Project management (PMC) & owner's engineerTirhut5 variants
SampleServiceProject management (PMC) & owner's engineer Tirhut · TIR-C09 series
- Project size
- 5 MW to 100 MW (see variants)
- Scope
- Owner's engineer through COD
- Team on site
- 1 project manager plus 1 engineer
- Schedule control
- Primavera P6 baseline and updates
- Reporting
- Weekly progress report
Lead time Deployment in 2 weeks · Warranty Professional indemnity cover · MOQ 1 month
Packing & cratingMahanadiloha4 variants
SampleServicePacking & crating Mahanadiloha · MAH-262 series
- Packing volume
- 5 CBM to 100 CBM (see variants)
- Material
- ISPM-15 treated timber
- Protection
- VCI wrap
- Marking
- Handling symbols, tags
- Packing list
- Digital photo record
Lead time Packing in 3-5 days · Warranty As per terms · MOQ 1 lot
Feasibility studies & DPRHoysala3 variants
SampleServiceFeasibility studies & DPR Hoysala · HOY-BB1 series
- Project capacity
- 1 MW to 10 MW (see variants)
- Scope
- Pre-feasibility
- Energy yield
- PVsyst P50/P90
- Financial model
- Project IRR, equity IRR, DSCR
- Grid assessment
- GNA/connectivity route study
Lead time 3-12 weeks · Warranty As per contract · MOQ 1 report
AMC & breakdown servicesMysore5 variants
SampleServiceAMC & breakdown services Mysore · MYS-847 series
- Equipment value covered
- INR 25 lakh to INR 5 crore (see variants)
- Coverage
- Comprehensive with parts
- Visits
- 4 per year
- Response time
- 2 hours critical
- Spare parts
- All parts included up to cap
Lead time Emergency mobilisation in 4-24 hours · Warranty Parts replaced covered for 6 months · MOQ 1 job
Substation & line O&MMaduraisurya5 variants
SampleServiceSubstation & line O&M Maduraisurya · MAD-0A6 series
- Voltage level
- 11 kV to 220 kV (see variants)
- Scope
- Operation and maintenance
- Shift pattern
- General shift plus on-call
- Manpower
- Two engineers plus 12 staff
- Line patrolling
- Quarterly drone patrol
Lead time Baseline condition audit first · Warranty As per contract · MOQ 1 month
Engineering & designHampiurja3 variants
SampleServiceEngineering & design Hampiurja · HAM-779 series
- Plant capacity
- 10 MW to 50 MW (see variants)
- Deliverables
- Design basis report plus drawings
- Design software
- PVsyst, AutoCAD, ETAP
- Team
- Lead engineer plus 3 designers
- Turnaround
- 6-8 weeks
Lead time Mobilisation in 7 days · Warranty Design correction at no cost for 12 months · MOQ 1 job
Open-access approvalsLonavalaprabha4 variants
SampleServiceOpen-access approvals Lonavalaprabha · LON-028 series
- Contract demand
- 10 MW to 100 MW (see variants)
- Access type
- Long term
- Scope
- Application and follow-up
- Approvals
- SLDC
- Charges analysis
- Wheeling, CSS and additional surcharge
Lead time Filing in 1 week · Warranty As per contract · MOQ 1 application
AMC & breakdown servicesRavi4 variants
SampleServiceAMC & breakdown services Ravi · RAV-016 series
- Equipment value covered
- INR 10 lakh to INR 1 crore (see variants)
- Coverage
- Preventive plus breakdown labour
- Visits
- 4 per year
- Response time
- 2 hours critical
- Spare parts
- Consumables only
Lead time Emergency mobilisation in 4-24 hours · Warranty Parts replaced covered for 6 months · MOQ 1 job
Lender's engineer & TEV studiesKakatiyaojas6 variants
SampleServiceLender's engineer & TEV studies Kakatiyaojas · KAK-EC1 series
- Project cost
- INR 25 crore to INR 1000 crore (see variants)
- Phase
- Pre-financing TEV
- Scope
- Technical, cost and schedule review
- Reporting
- Monthly progress report
- Site visits
- Monthly
Lead time 4-8 weeks for TEV · Warranty Report reliance letter to lenders · MOQ 1 report
Tariff & regulatory advisorySatpura6 variants
SampleServiceTariff & regulatory advisory Satpura · SAT-F98 series
- Matter complexity
- Advisory note to Appeal before APTEL (see variants)
- Forum
- State Electricity Regulatory Commission
- Deliverable
- Opinion note
- Representation
- Drafting only
- Data support
- Benchmark analysis
Lead time Initial note in 1 week · Warranty Free redrafting if Commission raises defects · MOQ 1 case
EIA, ESG & environmental studiesKrishnavayu6 variants
SampleServiceEIA, ESG & environmental studies Krishnavayu · KRI-FC3 series
- Project scale
- Under 25 MW to 1 GW (see variants)
- Study
- Comprehensive EIA
- Baseline season
- Three seasons
- Deliverables
- Draft EIA, EMP, public hearing support
- Lab testing
- NABL accredited lab
Lead time 8-12 weeks, longer with seasonal baseline · Warranty Query response with regulators at no cost · MOQ 1 report
Substation & line O&MMagadh5 variants
SampleServiceSubstation & line O&M Magadh · MAG-8E7 series
- Voltage level
- 11 kV to 220 kV (see variants)
- Scope
- Operation, maintenance and statutory compliance
- Shift pattern
- General shift plus on-call
- Manpower
- Engineer plus 6 operators
- Line patrolling
- Monthly foot patrol
Lead time Baseline condition audit first · Warranty As per contract · MOQ 1 month
Electrical safety auditsUrjatek5 variants
