Safety officers & supervisorsShaktimark3 variants
SampleServiceSafety officers & supervisors Shaktimark · SHA-D79 series
- Safety team
- 1 officer to 4 officers (see variants)
- Qualification
- Diploma in Industrial Safety
- Experience
- 5-10 years
- Certifications
- NEBOSH IGC
- Role
- HSE manager
Lead time Mass 3 weeks · Warranty Replacement for non-performing officer · MOQ 1 man-month
Refurbished & used equipmentMarwar4 variants
SampleUsedRefurbished & used equipment Marwar · MAR-BF7 series
Fair · made 2016
- Equipment rating
- 500 kVA to 10 MVA (see variants)
- Condition
- Refurbished
- Age
- 5-10 years
- Test report
- Insulation and ratio test
- Voltage class
- 33 kV
Lead time 1-2 weeks · Warranty 12 months for overhauled units · MOQ 1 nos
DG & equipment rentalBrahmaputraagni4 variants
SampleFor rentDG & equipment rental Brahmaputraagni · BRA-2C3 series
- DG capacity
- 30 kVA to 250 kVA (see variants)
- Phase
- 3 phase 415 V
- Fuel
- Included
- Enclosure
- Silent canopy
- Operator
- Included
Lead time Same day to 1 day · Warranty Replacement within 48 h · MOQ 1 nos
Aerial work platforms & boom liftsFluxmax6 variants
SampleFor rentAerial work platforms & boom lifts Fluxmax · FLU-901 series
- Working height
- 8 m scissor to 32 m insulated bucket (see variants)
- Platform capacity
- 450 kg
- Drive
- Diesel
- Outreach
- 16 m
- Insulation
- Not insulated
Lead time 3-5 days · Warranty Breakdown replacement within 24 h · MOQ 1 nos
Site acceptance & pre-commissioning testsShaktimark5 variants
SampleServiceSite acceptance & pre-commissioning tests Shaktimark · SHA-1A5 series
- Plant size
- 10 MW to 250 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Insulation tester, earth tester
- Test sequence
- Visual, mechanical, electrical
- Team
- Team of 6 with lead
Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Roads, drains & culvertsHertzgen3 variants
SampleServiceRoads, drains & culverts Hertzgen · HER-E76 series
- Road width
- 3.5 m to 5.5 m (see variants)
- Pavement type
- Interlocking paver
- Sub-base
- GSB 150 mm
- Base course
- WMM 250 mm
- Drain type
- Brick masonry drain
Lead time 2-3 weeks · Warranty 24 months defect liability · MOQ 1 m
Fabrication & galvanisingKaverigaruda5 variants
SampleServiceFabrication & galvanising Kaverigaruda · KAV-6C8 series
- Job complexity
- Cutting only to Heavy fabrication (see variants)
- Material supplied by
- Fabricator
- Process
- Plasma cutting
- Thickness range
- Up to 25 mm
- Tolerance
- +/-1 mm
Lead time 1-2 weeks · Warranty 12 months for workmanship · MOQ 1 kg
Thermal camerasMahanadi5 variants
Mahanadi · MAH-107 series
- Detector resolution
- 160 x 120 to 640 x 480 (see variants)
- Temperature range
- -20 to 1200 deg C
- Thermal sensitivity
- Below 0.05 deg C
- Accuracy
- +/-2%
- Focus
- Fixed
Lead time 3-5 weeks · Warranty 24 months from supply · MOQ 1 nos
Third-party inspection (TPI)Mahanadiloha5 variants
SampleServiceThird-party inspection (TPI) Mahanadiloha · MAH-6E1 series
- Inspection effort
- 5 man-days to 100 man-days (see variants)
- Equipment inspected
- Switchgear and relays
- Inspection stage
- In-process
- Standards used
- Per client specification
- Inspector qualification
- Level II NDT certified
Lead time Report in 24-48 hours · Warranty As per contract · MOQ 1 day
Instrument transformers (CT, PT, CVT)Kakatiya6 variants
SampleInstrument transformers (CT, PT, CVT) Kakatiya · KAK-C46 series
- System voltage
- 11 kV to 400 kV (see variants)
- Type
- Combined CT-PT
- Ratio
- 1200-2400/1 A
- Accuracy class
- 0.2S
- Burden
- 15 VA
Lead time 4-6 weeks · Warranty 24 months from commissioning · MOQ 5 nos
PLCC & wave trapsOjasmark3 variants
Ojasmark · OJA-682 series
- Rating / band
- Wave trap 400 A to Wave trap 1250 A (see variants)
- System voltage
- 220 kV
- Frequency band
- 24-500 kHz
- Inductance
- 1.0 mH
- Blocking impedance
- > 570 Ω
Lead time 6-8 weeks · Warranty 24 months from commissioning · MOQ 2 nos
Solar thermal collectors & water heatersNilgirisudarshan4 variants
SampleSolar thermal collectors & water heaters Nilgirisudarshan · NIL-CD2 series
- Capacity
- 200 LPD to 1000 LPD (see variants)
- Collector type
- ETC
- Tank material
- SS 316
- Tank insulation
- Glass wool
- System type
- Thermosyphon
