Packing & cratingKrishna3 variants
SampleServicePacking & crating Krishna · KRI-794 series
- Packing volume
- 50 CBM to 250 CBM (see variants)
- Material
- Steel frames
- Protection
- Desiccant and moisture barrier
- Marking
- Handling symbols, tags
- Packing list
- Digital photo record
Lead time Packing in 3-5 days · Warranty Packing damage replacement · MOQ 1 lot
AMC & breakdown servicesPrakashsys6 variants
SampleServiceAMC & breakdown services Prakashsys · PRA-1A9 series
- Equipment value covered
- INR 10 lakh to INR 5 crore (see variants)
- Coverage
- Preventive visits only
- Visits
- 4 per year
- Response time
- 2 hours critical
- Spare parts
- Parts at cost
Lead time Emergency mobilisation in 4-24 hours · Warranty Parts replaced covered for 6 months · MOQ 1 job
Transmission line erection & stringingNilgiri3 variants
SampleServiceTransmission line erection & stringing Nilgiri · NIL-EA8 series
- