Factory acceptance test (FAT) witnessingUrjatek5 variants
SampleServiceFactory acceptance test (FAT) witnessing Urjatek · URJ-D87 series
- Equipment value
- INR 25 lakh to INR 10 crore (see variants)
- Test plan
- Based on tender specification
- Tests witnessed
- Routine tests per IS or IEC
- Team
- Specialist engineers per discipline
- Location
- International factory
Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day
Project management (PMC) & owner's engineerOjasline3 variants
SampleServiceProject management (PMC) & owner's engineer Ojasline · OJA-495 series
- Project size
- 5 MW to 25 MW (see variants)
- Scope
- Design review and QA/QC
- Team on site
- PM, 3 engineers, QA/QC inspector
- Schedule control
- Primavera P6 baseline and updates
- Reporting
- Weekly progress report
Lead time Engagement for 6-24 months · Warranty As per contract · MOQ 1 month
Thermography & condition monitoringDoaba5 variants
SampleServiceThermography & condition monitoring Doaba · DOA-793 series
- Asset size
- 5 MW to 100 MW (see variants)
- Technique
- Vibration analysis
- Camera resolution
- 1280x1024 radiometric
- Deliverable
- CAT-wise severity ranking with fix actions
- Drone services
- Ground sampling 3 cm per pixel
Lead time Mobilisation in 3-7 days · Warranty Re-scan of repaired points at no cost · MOQ 1 site
Land identification & aggregationTarangline4 variants
SampleServiceLand identification & aggregation Tarangline · TAR-613 series
- Land requirement
- 250 acres to 2500 acres (see variants)
- Land type
- Private agricultural land
- Acquisition mode
- Long-term lease
- Screening
- Forest and eco-sensitive screening
- Documents
- Revenue records and survey numbers
Lead time Aggregation 3-9 months · Warranty Replacement of failed parcels · MOQ 1 acre
Statutory approvals (CEIG, pollution, forest)Garudatron5 variants
SampleServiceStatutory approvals (CEIG, pollution, forest) Garudatron · GAR-5E1 series
- Approval package
- Single NOC to Wind park set (10) (see variants)
- Approvals covered
- CEIG, DISCOM, MPCB-type consent
- Documentation
- Self-certification and fee payment
- Liaison
- Office liaison
- Statutory fee
- Included
Lead time Approval 4-24 weeks · Warranty As per contract · MOQ 1 application
Warehousing & yard managementMagadh6 variants
SampleServiceWarehousing & yard management Magadh · MAG-8E4 series
- Storage area
- 500 sq m to 25000 sq m (see variants)
- Storage type
- Covered warehouse
- Handling equipment
- Forklifts and cranes
- Security
- Perimeter fencing, access control
- Inventory system
- WMS with barcode
Lead time Setup in 2 weeks · Warranty Insurance cover · MOQ 1 month
Substation & line O&MGarudatron3 variants
SampleServiceSubstation & line O&M Garudatron · GAR-0A8 series
- Voltage level
- 66 kV to 220 kV (see variants)
- Scope
- Maintenance only
- Shift pattern
- General shift plus on-call
- Manpower
- Two engineers plus 12 staff
- Line patrolling
- Quarterly drone patrol
Lead time Mobilisation in 2-3 weeks · Warranty Service credits for avoidable outages · MOQ 1 month
Safety officers & supervisorsDoaba6 variants
SampleServiceSafety officers & supervisors Doaba · DOA-D76 series
- Safety team
- 1 officer to 30 officers (see variants)
- Qualification
- Diploma in Industrial Safety
- Experience
- 3-5 years
- Certifications
- NEBOSH IGC
- Role
- HSE manager
Lead time Deployment in 7-10 days · Warranty Replacement for non-performing officer · MOQ 1 man-month
Freight forwarding & customs clearanceMahanadiloha4 variants
SampleServiceFreight forwarding & customs clearance Mahanadiloha · MAH-0E6 series
- Shipment size
- 5 CBM to Multiple containers (see variants)
- Mode
- Sea FCL
- Customs services
- Bill of entry and clearance
- Incoterm
- CIF
- Permits
- BIS, WPC, import licences
Lead time Booking in 2-3 days · Warranty As per freight terms · MOQ 1 lot
Civil & foundation worksSatpura5 variants
SampleServiceCivil & foundation works Satpura · SAT-471 series
- Works volume
- 1 MW equivalent to 50 MW equivalent (see variants)
- Foundation type
- Raft or isolated footing
- Concrete grade
- M40 for turbine foundation
- Pull-out testing
- Random test plus lateral load
- Reinforcement
- Fe 500D TMT
Lead time Mobilisation in 10 days · Warranty Pile load test certified · MOQ 1 job
Title search & land documentationKutch5 variants
SampleServiceTitle search & land documentation Kutch · KUT-F34 series
- Parcels covered
- 1 parcel to 50 parcels (see variants)
- Search depth
- Back to root of title
- Deliverables
- Title opinion
- Records checked
- Sub-registrar and revenue records
- Registration
- Drafting plus registration support
Lead time Batch 2-6 weeks · Warranty Professional indemnity · MOQ 1 case
Transformer overhaul & oil filtrationVidarbha4 variants
SampleServiceTransformer overhaul & oil filtration Vidarbha · VID-615 series
- Transformer rating
- 1 MVA to 20 MVA (see variants)
- Service
- Oil filtration and dehydration
- Filtration machine
- Mobile 12000 L/hr
- Oil BDV target
- Above 60 kV
- Moisture target
- Below 10 ppm
Lead time Mobilisation in 3-5 days · Warranty Oil quality guarantee 6 months · MOQ 1 nos
Packing & cratingMunnar4 variants
SampleServicePacking & crating Munnar · MUN-DD1 series
- Packing volume
- 5 CBM to 100 CBM (see variants)
- Material
- ISPM-15 treated timber
- Protection
- Desiccant and moisture barrier
- Marking
- Project-specific labelling
- Packing list
- Digital photo record
Lead time Packing in 3-5 days · Warranty As per terms · MOQ 1 lot
Solar & wind BoP constructionShaktimax6 variants
SampleServiceSolar & wind BoP construction Shaktimax · SHA-8C8 series
- Project size
- 10 MW to 400 MW (see variants)
- Scope
- Complete BoP except modules
- DC cables
- 4 sq mm solar cable
- MV cables
- 33 kV XLPE Al armoured
- Inverter station
- Skid or containerised
Lead time Mobilisation in 14 days · Warranty Defect liability 24 months · MOQ 1 MW
Thermography & condition monitoringVidarbha3 variants
SampleServiceThermography & condition monitoring Vidarbha · VID-531 series
- Asset size
- 25 MW to 100 MW (see variants)
- Technique
- Handheld thermography
- Camera resolution
- 1280x1024 radiometric
- Deliverable
- CAT-wise severity ranking with fix actions
- Drone services
- Ground sampling 3 cm per pixel
Lead time Report in 5-10 days · Warranty Re-scan of repaired points at no cost · MOQ 1 site
Technical, legal & financial due diligenceRavipushpak3 variants
SampleServiceTechnical, legal & financial due diligence Ravipushpak · RAV-1B1 series
- Portfolio size
- 5 MW to 50 MW (see variants)
- Scope
- Financial
- Site visit
- All sites above 10 MW
- Legal items
- Land title, PPA, approvals
- Financial items
- Revenue, receivables, tax
Lead time 3-8 weeks · Warranty Professional indemnity · MOQ 1 report
Product certification (BIS, IEC, ALMM)Shaktimark5 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Shaktimark · SHA-236 series
- Certification scope
- Product family BIS to Multi-standard IEC set (see variants)
- Standards covered
- IS 14286 and IS 16077
- Application support
- Documentation and filing
- Test lab liaison
- Notified bodies
- Factory audit
- Pre-audit gap analysis
Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Factory acceptance test (FAT) witnessingAiravatsys6 variants
SampleServiceFactory acceptance test (FAT) witnessing Airavatsys · AIR-DF1 series
- Equipment value
- INR 25 lakh to INR 25 crore (see variants)
- Test plan
- Based on tender specification
- Tests witnessed
- Routine tests per IS or IEC
- Team
- Specialist engineers per discipline
- Location
- Domestic factory
Lead time Report within 2 days of test · Warranty Re-witness at no cost if protocol changes · MOQ 1 day
Statutory approvals (CEIG, pollution, forest)Prithvitek3 variants
SampleServiceStatutory approvals (CEIG, pollution, forest) Prithvitek · PRI-5E5 series
- Approval package
- Solar park set (8) to Transmission project set (12) (see variants)
- Approvals covered
- CEIG, DISCOM, MPCB-type consent
- Documentation
- Drawing and application preparation
- Liaison
- Office liaison
- Statutory fee
- Included
Lead time Approval 4-24 weeks · Warranty Rework of rejected applications at no fee · MOQ 1 application
Third-party inspection (TPI)Urjatron6 variants
SampleServiceThird-party inspection (TPI) Urjatron · URJ-6E5 series
- Inspection effort
- 1 man-day to 100 man-days (see variants)
- Equipment inspected
- Transformers and reactors
- Inspection stage
- In-process
- Standards used
- Per approved QAP
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Type & routine testing laboratories (NABL)Kamrup4 variants
SampleServiceType & routine testing laboratories (NABL) Kamrup · KAM-4F4 series
- Test class
- Acceptance test to Type test (MV) (see variants)
- Equipment under test
- Cables
- Accreditation
- NABL ISO/IEC 17025
- Rating range
- Up to 33 kV
- Test standard
- IS or IEC as specified
Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Thermography & condition monitoringKaverispark6 variants
SampleServiceThermography & condition monitoring Kaverispark · KAV-4E6 series
- Asset size
- 1 MW to 100 MW (see variants)
- Technique
- Partial discharge testing
- Camera resolution
- 1280x1024 radiometric
- Deliverable
- Annotated hotspot report
- Drone services
- Ground sampling 3 cm per pixel
Lead time Report in 5-10 days · Warranty Re-scan of repaired points at no cost · MOQ 1 site
Thermography & condition monitoringSahyadriakshay6 variants
SampleServiceThermography & condition monitoring Sahyadriakshay · SAH-4E7 series
- Asset size
- 1 MW to 100 MW (see variants)
- Technique
- Handheld thermography
- Camera resolution
- 1280x1024 radiometric
- Deliverable
- CAT-wise severity ranking with fix actions
- Drone services
- Ground sampling 3 cm per pixel
Lead time Report in 5-10 days · Warranty Report accuracy as per method · MOQ 1 site
Factory acceptance test (FAT) witnessingKaveridhruv3 variants
SampleServiceFactory acceptance test (FAT) witnessing Kaveridhruv · KAV-A29 series
- Equipment value
- INR 25 lakh to INR 1 crore (see variants)
- Test plan
- Based on tender specification
- Tests witnessed
- Routine plus special tests
- Team
- Specialist engineers per discipline
- Location
- Domestic factory
Lead time Report within 2 days of test · Warranty Re-witness at no cost if protocol changes · MOQ 1 day