Hardware fittings & dampersTamraline3 variants
SampleHardware fittings & dampers Tamraline · TAM-0D9 series
- Conductor type
- Moose to Twin Moose (see variants)
- Component
- Vibration damper
- Material
- Galvanised steel
- Rated load
- 120 kN
- Slip strength
- 95% of RBL
Lead time 3-4 weeks · Warranty 12 months · MOQ 2 nos
Hardware fittings & dampersCoromandelakash4 variants
SampleHardware fittings & dampers Coromandelakash · COR-F15 series
- Conductor type
- Moose to Quad Moose (see variants)
- Component
- Vibration damper
- Material
- Forged aluminium alloy
- Rated load
- 120 kN
- Slip strength
- 95% of RBL
Lead time 3-4 weeks · Warranty 12 months · MOQ 1 nos
Traction SCADAKalinga3 variants
Kalinga · KAL-279 series
- Control posts
- Up to 10 posts to Up to 50 posts (see variants)
- Architecture
- Redundant server
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 60870-5-104
Lead time 20-28 weeks · Warranty 24 months · MOQ 10 lot
Tubular busbars & switchyard conductorsRajatline4 variants
SampleTubular busbars & switchyard conductors Rajatline · RAJ-092 series
- Pipe size
- 50 mm OD to 150 mm OD (see variants)
- Material
- Aluminium AA 6063
- Wall thickness
- 6 mm
- Current rating
- 1250 A
- Length available
- 10 m
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 m
Poles (PSC, steel, tubular)Dhruvmax6 variants
SamplePoles (PSC, steel, tubular) Dhruvmax · DHR-A41 series
- Pole length
- 8 m to 18 m (see variants)
- Type
- PSC
- Working load
- 500 kg
- Cross section
- Rectangular
- Steel grade
- Fe 540
Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos
Transformer monitoring (online DGA, bushing monitors)Kakatiya4 variants
SampleTransformer monitoring (online DGA, bushing monitors) Kakatiya · KAK-ED2 series
- Gases monitored
- Single gas (H2) to 9 gases (see variants)
- Gases measured
- H2, CO
- Technology
- Photoacoustic
- Measurement interval
- 1 hour
- Accuracy
- +/- 10%
Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos
Poles (PSC, steel, tubular)Godavari6 variants
SamplePoles (PSC, steel, tubular) Godavari · GOD-378 series
- Pole length
- 8 m to 18 m (see variants)
- Type
- Swaged tubular
- Working load
- 200 kg
- Cross section
- Tapered round
- Steel grade
- Fe 540
Lead time 2-3 weeks · Warranty 12 months · MOQ 1 nos
Gas-insulated switchgear (GIS)Konkanparam4 variants
SampleGas-insulated switchgear (GIS) Konkanparam · KON-7A9 series
- System voltage
- 36 kV to 245 kV (see variants)
- Rated current
- 2500 A
- Short-circuit current
- 50 kA
- Configuration
- Single bus
- Enclosure
- Aluminium alloy
Lead time 40-52 weeks · Warranty 36 months · MOQ 1 bay
Bird diverters, aviation warning spheres & anti-climbing devicesPrakashtek6 variants
SampleBird diverters, aviation warning spheres & anti-climbing devices Prakashtek · PRA-082 series
- Conductor / size
- Spiral for 10-15 mm to Anti-climbing spikes (see variants)
- Material
- UV-stabilised PVC
- Colour
- White
- Visibility
- Day and night reflective
- Fixing
- Clip-on
Lead time 2-3 weeks · Warranty 24 months · MOQ 1 nos
Gas-insulated switchgear (GIS)Malabarojas3 variants
SampleGas-insulated switchgear (GIS) Malabarojas · MAL-AC5 series
- System voltage
- 145 kV to 420 kV (see variants)
- Rated current
- 3150 A
- Short-circuit current
- 50 kA
- Configuration
- Double bus
- Enclosure
- Aluminium alloy
Lead time 40-52 weeks · Warranty 24 months · MOQ 1 bay
Surge arresters (station class)Prithvimax4 variants
SampleSurge arresters (station class) Prithvimax · PRI-CD7 series
- System voltage
- 12 kV to 145 kV (see variants)
- Rated voltage
- 192 kV
- Nominal discharge current
- 10 kA
- Line discharge class
- Class 3
- Housing
- Polymer
Lead time 8-10 weeks · Warranty 36 months · MOQ 1 nos
Poles (PSC, steel, tubular)Ravi3 variants
SamplePoles (PSC, steel, tubular) Ravi · RAV-6B8 series
- Pole length
- 9 m to 13 m (see variants)
- Type
- PSC
- Working load
- 500 kg
- Cross section
- Tapered round
- Steel grade
- Fe 540
