Impressed-current & sacrificial-anode CPPushpaktron3 variants
SampleImpressed-current & sacrificial-anode CP Pushpaktron · PUS-614 series
- TR unit rating
- 50 V 50 A to 100 V 100 A (see variants)
- System type
- Galvanic
- Anode material
- HSCI
- Cooling
- Oil cooled
- Output
- Constant current
Lead time 3-4 weeks · Warranty 12 months from commissioning · MOQ 1 set
BESS thermal management & HVACMaduraishakti3 variants
SampleBESS thermal management & HVAC Maduraishakti · MAD-B83 series
- Cooling capacity
- 3 kW to 10 kW (see variants)
- Type
- Liquid chiller
- Refrigerant
- R134a
- Coolant
- Deionised water glycol
- Supply voltage
- 230 V 1-ph
Lead time 3-5 weeks · Warranty 12 months · MOQ 5 nos
Power semiconductors (IGBT, SiC, thyristors)Sparkgen6 variants
SamplePower semiconductors (IGBT, SiC, thyristors) Sparkgen · SPA-031 series
- Rating
- 1200 V / 75 A to 4500 V / 1200 A (see variants)
- Device type
- Trench IGBT
- Topology
- Half-bridge
- Package
- 62 mm
- Isolation voltage
- 2.5 kV
Lead time 4-8 weeks · Warranty 24 months from supply · MOQ 1 nos
Bank guarantees & surety bondsTejline3 variants
SampleServiceBank guarantees & surety bonds Tejline · TEJ-492 series
- Guarantee amount
- INR 10 lakh to INR 1 crore (see variants)
- Instrument
- Bank guarantee
- Purpose
- Bid security
- Validity
- 36 months
- Margin
- Nil with surety
Lead time Issuance in 3-10 days · Warranty As per guarantee terms · MOQ 1 job
Boiler & turbine sparesTaxiladhruv6 variants
SampleBoiler & turbine spares Taxiladhruv · TAX-FF7 series
- Unit size
- 30 MW to 660 MW (see variants)
- Component
- Superheater
- Tube material
- SA 213 T91
- Blade material
- 12Cr
- OEM compatibility
- Compatible
Lead time 4-8 weeks · Warranty 18 months · MOQ 1 set
Plant decommissioning & dismantlingGodavari4 variants
SampleServicePlant decommissioning & dismantling Godavari · GOD-B77 series
- Plant capacity
- 5 MW to 50 MW (see variants)
- Scope
- Dismantling with recycling
- Technology
- Substation
- Cranes
- Mobile cranes
- Material disposal
- Recycler tie-up
Lead time Planning in 2-3 weeks · Warranty Site restoration certificate · MOQ 1 MW
High-mast & flood lightsSabarmativayu4 variants
SampleHigh-mast & flood lights Sabarmativayu · SAB-968 series
- Wattage
- 100 W to 300 W (see variants)
- Luminous efficacy
- 130 lm/W
- Beam angle
- 60 deg
- Colour temperature
- 5700 K
- CRI
- Above 70
Lead time 2-3 weeks · Warranty 36 months from supply · MOQ 2 nos
SMPS & power suppliesMunnar5 variants
SampleSMPS & power supplies Munnar · MUN-685 series
- Output rating
- 24 V / 5 A to 48 V / 20 A (see variants)
- Input voltage
- Universal 90-300 VAC
- Output voltage
- 48 VDC
- Efficiency
- > 92%
- Power factor
- > 0.95 (active PFC)
Lead time 1-2 weeks · Warranty 36 months from supply · MOQ 1 nos
Hydrogen sensors & safety systemsMarwar4 variants
SampleHydrogen sensors & safety systems Marwar · MAR-E42 series
- Detection range
- 0-1000 ppm to 0-100% vol (see variants)
- Sensor type
- Thermal conductivity
- Output
- Relay
- Response time T90
- < 10 s
- Accuracy
- +/- 5% of FS
Lead time 6-8 weeks · Warranty 12 months · MOQ 10 nos
Asset & O&M managementSatavahana5 variants
SampleAsset & O&M management Satavahana · SAT-835 series
- Capacity covered
- Up to 25 MWp to Portfolio unlimited (see variants)
- Deployment
- On-premise
- Users
- 50
- Work orders
- Preventive, corrective, predictive
- Mobile app
- Android and iOS offline
Lead time 1-2 weeks · Warranty Support included for subscription term · MOQ 10 licence
Cooling towersCoorgshakti5 variants
Coorgshakti · COO-DA3 series
- Flow rate
- 500 m3/h to 10000 m3/h (see variants)
- Tower type
- Counterflow ID
- Construction
- FRP
- Fill type
- PVC film
- Range
- 8 C
Lead time 8-12 weeks · Warranty 12 months · MOQ 10 nos
Isolators & earth switchesMalabarojas3 variants
SampleIsolators & earth switches Malabarojas · MAL-1C9 series
- System voltage
- 12 kV to 72.5 kV (see variants)
- Rated current
- 4000 A
- Type
- Double break
- Earth switch
- Without
- Short-time current
- 50 kA
Lead time 6-8 weeks · Warranty 30 months from supply · MOQ 5 nos