SampleServiceElectrical safety audits Urjatek · URJ-5F2 series
- Installed load
- 1 MVA to 50 MVA (see variants)
- Scope
- Audit with measurements
- Auditor
- CEA-licensed engineer
- Measurements
- Thermography and power quality
- Report
- Action plan with timeline
Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Transformer overhaul & oil filtrationDoaba5 variants
SampleServiceTransformer overhaul & oil filtration Doaba · DOA-1C6 series
- Transformer rating
- 1 MVA to 50 MVA (see variants)
- Service
- Oil reclamation
- Filtration machine
- Mobile 12000 L/hr
- Oil BDV target
- Above 70 kV
- Moisture target
- Below 5 ppm
Lead time Planned shutdown required · Warranty Workmanship 12 months · MOQ 1 nos
Project management (PMC) & owner's engineerSatpura5 variants
SampleServiceProject management (PMC) & owner's engineer Satpura · SAT-C09 series
- Project size
- 5 MW to 100 MW (see variants)
- Scope
- Full PMC with contract management
- Team on site
- PM, 3 engineers, QA/QC inspector
- Schedule control
- Primavera P6 baseline and updates
- Reporting
- Weekly progress report
Lead time Engagement for 6-24 months · Warranty Professional indemnity cover · MOQ 1 month
Training & certification (electrical licence, work at height)Mysorevidyut4 variants
SampleServiceTraining & certification (electrical licence, work at height) Mysorevidyut · MYS-276 series
- Course duration
- 3 days to 30 days (see variants)
- Programme
- Substation operator
- Mode
- Hybrid
- Batch size
- 20 participants
- Certification
- Training completion certificate
Lead time Next batch in 2-4 weeks · Warranty Re-attempt of assessment at no cost · MOQ 1 nos
Statutory approvals (CEIG, pollution, forest)Munnar3 variants
SampleServiceStatutory approvals (CEIG, pollution, forest) Munnar · MUN-579 series
- Approval package
- 5 approvals to Wind park set (10) (see variants)
- Approvals covered
- CEIG, DISCOM, MPCB-type consent
- Documentation
- Self-certification and fee payment
- Liaison
- Site inspection coordination
- Statutory fee
- At actuals
Lead time Approval 4-24 weeks · Warranty As per contract · MOQ 1 application
Freight forwarding & customs clearanceMalwa4 variants
SampleServiceFreight forwarding & customs clearance Malwa · MAL-514 series
- Shipment size
- 1 CBM to 40 ft container (see variants)
- Mode
- Air freight
- Customs services
- Bill of entry and clearance
- Incoterm
- FOB
- Permits
- Solar and EPCG benefits
Lead time Booking in 2-3 days · Warranty As per freight terms · MOQ 1 lot
Freight forwarding & customs clearanceDeepmark3 variants
SampleServiceFreight forwarding & customs clearance Deepmark · DEE-AB3 series
- Shipment size
- 5 CBM to 40 ft container (see variants)
- Mode
- Multimodal
- Customs services
- Duty planning and classification
- Incoterm
- DAP
- Permits
- Solar and EPCG benefits
Lead time Booking in 2-3 days · Warranty As per freight terms · MOQ 1 lot
Type & routine testing laboratories (NABL)Vidyutline5 variants
SampleServiceType & routine testing laboratories (NABL) Vidyutline · VID-929 series
- Test class
- Acceptance test to Type test (HV) (see variants)
- Equipment under test
- Distribution transformers
- Accreditation
- NABL ISO/IEC 17025
- Rating range
- Up to 33 kV
- Test standard
- Customer specific test plan
Lead time Test report in 3-8 weeks · Warranty Free retest on lab error · MOQ 1 nos
Solar & wind BoP constructionSatpurapushpak3 variants
SampleServiceSolar & wind BoP construction Satpurapushpak · SAT-F36 series
- Project size
- 5 MW to 25 MW (see variants)
- Scope
- Cabling and earthing
- DC cables
- 6 sq mm solar cable
- MV cables
- 33 kV XLPE Cu
- Inverter station
- Brick built room
Lead time 3-9 months execution · Warranty Defect liability 24 months · MOQ 1 MW
Skilled technicians & electriciansVidyuttron3 variants
SampleServiceSkilled technicians & electricians Vidyuttron · VID-7E2 series
- Team size
- 50 persons to 200 persons (see variants)
- Trade
- Instrument technician
- Qualification
- Licensed wireman
- Experience
- 2-5 years
- Compliance
- Contract labour licence
Lead time Mass mobilisation in 3 weeks · Warranty As per contract · MOQ 1 man-month
Packing & cratingMagadh6 variants
SampleServicePacking & crating Magadh · MAG-915 series
- Packing volume
- 5 CBM to 500 CBM (see variants)
- Material
- ISPM-15 treated timber
- Protection
- Desiccant and moisture barrier
- Marking
- Project-specific labelling
- Packing list
- Itemised with weights
Lead time Large lots 10 days · Warranty Packing damage replacement · MOQ 1 lot
Thermography & condition monitoringSahyadriakshay6 variants
SampleServiceThermography & condition monitoring Sahyadriakshay · SAH-539 series
- Asset size
- 1 MW to 100 MW (see variants)
- Technique
- Vibration analysis
- Camera resolution
- 640x480 radiometric
- Deliverable
- Annotated hotspot report
- Drone services
- Ground sampling 3 cm per pixel
Lead time Report in 5-10 days · Warranty Re-scan of repaired points at no cost · MOQ 1 site