTaxila3 variants
Taxila · TAX-C49 series
- Cover size (L x W)
- 750 x 500 mm to 1000 x 750 mm (see variants)
- Material
- Mild steel chequered plate
- Thickness
- 50 mm
- Load class
- Light vehicle 5 t
- Weight
- 12 kg
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 5 nos
Ex control stations & panelsMahabaleshwar6 variants
SampleEx control stations & panels Mahabaleshwar · MAH-106 series
- Configuration
- 1 push button to Ex p panel 600x800 (see variants)
- Protection type
- Ex pxb
- Enclosure
- Aluminium LM6
- Rated voltage
- 240 V
- Rated current
- 16 A
Lead time 6-10 weeks · Warranty 24 months · MOQ 1 nos
GI & copper stripsMysoreojas3 variants
Mysoreojas · MYS-817 series
- Size
- 40x5 mm GI to 25x3 mm Cu (see variants)
- Material
- Mild steel galvanised
- Galvanising
- Hot-dip, min 70 µm
- Zinc coating
- IS 2629
- Current rating
- Fault current 1 s rated
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 m
Cooling towersNarmada4 variants
Narmada · NAR-DA2 series
- Flow rate
- 500 m3/h to 5000 m3/h (see variants)
- Tower type
- Crossflow
- Construction
- RCC
- Fill type
- Splash
- Range
- 8 C
Lead time 8-12 weeks · Warranty 24 months on FRP parts · MOQ 1 nos
Ammonia & methanol synthesis equipmentMarwar3 variants
SampleAmmonia & methanol synthesis equipment Marwar · MAR-945 series
- Production capacity
- 5 TPD to 50 TPD (see variants)
- Product
- Ammonia
- Synthesis pressure
- 200 bar
- Reactor temperature
- 220-260 deg C
- Catalyst
- Cu/ZnO/Al2O3
Lead time 30-40 weeks · Warranty As per contract · MOQ 5 lot
Torque wrenches & bolt tensioningMewar6 variants
SampleTorque wrenches & bolt tensioning Mewar · MEW-545 series
- Torque range
- 5-25 Nm to 1000-10000 Nm (see variants)
- Type
- Hydraulic
- Drive size
- 1/2 inch
- Accuracy
- +/-3%
- Length
- 600 mm
Lead time 3-5 weeks · Warranty Re-calibration after 5000 cycles · MOQ 1 set
Hardware fittings & dampersMahanadi4 variants
SampleHardware fittings & dampers Mahanadi · MAH-F12 series
- Conductor type
- Dog to Zebra (see variants)
- Component
- Earthwire clamp
- Material
- Galvanised steel
- Rated load
- 70 kN
- Slip strength
- 95% of RBL
Lead time 3-4 weeks · Warranty 24 months · MOQ 1 nos
Home & building automationMadurai4 variants
SampleHome & building automation Madurai · MAD-FC6 series
- Channels
- 2-channel to 16-channel (see variants)
- Protocol
- BACnet
- Supply voltage
- 24 V DC
- Load per channel
- 16 A
- Control
- Wall panel
Lead time 3-5 weeks · Warranty 24 months from supply · MOQ 1 nos
Warehousing & yard managementShivalik3 variants
SampleServiceWarehousing & yard management Shivalik · SHI-407 series
- Storage area
- 2500 sq m to 10000 sq m (see variants)
- Storage type
- Bonded
- Handling equipment
- Heavy cranes up to 100 tonnes
- Security
- 24x7 guards and CCTV
- Inventory system
- WMS with barcode
Lead time Setup in 2 weeks · Warranty Insurance cover · MOQ 1 month
Thermal energy storageVaigaidhruv3 variants
SampleThermal energy storage Vaigaidhruv · VAI-864 series
- Storage capacity
- 100 kWh-th to 1 MWh-th (see variants)
- Storage medium
- Chilled water
- Operating temperature
- 600-1000 deg C
- Charge source
- Waste heat
- Discharge output
- Hot water
Lead time 16-24 weeks · Warranty 5 years on tank · MOQ 1 kWh
CRGO & CRNO electrical steelDeccan3 variants
SampleCRGO & CRNO electrical steel Deccan · DEC-F22 series
- Grade / thickness
- HiB 0.27 mm to CRNO 0.50 mm (see variants)
- Core loss
- 1.0 W/kg at 1.7 T
- Form
- Master coil
- Coil width
- 300 mm
- Coil weight
- 5 MT
Lead time 2-4 weeks · Warranty Mill test certificate per coil · MOQ 1 kg
Company secretarial & complianceMewar6 variants
SampleServiceCompany secretarial & compliance Mewar · MEW-B95 series
- Entity count
- 1 entity to 50 entities (see variants)
- Services
- Board and AGM support
- Entity type
- Public limited
- Filings
- AOC-4, MGT-7
- Secretarial audit
- Included
Lead time Start in 3 days · Warranty Filing errors corrected at no cost · MOQ 1 month
