SCADA / EMS / DMS platformsPataliputraojas3 variants
SampleSCADA / EMS / DMS platforms Pataliputraojas · PAT-F54 series
- Points / tags
- 50,000 tags to Unlimited (see variants)
- Architecture
- Client-server
- Protocols
- IEC 61850
- Database
- Historian
- Redundancy
- Hot standby
Lead time 12-20 weeks · Warranty 12 months support · MOQ 10 licence
Substation automation (IEC 61850)Malabarsurya3 variants
SampleSubstation automation (IEC 61850) Malabarsurya · MAL-357 series
- Bays
- Up to 8 bays to Up to 32 bays (see variants)
- Architecture
- Station bus
- Protocol
- IEC 60870-5-104
- Network topology
- PRP
- HMI
- Single HMI
Lead time 16-24 weeks · Warranty 36 months · MOQ 1 lot
Energy auditsAnantsys6 variants
SampleServiceEnergy audits Anantsys · ANA-D71 series
- Connected load
- 500 kW to 50 MW (see variants)
- Audit level
- Investment-grade audit
- Instruments
- Ultrasonic flow meter, lux meter
- Auditor
- Certified Energy Manager
- Report
- Savings opportunities with payback
Lead time Audit in 1-2 weeks · Warranty Savings estimate accuracy within agreed band · MOQ 1 site
Ethanol & biofuel plant equipmentUjjayiniohm5 variants
SampleEthanol & biofuel plant equipment Ujjayiniohm · UJJ-F48 series
- Plant capacity
- 60 KLPD to 300 KLPD (see variants)
- Feedstock
- Cellulosic
- Distillation
- Multi-pressure
- Dehydration
- Molecular sieve
- Product purity
- 99.5% v/v
Lead time 10-14 months · Warranty 12 months · MOQ 1 lot
Audit & accountingTungabhadra3 variants
SampleServiceAudit & accounting Tungabhadra · TUN-A54 series
- Annual turnover
- INR 10 crore to INR 50 crore (see variants)
- Service
- Statutory audit
- Accounting standard
- AS
- Audit team
- Partner, manager, 4 staff
- Reports
- Management letter
Lead time Engagement in 1 week · Warranty Professional indemnity · MOQ 1 month
Micro & pico hydro setsMarwar3 variants
SampleMicro & pico hydro sets Marwar · MAR-051 series
- Rated output
- 5 kW to 25 kW (see variants)
- Turbine type
- Turgo
- Net head
- 10-50 m
- Flow
- 10-500 l/s
- Generator
- Synchronous brushless
Lead time 3-5 weeks · Warranty 12 months · MOQ 2 kW
Hybrid & off-grid inverters, charge controllersAwadhsudarshan6 variants
SampleHybrid & off-grid inverters, charge controllers Awadhsudarshan · AWA-F79 series
- Rated power
- 3 kVA to 30 kVA (see variants)
- Battery voltage
- 24 V
- Battery type
- Lead-acid
- Max PV input
- 3000 W
- Controller type
- PWM
Lead time 1-2 weeks · Warranty 5 years on hybrid units · MOQ 5 nos
Disturbance recorders & PMUsShivalik4 variants
SampleDisturbance recorders & PMUs Shivalik · SHI-C87 series
- Channels
- 16 analog to 96 analog (see variants)
- Sampling rate
- 1 kHz
- Time sync
- GPS
- Accuracy
- 0.1% FS
- Reporting rate
- 50 fps
Lead time 10-14 weeks · Warranty 24 months · MOQ 5 nos
Substation automation (IEC 61850)Chambalparam4 variants
SampleSubstation automation (IEC 61850) Chambalparam · CHA-082 series
- Bays
- Up to 16 bays to Up to 128 bays (see variants)
- Architecture
- Station bus
- Protocol
- IEC 61850 Ed 2
- Network topology
- HSR ring
- HMI
- Single HMI
Lead time 10-14 weeks · Warranty 36 months · MOQ 1 lot
VRLA & tubular batteriesMaduraishakti6 variants
SampleVRLA & tubular batteries Maduraishakti · MAD-286 series
- Capacity
- 65 Ah to 1000 Ah (see variants)
- Nominal voltage
- 12 V
- Technology
- AGM VRLA
- Discharge rate
- C10
- Design life
- 5 years
Lead time 1-2 weeks · Warranty 12 months · MOQ 1 nos
Induction & arc furnacesNilgiriurja6 variants
SampleInduction & arc furnaces Nilgiriurja · NIL-F11 series
- Furnace capacity
- 500 kg to 25 MT (see variants)
- Type
- Electric arc
- Power supply
- 4 MW
- Frequency
- 250 Hz
- Charge material
- DRI/HBI
Lead time 20-30 weeks · Warranty 12 months · MOQ 5 nos
Power system studies (load flow, short circuit, grid code)Malwatarang5 variants
SampleServicePower system studies (load flow, short circuit, grid code) Malwatarang · MAL-4C9 series
- Network scale
- 11 kV plant to 220 kV system (see variants)
- Study type
- Dynamic and transient
