LT power cablesMaurya4 variants
Maurya · MAU-8B8 series
- Size
- 3.5C x 150 sq mm to 4C x 400 sq mm (see variants)
- Voltage grade
- 1.1 kV
- Conductor
- Copper
- Insulation
- XLPE
- Armour
- Galvanised steel wire
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 10 m
Solar plant O&M & module cleaningKaveriohm4 variants
SampleServiceSolar plant O&M & module cleaning Kaveriohm · KAV-622 series
- Plant capacity
- 1 MWp to 25 MWp (see variants)
- Scope
- Full O&M with spare management
- Cleaning method
- Semi-automatic wet
- Cleaning frequency
- Monthly in monsoon
- Availability guarantee
- Grid availability 99.5%
Lead time Takeover in 2-3 weeks · Warranty Availability guarantee with penalty · MOQ 1 MWp
Installation & erectionMysore3 variants
SampleServiceInstallation & erection Mysore · MYS-729 series
- Installation scope
- 25 MW to 100 MW (see variants)
- Scope
- Complete mechanical and electrical erection
- Manpower deployed
- 60 technicians plus supervisors
- Supervision
- Site engineer and safety officer
- Equipment
- Pile driver, crane, telehandler
Lead time Phased by block · Warranty Workmanship 12 months · MOQ 1 MW
Gas-insulated switchgear (GIS)Tungabhadra5 variants
SampleGas-insulated switchgear (GIS) Tungabhadra · TUN-981 series
- System voltage
- 36 kV to 420 kV (see variants)
- Rated current
- 4000 A
- Short-circuit current
- 40 kA
- Configuration
- Single bus
- Enclosure
- Aluminium alloy
Lead time 20-28 weeks · Warranty 24 months · MOQ 10 bay
HMI & industrial PCsKakatiya6 variants
SampleHMI & industrial PCs Kakatiya · KAK-5F9 series
- Screen size
- 7 inch to 21.5 inch (see variants)
- Display type
- TFT LCD, capacitive touch
- Resolution
- 1920x1080
- CPU
- Intel Core i5
- RAM
- 8 GB
Lead time 2-3 weeks · Warranty 24 months from supply · MOQ 1 nos
Detuned & series reactorsPennar4 variants
SampleDetuned & series reactors Pennar · PEN-B58 series
- Rating
- 10 kVAr to 100 kVAr (see variants)
- Detuning factor
- 5.67% (210 Hz)
- Rated voltage
- 525 V
- Core
- Air core
- Winding
- Aluminium
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 5 nos
InvertersBundelsamarth6 variants
Bundelsamarth · BUN-F76 series
- AC rated power
- 3 kW to 100 kW (see variants)
- Phase
- Three phase
- Max DC input voltage
- 1500 V
- MPPT range
- 550-1500 V
- Number of MPPT
- 1
Lead time 3-5 weeks · Warranty 5 years standard · MOQ 1 nos
SF6 gas & handlingKanchi5 variants
Kanchi · KAN-AE3 series
- Cylinder size
- 5 kg to 50 kg (see variants)
- Purity
- 99.995%
- Moisture
- Below 15 ppmv
- Cylinder
- Seamless steel
- Valve
- DIN 477
Lead time 1-2 weeks · Warranty Test certificate per cylinder · MOQ 1 kg
ACB, MCCB & MCBSamarthmax5 variants
Samarthmax · SAM-617 series
- Rating
- 100 A to 2500 A (see variants)
- Breaker type
- MCB
- Poles
- 4P
- Rated voltage
- 415 V AC
- Breaking capacity (Icu)
- 85 kA
Lead time 3-5 weeks · Warranty 24 months from supply · MOQ 5 nos
Corrosion monitoringWattsys3 variants
SampleCorrosion monitoring Wattsys · WAT-009 series
- Channel count
- 2 channel to 8 channel (see variants)
- Measurement
- Linear polarisation resistance
- Range
- 0-20 mm/year
- Accuracy
- +/-1 mV
- Logging interval
- 1 h
Lead time 2-3 weeks · Warranty 24 months with calibration · MOQ 1 set
Fire extinguishersNandimark3 variants
Nandimark · NAN-D84 series
- Capacity
- 1 kg to 4 kg (see variants)
- Type
- ABC powder
- Class rating
- A B C
- Cylinder material
- Aluminium
- Operating pressure
- Stored pressure 15 bar
Lead time 2-3 weeks · Warranty 12 months · MOQ 1 nos
Live-line & hot-line washingMagadh6 variants
SampleServiceLive-line & hot-line washing Magadh · MAG-343 series
- Voltage level
- 11 kV to 400 kV (see variants)
- Method
- Robotic cleaning
- Resistivity of water
- Demineralised water
- Scope
- Per tower
- Frequency
- Quarterly in coastal areas
Lead time Mobilisation in 5-7 days · Warranty Rewash if flashover within 30 days · MOQ 1 job
Panel wiring & assemblyChambalurja3 variants
SampleServicePanel wiring & assembly Chambalurja · CHA-2B1 series
- Panel complexity
- Up to 500 wires to Up to 2000 wires (see variants)
- Panel type
