Cable pulling winches & rollersMewar4 variants
SampleCable pulling winches & rollers Mewar · MEW-9E8 series
- Pull capacity
- 1 t to 5 t (see variants)
- Drive
- Hand ratchet
- Line speed
- 8 m/min
- Wire rope length
- 50 m
- Motor power
- 7.5 kW
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 2 nos
OEM sparesMewarvolt6 variants
Mewarvolt · MEW-754 series
- Spare category
- Contact kit to Complete overhaul kit (see variants)
- Type
- Compatible
- Voltage
- 230 V AC
- Compatibility
- Equipment model as per nameplate
- Mounting
- Screw terminal
Lead time 3-7 days · Warranty 12 months from supply · MOQ 10 nos
Penstocks, gates & hoistsCoorg3 variants
SamplePenstocks, gates & hoists Coorg · COO-CE8 series
- Diameter / size
- 1.6 m to 2.5 m (see variants)
- Steel grade
- IS 2062 E250
- Plate thickness
- 30-60 mm
- Design head
- 150 m
- Lining
- Cement mortar
Lead time 8-12 weeks · Warranty 24 months · MOQ 10 MT
Surge protection devicesKutch6 variants
SampleSurge protection devices Kutch · KUT-E91 series
- Rating
- Type 2, 20 kA, 600 VDC to Type 1, 50 kA (10/350) (see variants)
- SPD class
- Type 1
- Max continuous voltage (Uc)
- 1500 VDC
- Nominal discharge current (In)
- 40 kA
- Max discharge current (Imax)
- 80 kA
Lead time 1-2 weeks · Warranty 5 years · MOQ 1 nos
BMS & energy management (EMS)Nalanda5 variants
SampleBMS & energy management (EMS) Nalanda · NAL-E01 series
- System scale
- Up to 100 kWh to Up to 50 MWh (see variants)
- Cell count supported
- Up to 384 series
- Voltage sensing accuracy
- +/- 5 mV
- Temperature sensing
- NTC, +/- 1 deg C
- SOC accuracy
- +/- 3%
Lead time 6-8 weeks · Warranty 36 months with AMC · MOQ 1 set
Covered conductors & LT spacersKonkangrid3 variants
SampleCovered conductors & LT spacers Konkangrid · KON-A64 series
- Conductor size
- 95 mm2 to 150 mm2 (see variants)
- Voltage
- 11 kV
- Conductor
- AAAC
- Insulation
- XLPE
- Layers
- Single
Lead time 3-5 weeks · Warranty 24 months · MOQ 2 km
Insulating materials (pressboard, paper, mica, resins)Mahanadiohm6 variants
SampleInsulating materials (pressboard, paper, mica, resins) Mahanadiohm · MAH-572 series
- Thickness / grade
- 0.5 mm to 8 mm (see variants)
- Material
- Kraft paper
- Density
- 1.15 g/cc
- Dielectric strength
- Min 12 kV/mm
- Form
- Moulded part
Lead time 3-5 weeks · Warranty Test report per batch · MOQ 1 kg
Installation & erectionRavikiran4 variants
SampleServiceInstallation & erection Ravikiran · RAV-711 series
- Installation scope
- 10 MW to 100 MW (see variants)
- Scope
- Structure and module installation
- Manpower deployed
- Peak crew of 200
- Supervision
- Site engineer and safety officer
- Equipment
- Own cranes and erection tools
Lead time Phased by block · Warranty Defect liability 24 months · MOQ 1 MW
Transformer overhaul & oil filtrationSahyadriakshay3 variants
SampleServiceTransformer overhaul & oil filtration Sahyadriakshay · SAH-C04 series
- Transformer rating
- 20 MVA to 100 MVA (see variants)
- Service
- Oil reclamation
- Filtration machine
- Vacuum dehydration 6000 L/hr
- Oil BDV target
- Above 70 kV
- Moisture target
- Below 10 ppm
Lead time Planned shutdown required · Warranty Oil quality guarantee 6 months · MOQ 1 nos
Installation & erectionKakatiyasetu4 variants
SampleServiceInstallation & erection Kakatiyasetu · KAK-727 series
- Installation scope
- 1 MW to 25 MW (see variants)
- Scope
- Structure and module installation
- Manpower deployed
- Peak crew of 200
- Supervision
- Site engineer and safety officer
- Equipment
- Pile driver, crane, telehandler
Lead time Phased by block · Warranty Workmanship 12 months · MOQ 1 MW
Fire extinguishersThanjavurkiran5 variants
Thanjavurkiran · THA-0F2 series
- Capacity
- 4 kg to 50 kg wheeled (see variants)
- Type
- ABC powder
- Class rating
- B C
- Cylinder material
- Mild steel
- Operating pressure
- Stored pressure 15 bar
Lead time 1-2 weeks · Warranty 60 months for body · MOQ 1 nos
Power system studies (load flow, short circuit, grid code)Satpurapushpak6 variants
SampleServicePower system studies (load flow, short circuit, grid code) Satpurapushpak · SAT-4B2 series
- Network scale
- 11 kV plant to 400 kV system (see variants)
- Study type