Lead time 3-4 weeks · Warranty 5 years on tank · MOQ 1 nos
Field instruments (pressure, temperature, flow, level)Beasprithvi3 variants
SampleField instruments (pressure, temperature, flow, level) Beasprithvi · BEA-031 series
- Range / size
- 0-10 bar / DN25 to 0-100 bar / DN80 (see variants)
- Output
- FOUNDATION Fieldbus
- Accuracy
- ±0.075%
- Process connection
- 1/2 NPT(F)
- Wetted material
- SS 316L
Lead time 6-8 weeks · Warranty 18 months from supply · MOQ 10 nos
Power-exchange trading servicesCoorgjyoti6 variants
SampleServicePower-exchange trading services Coorgjyoti · COO-5A9 series
- Traded volume
- 1 MU per month to 100 MU per month (see variants)
- Segment
- Day-ahead market
- Licence
- Trading licensee
- Margin
- Per unit trading margin
- Bidding
- Manual with analyst
Lead time Trading from next market day · Warranty Settlement accuracy · MOQ 1 month
Cranes & hydrasSabarmatitamra3 variants
SampleFor rentCranes & hydras Sabarmatitamra · SAB-FA5 series
- Crane capacity
- 40 t to 120 t (see variants)
- Boom length
- 20 m
- Operator
- Included
- Fuel
- Included
- Minimum hire
- 1 shift of 8 h
Lead time Same day to 1 day · Warranty Replacement within 24 h · MOQ 1 nos
Engineering & designKamrup6 variants
SampleServiceEngineering & design Kamrup · KAM-CE1 series
- Plant capacity
- 1 MW to 100 MW (see variants)
- Deliverables
- Full IFC drawing set with calculations
- Design software
- PVsyst, STAAD, ETAP, Civil 3D
- Team
- Lead engineer plus 3 designers
- Turnaround
- 6-8 weeks
Lead time Mobilisation in 7 days · Warranty As per contract · MOQ 1 job
Hydro generatorsAjantaspark5 variants
Ajantaspark · AJA-D31 series
- Rating
- 1 MVA to 30 MVA (see variants)
- Generator voltage
- 11 kV
- Speed
- 750 rpm
- Power factor
- 0.8 lag
- Excitation
- Static
Lead time 12-16 months · Warranty 24 months · MOQ 1 nos
Solar cells, wafers & ingotsSuryaline5 variants
SampleSolar cells, wafers & ingots Suryaline · SUR-409 series
- Format
- M6 166 mm to G12 half-cell (see variants)
- Cell type
- Mono PERC
- Cell efficiency
- 23.6%
- Wafer thickness
- 130 micron
- Conductivity type
- P-type boron
Lead time 4-8 weeks · Warranty As per supply agreement · MOQ 1 nos
Charging transformers & LT panelsAjantasamarth3 variants
SampleCharging transformers & LT panels Ajantasamarth · AJA-C65 series
- Rating
- 1000 kVA to 2500 kVA (see variants)
- Voltage ratio
- 11/0.433 kV
- Type
- Oil-immersed ONAN
- Secondary windings
- Triple isolated
- Vector group
- Dyn11
Lead time 8-12 weeks · Warranty 36 months from supply · MOQ 2 nos
High-efficiency (IE3/IE4) & HT motorsAjanta6 variants
SampleHigh-efficiency (IE3/IE4) & HT motors Ajanta · AJA-545 series
- Rating
- 7.5 kW to 500 kW (see variants)
- Efficiency class
- IE3
- Voltage
- 415 V
- Speed
- 1500 rpm
- Frame
- Fabricated
Lead time 20-26 weeks · Warranty 18 months · MOQ 5 nos
Data & telecom cables (Cat6, coaxial)Indraprasthaanant6 variants
SampleData & telecom cables (Cat6, coaxial) Indraprasthaanant · IND-B06 series
- Type
- Cat5e UTP to RG6 coaxial (see variants)
- Box length
- 305 m
- Conductor
- 24 AWG bare copper
- Pairs
- 1 pair + power
- Jacket
- PVC
Lead time 1 week · Warranty 25 years system warranty (certified installs) · MOQ 5 box
Protective coatings & wrapsSutlej3 variants
SampleProtective coatings & wraps Sutlej · SUT-407 series
- Pack size
- 10 litre to 50 litre (see variants)
- Coating type
- Polyurethane
- Number of packs
- Single pack
- Dry film thickness
- 150 micron
- Solid by volume
- 80%
Lead time 3-7 days · Warranty 12 months shelf life · MOQ 1 litre
Aspirating smoke detectionGridtek4 variants
SampleAspirating smoke detection Gridtek · GRI-F06 series
- Coverage
- Up to 250 m² / 1 pipe to Up to 2000 m² (see variants)
- Sensitivity
- Class B
- Detection
- Laser light scattering
- Alarm levels
- Alert, Action, Fire 1, Fire 2
- Pipe network
- Up to 100 m
Lead time 3-4 weeks · Warranty 36 months from supply · MOQ 1 nos
Tubular busbars & switchyard conductorsMadurai4 variants
SampleTubular busbars & switchyard conductors Madurai · MAD-8B9 series
- Pipe size
- 50 mm OD to 150 mm OD (see variants)
- Material
- Aluminium AA 6101 T6
- Wall thickness
- 6 mm
- Current rating
- 4000 A
- Length available
- 12 m
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 m