- LT distribution
- Wiring standard
- IEC 61439
- Wire type
- FRLS 2.5 sq mm
- Ferrules
- Printed with numbering
Lead time 1-2 weeks · Warranty 12 months from delivery · MOQ 1 nos
Building energy management systems (BEMS)Kamrup5 variants
SampleBuilding energy management systems (BEMS) Kamrup · KAM-524 series
- Monitored points
- 100 points to 2500 points (see variants)
- Protocols
- BACnet, LonWorks, OPC
- Metering
- Utility meter integration
- Controls
- HVAC scheduling
- Dashboard
- Cloud and on-premises
Lead time Supply in 4-6 weeks · Warranty Hardware 12 months · MOQ 1 nos
Field instruments (pressure, temperature, flow, level)Shaktiline6 variants
SampleField instruments (pressure, temperature, flow, level) Shaktiline · SHA-147 series
- Range / size
- 0-6 bar / DN15 to 0-600 bar / DN150 (see variants)
- Output
- 4-20 mA + HART
- Accuracy
- ±0.25%
- Process connection
- G1/2
- Wetted material
- Hastelloy C
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Drone & AI inspectionLonavala4 variants
SampleServiceDrone & AI inspection Lonavala · LON-A18 series
- Scope
- Up to 5 MWp to Up to 100 MWp (see variants)
- Sensor
- Radiometric thermal camera
- Resolution
- 640x512 thermal
- Analytics
- Hotspot, diode fault, soiling
- Deliverables
- Defect report with GPS tags
Lead time 1 week · Warranty Re-fly free if data quality fails · MOQ 1 MWp
Refurbished & used equipmentMewar4 variants
SampleUsedRefurbished & used equipment Mewar · MEW-561 series
Fair · made 2015
- Equipment rating
- 25 kVA to 500 kVA (see variants)
- Condition
- Refurbished
- Age
- 5-10 years
- Test report
- Insulation and ratio test
- Voltage class
- 415 V
Lead time 1-2 weeks · Warranty 6 months from supply · MOQ 1 nos
Industrial routers, switches & firewallsSahyadri6 variants
SampleIndustrial routers, switches & firewalls Sahyadri · SAH-CD7 series
- Ports
- 5 ports to 28 ports (see variants)
- Port speed
- 10/100/1000 Mbps
- Redundancy protocol
- ERPS
- Layer
- Layer 3
- PoE
- IEEE 802.3at
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 10 nos
Dry-type transformersCoromandel3 variants
SampleDry-type transformers Coromandel · COR-0E2 series
- Rating
- 250 kVA to 1000 kVA (see variants)
- Voltage ratio
- 11/0.433 kV
- Technology
- Cast resin
- Insulation class
- Class F
- Cooling
- AN/AF
Lead time 8-10 weeks · Warranty 36 months · MOQ 1 nos
Charging hubs & canopiesBeasamrit5 variants
SampleCharging hubs & canopies Beasamrit · BEA-C09 series
- Parking bays
- 4 bays to 40 bays (see variants)
- Structure
- Hot-dip galvanised steel
- Roof
- Polycarbonate
- Solar capacity
- 20 kWp
- Wind load design
- Up to 180 km/h
Lead time 12-16 weeks · Warranty 12 months · MOQ 10 nos
Solar & wind BoP constructionPrakashtron5 variants
SampleServiceSolar & wind BoP construction Prakashtron · PRA-F33 series
- Project size
- 5 MW to 100 MW (see variants)
- Scope
- Complete BoP except modules
- DC cables
- 6 sq mm solar cable
- MV cables
- 33 kV XLPE Cu
- Inverter station
- Brick built room
Lead time 3-9 months execution · Warranty Workmanship 12 months · MOQ 1 MW
Installation & erectionNilgiri3 variants
SampleServiceInstallation & erection Nilgiri · NIL-DB5 series
- Installation scope
- 5 MW to 25 MW (see variants)
- Scope
- Structure and module installation
- Manpower deployed
- Peak crew of 200
- Supervision
- Project manager, engineers, QA/QC
- Equipment
- Own cranes and erection tools
Lead time Phased by block · Warranty Workmanship 12 months · MOQ 1 MW
Flexible, trailing & mining cablesAkashtek6 variants
SampleFlexible, trailing & mining cables Akashtek · AKA-705 series
- Size
- 3C x 2.5 sq mm to 3C x 70 sq mm (see variants)
- Voltage grade
- 3.3 kV
- Conductor
- Bare copper class 5
- Insulation
- EPR
- Sheath
- Heavy duty PCP
Lead time 2-3 weeks · Warranty As per contract · MOQ 1 m
PLC & DCSTeesta6 variants
Teesta · TEE-628 series
- I/O points
- 32 I/O to 1024 I/O (see variants)
- CPU memory
- 8 MB
- Scan time
- < 0.1 ms per 1k
- Redundancy
- Hot standby CPU and network
- Programming
- IEC 61131-3 (LD, FBD, ST)
Lead time 4-6 weeks · Warranty 24 months from supply · MOQ 2 nos