Water-mist systemsAjanta4 variants
Ajanta · AJA-DB2 series
- Protected area
- 50-150 m² to 600-1200 m² (see variants)
- Pressure
- Low pressure 12 bar
- Pump unit
- Cylinder-driven
- Nozzle type
- Open
- Droplet size
- Dv99 < 1000 µm
Lead time 10-14 weeks · Warranty 24 months from supply · MOQ 1 set
Solar productive-use appliances (cold rooms, mills, dryers)Betwa3 variants
SampleSolar productive-use appliances (cold rooms, mills, dryers) Betwa · BET-C23 series
- Capacity
- 10 MT to 30 MT (see variants)
- Appliance type
- Flour mill
- Solar array
- 5 kWp
- Storage temperature
- 2-8 C
- Insulation
- Glass wool
Lead time 6-10 weeks · Warranty 24 months on compressor · MOQ 2 nos
Electrical safety auditsMalwavolt5 variants
SampleServiceElectrical safety audits Malwavolt · MAL-2D4 series
- Installed load
- 1 MVA to 50 MVA (see variants)
- Scope
- Audit with arc-flash study
- Auditor
- CEA-licensed engineer
- Measurements
- Earth resistance, insulation
- Report
- Action plan with timeline
Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
IoT & remote monitoringChambal4 variants
SampleIoT & remote monitoring Chambal · CHA-569 series
- Channels / points
- 32 inputs to 256 inputs (see variants)
- Connectivity
- 4G LTE Cat 1
- Protocols
- Modbus RTU/TCP
- Serial ports
- 2 x RS-485 + 1 RS-232
- Digital I/O
- 4 DI / 2 DO
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 10 nos
Training & certification (electrical licence, work at height)Kalinga3 variants
SampleServiceTraining & certification (electrical licence, work at height) Kalinga · KAL-274 series
- Course duration
- 5 days to 30 days (see variants)
- Programme
- Fire safety
- Mode
- On-site
- Batch size
- 12 participants
- Certification
- Skill council NSQF aligned
Lead time Next batch in 2-4 weeks · Warranty Re-training for missed sessions · MOQ 1 nos
Training & certification (electrical licence, work at height)Magadhflux3 variants
SampleServiceTraining & certification (electrical licence, work at height) Magadhflux · MAG-E26 series
- Course duration
- 5 days to 30 days (see variants)
- Programme
- Substation operator
- Mode
- Hybrid
- Batch size
- 12 participants
- Certification
- Skill council NSQF aligned
Lead time On-site within 2 weeks · Warranty Re-attempt of assessment at no cost · MOQ 1 nos
Air compressors & dryersSabarmati5 variants
SampleAir compressors & dryers Sabarmati · SAB-DC8 series
- Motor rating
- 7.5 kW to 55 kW (see variants)
- Working pressure
- 10 bar
- Free air delivery
- 6 cu m/min
- Type
- Reciprocating
- Drive
- VFD
Lead time 4-6 weeks · Warranty 24 months airend · MOQ 2 nos
Static VAR compensators (SVC)Kavachline6 variants
SampleStatic VAR compensators (SVC) Kavachline · KAV-717 series
- Rating
- 2 MVAr to 80 MVAr (see variants)
- System voltage
- 11 kV
- Configuration
- TCR + FC
- Thyristor valve
- Air-cooled
- Response time
- < 20 ms
Lead time 30-40 weeks · Warranty 36 months from commissioning · MOQ 5 nos
Gearboxes & couplingsPennar4 variants
SampleGearboxes & couplings Pennar · PEN-335 series
- Power rating
- 1 kW to 55 kW (see variants)
- Type
- Flexible coupling
- Reduction ratio
- 200:1
- Service factor
- 1.5
- Housing
- Fabricated steel
Lead time 1-3 weeks · Warranty 18 months · MOQ 5 nos
Site acceptance & pre-commissioning testsKaveridhruv5 variants
SampleServiceSite acceptance & pre-commissioning tests Kaveridhruv · KAV-C65 series
- Plant size
- 1 MW to 50 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Relay test set, IV tracer, CRM
- Test sequence
- Per client approved format
- Team
- Test engineer plus 2 technicians
Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site
Site acceptance & pre-commissioning testsRajatcore6 variants
SampleServiceSite acceptance & pre-commissioning tests Rajatcore · RAJ-C95 series
- Plant size
- 1 MW to 100 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Test engineer plus 2 technicians
Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site