- Protection coordination
- Software
- PSS/E
- Model data
- Utility network model
- Deliverables
- Model files and relay settings
Lead time 2-6 weeks · Warranty Clarifications to utility at no cost · MOQ 1 report
Bay control units & gatewaysThanjavurampere4 variants
SampleBay control units & gateways Thanjavurampere · THA-315 series
- I/O capacity
- 16 DI / 8 DO to 128 DI / 64 DO (see variants)
- Analog inputs
- 16
- Protocols south
- IEC 61850
- Protocols north
- IEC 61850
- Interlocking
- Bay and station level
Lead time 8-10 weeks · Warranty 36 months · MOQ 1 nos
Li-ion BESS containersPrakashmax5 variants
SampleLi-ion BESS containers Prakashmax · PRA-043 series
- Energy capacity
- 372 kWh to 5 MWh (see variants)
- Cell chemistry
- LFP
- Cooling
- Liquid-cooled
- System voltage
- 1000 V DC
- Rated C-rate
- 0.5C
Lead time 6-8 weeks · Warranty 10 years or 6000 cycles · MOQ 1 nos
Ex instrumentsDoabaneel3 variants
Doabaneel · DOA-D22 series
- Instrument type
- Level switch (vibrating fork) to Fixed gas detector (see variants)
- Protection type
- Ex db IIC T6
- Output
- 4-20 mA HART
- Accuracy
- ±0.5%
- Supply
- 24 VDC loop-powered
Lead time 3-4 weeks · Warranty 18 months · MOQ 10 nos
Lattice towers & monopolesSuryamax6 variants
SampleLattice towers & monopoles Suryamax · SUR-806 series
- Voltage class
- 33 kV to 765 kV (see variants)
- Type
- Lattice
- Circuit
- Double
- Tower type
- C 15-deg angle
- Height
- 13 m
Lead time 8-12 weeks · Warranty As per contract · MOQ 5 MT
Cooling towersTaptiakshay3 variants
Taptiakshay · TAP-A92 series
- Flow rate
- 5000 m3/h to 20000 m3/h (see variants)
- Tower type
- Natural draft
- Construction
- FRP
- Fill type
- Splash
- Range
- 8 C
Lead time 8-12 weeks · Warranty 24 months on FRP parts · MOQ 1 nos
Installation & erectionKaverishikhar3 variants
SampleServiceInstallation & erection Kaverishikhar · KAV-724 series
- Installation scope
- 50 MW to 200 MW (see variants)
- Scope
- Structure and module installation
- Manpower deployed
- 25 technicians per MW-block
- Supervision
- Project manager, engineers, QA/QC
- Equipment
- Pile driver, crane, telehandler
Lead time Phased by block · Warranty Defect liability 24 months · MOQ 1 MW
Gas-based suppressionRajatgen5 variants
SampleGas-based suppression Rajatgen · RAJ-FA3 series
- Protected volume
- Up to 50 m³ to 1000-3000 m³ (see variants)
- Agent
- CO2
- Cylinder pressure
- 25 bar
- Discharge time
- 10 seconds
- Detection
- Cross-zoned smoke detectors
Lead time 8-12 weeks · Warranty 12 months from commissioning · MOQ 1 set
Substation constructionMaurya6 variants
SampleServiceSubstation construction Maurya · MAU-369 series
- Voltage class
- 11 kV to 400 kV (see variants)
- Type
- Hybrid GIS
- Scope
- Civil and structural
- Transformers
- Up to 315 MVA
- Earthing
- Copper-bonded rods
Lead time Engineering in 4-6 weeks · Warranty Equipment as per OEM · MOQ 1 bay
Concrete batching & transit mixersVidyutgen3 variants
SampleFor rentConcrete batching & transit mixers Vidyutgen · VID-CC5 series
- Output capacity
- Transit mixer 6 cu m to Batching plant 60 cu m/h (see variants)
- Drum capacity
- 3 cu m
- Type
- Static pump
- Operator
- Not included
- Fuel
- Included
Lead time 1 week · Warranty Breakdown replacement within 48 h · MOQ 1 nos
Precast cable trenches & RCC productsJalsys6 variants
SamplePrecast cable trenches & RCC products Jalsys · JAL-114 series
- Trench inner size (W x D)
- 300 x 300 mm to 1200 x 1200 mm (see variants)
- Unit length
- 1.5 m
- Concrete grade
- M30
- Wall thickness
- 100 mm
- Cover slab
- Precast RCC
Lead time 4 weeks · Warranty 12 months from supply · MOQ 1 m
Solar pumps & controllersSatpura5 variants
SampleSolar pumps & controllers Satpura · SAT-655 series
- Pump rating
- 1 HP to 7.5 HP (see variants)
- Pump type
- Submersible
- Motor type
- BLDC
- Total head
- 100 m
- Daily discharge
- 20000 l
Lead time 2-3 weeks · Warranty 5 years under MNRE scheme · MOQ 1 nos
ACB, MCCB & MCBKamrup3 variants
Kamrup · KAM-615 series
- Rating
- 100 A to 630 A (see variants)
- Breaker type
- ACB
- Poles
- 2P
- Rated voltage
- 690 V AC
- Breaking capacity (Icu)
- 65 kA
Lead time 3-5 weeks · Warranty 24 months from supply · MOQ 5 nos