Gas-based suppressionBeas5 variants
SampleGas-based suppression Beas · BEA-342 series
- Protected volume
- Up to 50 m³ to 1000-3000 m³ (see variants)
- Agent
- HFC-227ea
- Cylinder pressure
- 42 bar
- Discharge time
- 10 seconds
- Detection
- Cross-zoned smoke detectors
Lead time 8-12 weeks · Warranty 24 months from supply · MOQ 1 set
Compact secondary substationsNarmadapushpak4 variants
SampleCompact secondary substations Narmadapushpak · NAR-571 series
- Transformer rating
- 250 kVA to 1000 kVA (see variants)
- Primary voltage
- 11 kV
- Secondary voltage
- 0.69 kV
- HV equipment
- VCB panel
- Transformer type
- Oil-immersed
Lead time 6-8 weeks · Warranty 18 months · MOQ 1 nos
Ex control stations & panelsSahyadrivayu6 variants
SampleEx control stations & panels Sahyadrivayu · SAH-A62 series
- Configuration
- 1 push button to Ex p panel 600x800 (see variants)
- Protection type
- Ex db IIC T6
- Enclosure
- SS 316
- Rated voltage
- 24 VDC
- Rated current
- 16 A
Lead time 3-4 weeks · Warranty 24 months · MOQ 2 nos
Transformer sparesVijaya3 variants
Vijaya · VIJ-675 series
- Voltage class
- 33 kV to 132 kV (see variants)
- Component
- PRD
- Rated current
- 630 A
- Material
- Polymer composite
- Creepage
- 31 mm/kV
Lead time 1-2 weeks · Warranty 18 months from commissioning · MOQ 1 nos
Insulated hand tools (1000 V)Kaveri3 variants
SampleInsulated hand tools (1000 V) Kaveri · KAV-BA8 series
- Kit size
- 5 pieces to 12 pieces (see variants)
- Rated voltage
- 1500 V DC
- Material
- Chrome molybdenum
- Insulation
- Dipped
- Handle colour
- Red and yellow
Lead time 3-4 weeks · Warranty Lifetime against material defects · MOQ 10 set
BMS & energy management (EMS)Dwaraka6 variants
SampleBMS & energy management (EMS) Dwaraka · DWA-011 series
- System scale
- Up to 100 kWh to Up to 200 MWh (see variants)
- Cell count supported
- Up to 384 series
- Voltage sensing accuracy
- +/- 2 mV
- Temperature sensing
- NTC, +/- 1 deg C
- SOC accuracy
- +/- 5%
Lead time 6-8 weeks · Warranty 24 months from supply · MOQ 2 set
LT power cablesKaveriojas3 variants
Kaveriojas · KAV-8B7 series
- Size
- 3.5C x 50 sq mm to 3.5C x 150 sq mm (see variants)
- Voltage grade
- 1.1 kV
- Conductor
- Aluminium
- Insulation
- XLPE
- Armour
- Unarmoured
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 2 m
Substation constructionKakatiyasetu4 variants
SampleServiceSubstation construction Kakatiyasetu · KAK-DC6 series
- Voltage class
- 66 kV to 400 kV (see variants)
- Type
- Outdoor AIS
- Scope
- Full turnkey
- Transformers
- Up to 50 MVA
- Earthing
- Copper-bonded rods
Lead time Engineering in 4-6 weeks · Warranty Defect liability 24 months · MOQ 1 bay
ERP, project & document managementSatavahana3 variants
SampleERP, project & document management Satavahana · SAT-9B9 series
- Users
- 50 users to 250 users (see variants)
- Deployment
- Cloud SaaS
- Modules
- Finance, procurement, projects, HR
- Scheduling
- Primavera-style CPM, Gantt
- Document control
- Revision, transmittal, approval workflow
Lead time 4-6 weeks · Warranty Support with AMC · MOQ 1 licence
Sensors & transducersTrishultron5 variants
SampleSensors & transducers Trishultron · TRI-0C6 series
- Sensor type
- Proximity 8 mm to Accelerometer 100 mV/g (see variants)
- Output
- PNP NO
- Accuracy
- ±1%
- Supply voltage
- 10-30 VDC
- Response time
- < 100 ms
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 nos
Cabling, trenching & HDD worksEllorakavach5 variants
SampleServiceCabling, trenching & HDD works Ellorakavach · ELL-C87 series
- Cable route length
- 2 km to 50 km (see variants)
- Method
- Open trench
- HDD capacity
- Up to 250 mm bore
- Trench depth
- 1.5 m
- Cable type
- 11/33 kV XLPE
Lead time Mobilisation in 7 days · Warranty Restoration warranty 6 months · MOQ 1 km
UPS systemsTaxila5 variants
Taxila · TAX-F92 series
- Rating
- 10 kVA to 100 kVA (see variants)
- Topology
- Online double conversion
- Input / output
- 3-ph / 3-ph
- Input voltage window
- 304-478 V
- Output power factor
- 0.8
Lead time 2-3 weeks · Warranty 12 months · MOQ 5 nos