- Software
- PSS/E
- Model data
- Client single line diagram and data
- Deliverables
- Model files and relay settings
Lead time Kick-off in 1 week · Warranty Clarifications to utility at no cost · MOQ 1 report
Switchgear & breaker sparesMewar3 variants
SampleSwitchgear & breaker spares Mewar · MEW-F05 series
- Rated voltage
- 12 kV to 24 kV (see variants)
- Component
- Contact
- Rated current
- 1250 A
- Short circuit rating
- 25 kA
- Mechanical life
- 10000 operations
Lead time 4-8 weeks · Warranty 12 months from supply · MOQ 10 nos
Dry-type transformersHampiohm3 variants
SampleDry-type transformers Hampiohm · HAM-ED3 series
- Rating
- 250 kVA to 1000 kVA (see variants)
- Voltage ratio
- 11/0.433 kV
- Technology
- VPI
- Insulation class
- Class F
- Cooling
- AN/AF
Lead time 4-6 weeks · Warranty 36 months · MOQ 1 nos
Freight forwarding & customs clearancePennarlumen3 variants
SampleServiceFreight forwarding & customs clearance Pennarlumen · PEN-0E4 series
- Shipment size
- 1 CBM to 20 ft container (see variants)
- Mode
- Sea LCL
- Customs services
- Bill of entry and clearance
- Incoterm
- FOB
- Permits
- BIS, WPC, import licences
Lead time Delivery 1-6 weeks · Warranty As per freight terms · MOQ 1 lot
Bushings, OLTC & transformer accessoriesBundel6 variants
SampleBushings, OLTC & transformer accessories Bundel · BUN-281 series
- Voltage class
- 11 kV to 400 kV (see variants)
- Component
- OTI/WTI
- Current rating
- 1250 A
- Insulation type
- RIS
- Creepage
- 31 mm/kV
Lead time 12-20 weeks · Warranty 24 months · MOQ 10 nos
Cable cleatsNarmadaprithvi5 variants
Narmadaprithvi · NAR-A13 series
- Cable diameter
- 15-20 mm to 60-80 mm (see variants)
- Arrangement
- Single
- Material
- Nylon 66
- Short-circuit rating
- Up to 100 kA peak
- Fixing
- M10
Lead time 3-4 weeks · Warranty As per manufacturer · MOQ 5 nos
Earth & soil resistivity testersDeccanarc5 variants
SampleEarth & soil resistivity testers Deccanarc · DEC-8C3 series
- Measuring range
- 0-20 ohm to 0-30 kohm (see variants)
- Method
- 3-pole fall of potential
- Test frequency
- Auto-select 94-128 Hz
- Test current
- Up to 20 mA
- Accuracy
- +/-2%
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 nos
Silica gel, gaskets & sealsSatpura6 variants
SampleSilica gel, gaskets & seals Satpura · SAT-102 series
- Pack size
- 500 g to 50 kg (see variants)
- Product type
- Silica gel orange
- Bead size
- 2-5 mm
- Moisture adsorption
- Min 25% at 25 deg C 80% RH
- Colour change
- Orange to green
Lead time 1-2 weeks · Warranty 24 months shelf life in sealed pack · MOQ 1 kg
Ex motorsDoabaneel5 variants
Doabaneel · DOA-217 series
- Rating
- 1.1 kW to 37 kW (see variants)
- Protection type
- Ex nA
- Gas group
- IIB
- Temperature class
- T3
- Poles
- 4
Lead time 4-6 weeks · Warranty 18 months from supply · MOQ 10 nos
AlternatorsNalandakelvin3 variants
Nalandakelvin · NAL-802 series
- Rating
- 500 kVA to 2000 kVA (see variants)
- Voltage
- 415 V
- Excitation
- Self-excited brushless
- Poles
- 4
- Insulation class
- F
Lead time 8-12 weeks · Warranty 12 months · MOQ 1 nos
SF6 gas & handlingDhruvtek6 variants
Dhruvtek · DHR-D41 series
- Cylinder size
- 1 kg to 50 kg (see variants)
- Purity
- 99.99%
- Moisture
- Below 15 ppmv
- Cylinder
- Seamless steel
- Valve
- DIN 477
Lead time 3-4 weeks · Warranty Test certificate per cylinder · MOQ 5 kg
Fire-survival & LSZH cablesKutch3 variants
SampleFire-survival & LSZH cables Kutch · KUT-779 series
- Size
- 4C x 6 sq mm to 4C x 35 sq mm (see variants)
- Fire resistance
- Circuit integrity 180 min
- Insulation
- XLPE
- Sheath
- LSZH
- Conductor
- Copper
Lead time 4-5 weeks · Warranty 12 months from supply · MOQ 5 m
Safety officers & supervisorsDoaba5 variants
SampleServiceSafety officers & supervisors Doaba · DOA-AD5 series
- Safety team
- 1 officer to 15 officers (see variants)
- Qualification
- B.E. plus PDIS
- Experience
- 3-5 years
- Certifications
- NEBOSH IGC
- Role
- Site safety officer
Lead time Mass 3 weeks · Warranty As per contract · MOQ 1 man-month