Lead time 4-6 weeks · Warranty 24 months · MOQ 10 nos
Furnace & rectifier transformersBrahmaputra3 variants
SampleFurnace & rectifier transformers Brahmaputra · BRA-697 series
- Rating
- 20 MVA to 60 MVA (see variants)
- Primary voltage
- 66 kV
- Secondary voltage
- Up to 1000 V
- Application
- Rectifier
- Cooling
- OFWF
Lead time 28-36 weeks · Warranty 36 months from supply · MOQ 1 nos
Gas-insulated switchgear (GIS)Jhelum5 variants
SampleGas-insulated switchgear (GIS) Jhelum · JHE-0F8 series
- System voltage
- 36 kV to 420 kV (see variants)
- Rated current
- 4000 A
- Short-circuit current
- 31.5 kA
- Configuration
- Double bus
- Enclosure
- Aluminium alloy
Lead time 20-28 weeks · Warranty 24 months · MOQ 1 bay
Bus post insulators & clampsMewar4 variants
SampleBus post insulators & clamps Mewar · MEW-D83 series
- System voltage
- 36 kV to 245 kV (see variants)
- Type
- Solid core post
- Cantilever strength
- 8 kN
- Creepage
- 25 mm/kV
- Material
- Porcelain
Lead time 6-8 weeks · Warranty 36 months · MOQ 1 nos
Battery chargers & DC systemsDwaraka4 variants
SampleBattery chargers & DC systems Dwaraka · DWA-704 series
- Rating
- 100 A to 800 A (see variants)
- Output voltage
- 48 V
- Input
- 230 V 1-ph
- Topology
- Thyristor
- Voltage regulation
- +/- 1%
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 nos
Tubular busbars & switchyard conductorsKonkanparam5 variants
SampleTubular busbars & switchyard conductors Konkanparam · KON-094 series
- Pipe size
- 63 mm OD to 250 mm OD (see variants)
- Material
- Copper
- Wall thickness
- 10 mm
- Current rating
- 6300 A
- Length available
- 12 m
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 m
Instrument transformers (CT, PT, CVT)Chambal6 variants
SampleInstrument transformers (CT, PT, CVT) Chambal · CHA-0F7 series
- System voltage
- 11 kV to 400 kV (see variants)
- Type
- Current transformer
- Ratio
- 132 kV/110 V
- Accuracy class
- 0.5
- Burden
- 15 VA
Lead time 10-14 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Hardware fittings & dampersTungabhadrajal3 variants
SampleHardware fittings & dampers Tungabhadrajal · TUN-3A5 series
- Conductor type
- Dog to Moose (see variants)
- Component
- Tension (compression) clamp
- Material
- Forged aluminium alloy
- Rated load
- 70 kN
- Slip strength
- 95% of RBL
Lead time 6-8 weeks · Warranty 12 months · MOQ 1 nos
Station batteries (Ni-Cd, VRLA)Ujjayinisetu6 variants
SampleStation batteries (Ni-Cd, VRLA) Ujjayinisetu · UJJ-DF2 series
- Capacity
- 100 Ah to 1000 Ah (see variants)
- Chemistry
- Flooded lead-acid
- Nominal cell voltage
- 1.2 V
- Number of cells
- 110
- Bank voltage
- 110 V
Lead time 6-8 weeks · Warranty 60 months pro-rata · MOQ 1 nos
Station batteries (Ni-Cd, VRLA)Malabarsurya3 variants
SampleStation batteries (Ni-Cd, VRLA) Malabarsurya · MAL-247 series
- Capacity
- 500 Ah to 1000 Ah (see variants)
- Chemistry
- Flooded lead-acid
- Nominal cell voltage
- 1.2 V
- Number of cells
- 86
- Bank voltage
- 110 V
Lead time 6-8 weeks · Warranty 60 months pro-rata · MOQ 10 nos
OHE masts, cantilevers & catenaryWayanadjoule3 variants
SampleOHE masts, cantilevers & catenary Wayanadjoule · WAY-1C8 series
- Mast type
- Portal 4-track to Booster mast (see variants)
- Section
- Fabricated lattice
- Height
- 9.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty As per contract · MOQ 2 nos
Tower parts, bolts & nutsTungabhadra5 variants
SampleTower parts, bolts & nuts Tungabhadra · TUN-918 series
- Bolt size
- M12 to M30 (see variants)
- Strength class
- 8.8
- Material
- High tensile steel
- Galvanising
- Hot-dip, 75 micron
- Thread
- Metric coarse
Lead time 5-6 weeks · Warranty As per contract · MOQ 10 MT
Shunt & series reactorsKonark4 variants
SampleShunt & series reactors Konark · KON-2C5 series
- Rating
- 5 MVAr to 50 MVAr (see variants)
- System voltage
- 33 kV
- Type
- Shunt
- Construction
- Oil-immersed gapped core
- Phases
- Three
Lead time 20-28 weeks · Warranty 24 months from commissioning · MOQ 2 nos