Fire-survival & LSZH cablesMysore6 variants
SampleFire-survival & LSZH cables Mysore · MYS-771 series
- Size
- 2C x 1.5 sq mm to 4C x 70 sq mm (see variants)
- Fire resistance
- Circuit integrity 180 min
- Insulation
- XLPO
- Sheath
- FRLS PVC
- Conductor
- Aluminium
Lead time 4-5 weeks · Warranty 12 months from supply · MOQ 1 m
Feed-water pumps & heatersNarmada5 variants
SampleFeed-water pumps & heaters Narmada · NAR-633 series
- Flow capacity
- 20 m3/h to 500 m3/h (see variants)
- Equipment
- CEP
- Discharge pressure
- 60 bar
- Stages
- 12
- Casing
- Segmental ring-section
Lead time 10-14 weeks · Warranty 18 months · MOQ 1 nos
Ex junction boxes & cable glandsVindhyasamarth4 variants
SampleEx junction boxes & cable glands Vindhyasamarth · VIN-112 series
- Size
- Gland M40 to JB 600x400 mm (see variants)
- Protection type
- Ex db IIC
- Enclosure material
- Aluminium
- Gland material
- Nickel-plated brass
- Cable type
- Armoured
Lead time 2-3 weeks · Warranty 12 months · MOQ 5 nos
Boilers & HRSGMunnarloha6 variants
Munnarloha · MUN-471 series
- Steam capacity
- 35 TPH to 1100 TPH (see variants)
- Boiler type
- PC
- Steam pressure
- 110 bar
- Steam temperature
- 485 C
- Fuel
- Coal
Lead time 10-14 months · Warranty 12 months · MOQ 1 nos
Panel wiring & assemblyMalwa5 variants
SampleServicePanel wiring & assembly Malwa · MAL-2B5 series
- Panel complexity
- Up to 50 wires to Up to 2000 wires (see variants)
- Panel type
- MCC
- Wiring standard
- IEC 61439
- Wire type
- FRLS 2.5 sq mm
- Ferrules
- Hand marked
Lead time 3-5 weeks · Warranty Rework of wiring defects · MOQ 1 nos
Power system studies (load flow, short circuit, grid code)Hoysala3 variants
SampleServicePower system studies (load flow, short circuit, grid code) Hoysala · HOY-4B2 series
- Network scale
- 132 kV system to 400 kV system (see variants)
- Study type
- Harmonics
- Software
- PSS/E
- Model data
- Utility network model
- Deliverables
- Model files and relay settings
Lead time Kick-off in 1 week · Warranty Revision for utility comments · MOQ 1 report
Gas turbinesMahabaleshwarprakash4 variants
Mahabaleshwarprakash · MAH-005 series
- ISO rating
- 1 MW to 30 MW (see variants)
- Type
- Industrial
- Fuel
- Dual fuel gas / HSD
- Efficiency
- 41%
- Exhaust temperature
- 540 C
Lead time 12-18 months · Warranty 24 months · MOQ 2 nos
Arbitration & dispute resolutionVidarbha3 variants
SampleServiceArbitration & dispute resolution Vidarbha · VID-8E8 series
- Claim value
- INR 1 crore to INR 25 crore (see variants)
- Forum
- Institutional arbitration
- Services
- Representation
- Experts
- Technical expert
- Team
- Senior counsel and team
Lead time Proceedings 12-24 months · Warranty Fee schedule agreed at start · MOQ 1 case
Wind turbine O&MDoaba4 variants
SampleServiceWind turbine O&M Doaba · DOA-1B4 series
- Fleet size
- 20 turbines to 150 turbines (see variants)
- Scope
- Scheduled maintenance only
- Turbine class
- 3 MW and above
- Availability guarantee
- 95% machine availability
- Technician team
- Site manager plus 2 technicians per 5 turbines
Lead time Mobilisation of crew 2 weeks · Warranty Work warranty 6 months · MOQ 1 nos
Ex control stations & panelsMahabaleshwar5 variants
SampleEx control stations & panels Mahabaleshwar · MAH-C91 series
- Configuration
- 2 push buttons (start/stop) to Ex p panel 600x800 (see variants)
- Protection type
- Ex db IIC T6
- Enclosure
- SS 316
- Rated voltage
- 240 V
- Rated current
- 16 A
Lead time 3-4 weeks · Warranty 24 months · MOQ 10 nos
Section insulators & neutral sectionsUrjaline3 variants
SampleSection insulators & neutral sections Urjaline · URJ-FF1 series
- Type
- Insulated overlap to Auto-passing neutral (see variants)
- Voltage
- 25 kV AC
- Material
- Polymer
- Length
- 15 m
- Rated current
- 600 A
Lead time 4-6 weeks · Warranty 12 months · MOQ 5 nos
Fencing & gatesKrishna5 variants
Krishna · KRI-FA1 series
- Fence height
- 1.5 m to 3.0 m (see variants)
- Mesh type
- Welded 75x25 mm
- Wire diameter
- 4.5 mm
- Post
- Angle 50x50x6
- Post spacing
- 2.5 m
Lead time 1-2 weeks · Warranty 5 years against rusting · MOQ 1 m
Relay test kitsMahanadi5 variants
Mahanadi · MAH-B53 series
- Output channels
- 3 voltage + 3 current to 6V + 12I (see variants)
- Current output
- 64 A parallel
- Voltage output
- 0-300 V
- Frequency range
- 10-1000 Hz
- Accuracy
- 0.1%
Lead time 2-4 weeks · Warranty 12 months from supply · MOQ 1 set
Transmission line erection & stringingDoaba3 variants
SampleServiceTransmission line erection & stringing Doaba · DOA-B79 series
- Voltage level
- 66 kV to 220 kV (see variants)
- Circuit type
- Double circuit
- Conductor
- AAAC or HTLS
- Scope
- Foundation, erection and stringing
- Stringing method
- Conventional stringing
Lead time Mobilisation in 15 days · Warranty Workmanship 12 months · MOQ 1 km
Tunnel, port & stadium lightingOhmgen6 variants
SampleTunnel, port & stadium lighting Ohmgen · OHM-533 series
- Wattage
- 150 W to 800 W (see variants)
- Luminous efficacy
- 150 lm/W
- Beam optics
- Narrow 15 deg
- Colour temperature
- 5700 K
- CRI
- Above 70
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 1 nos
SCR / SNCR NOx controlSaurashtra5 variants
SampleSCR / SNCR NOx control Saurashtra · SAU-734 series
- Flue gas flow
- 50000 Nm3/h to 1000000 Nm3/h (see variants)
- Technology
- Hybrid
- NOx removal efficiency
- 40%
- Reagent
- Ammonia 25%
- Catalyst
- Honeycomb V2O5-WO3/TiO2
Lead time 16-24 weeks · Warranty 24000 operating hours on catalyst · MOQ 5 set
Transformer plinths, oil pits & soak pitsNarmadashakti6 variants
SampleServiceTransformer plinths, oil pits & soak pits Narmadashakti · NAR-A65 series
- Transformer rating served
- 1 MVA to 100 MVA (see variants)
- Concrete grade
- M30
- Oil pit capacity
- 110% of oil volume
- Pit fill
- Gravel 400 mm
- Pit waterproofing
- Integral waterproofing
Lead time 4-6 weeks · Warranty 12 months defect liability · MOQ 1 nos
Detuned & series reactorsShivaliklumen4 variants
SampleDetuned & series reactors Shivaliklumen · SHI-7D3 series
- Rating
- 25 kVAr to 200 kVAr (see variants)
- Detuning factor
- 7% (189 Hz)
- Rated voltage
- 525 V
- Core
- Air core
- Winding
- Copper
Lead time 2-3 weeks · Warranty 18 months from supply · MOQ 1 nos
Copper rods, strips & busbarsJhelumakshay4 variants
SampleCopper rods, strips & busbars Jhelumakshay · JHE-F71 series
- Rod / busbar size
- 8 mm rod to 50 x 6 mm (see variants)
- Grade
- OFE copper
- Conductivity
- Min 100% IACS
- Temper
- Annealed
- Form
- Rod coil
Lead time 1-2 weeks · Warranty Test certificate per lot · MOQ 5 kg
RO & DM plantsKrishnashikhar3 variants
Krishnashikhar · KRI-F52 series
- Permeate capacity
- 10 cu m/h to 50 cu m/h (see variants)
- Recovery
- 85%
- Membrane
- 4 inch TFC
- Feed TDS
- Up to 5000 ppm
- Permeate conductivity
- Below 0.2 microS/cm DM
Lead time 8-10 weeks · Warranty 6 months on membranes · MOQ 10 set
Paints & anti-corrosion coatingsWayanad5 variants
SamplePaints & anti-corrosion coatings Wayanad · WAY-4D5 series
- Pack size
- 1 litre to 50 litre (see variants)
- Paint type
- Zinc phosphate
- Packs
- Two pack
- Dry film thickness
- 100 micron
- Colour
- Signal red
Lead time 3-7 days · Warranty 12 months shelf life · MOQ 5 litre
AVRs & excitation systemsMahabaleshwar4 variants
SampleAVRs & excitation systems Mahabaleshwar · MAH-167 series
- Alternator rating
- 1 MVA to 30 MVA (see variants)
- Type
- Digital AVR
- Field current
- 1000 A
- Field voltage
- 63 V
- Voltage regulation
- +/-1%
Lead time 1-2 weeks · Warranty 12 months · MOQ 2 nos
MV metal-clad switchboards (11–33 kV)Vidarbhasudarshan5 variants
SampleMV metal-clad switchboards (11–33 kV) Vidarbhasudarshan · VID-5C6 series
- Rating
- 11 kV 1250 A to 33 kV 2000 A (see variants)
- Insulation
- Solid insulated
- Short-circuit rating
- 25 kA/3 s
- Panel function
- Bus coupler
- Busbar
- Single busbar
Lead time 8-10 weeks · Warranty 18 months from commissioning · MOQ 10 nos
Fire-rated coatings & penetration sealsKonarkakshay4 variants
SampleFire-rated coatings & penetration seals Konarkakshay · KON-566 series
- Fire rating
- 30 min to 120 min (see variants)
- Product type
- Fire-stop acrylic sealant
- Application
- Brush or airless spray
- Thickness
- 2 mm DFT
- Smoke and toxicity
- Low smoke, halogen-free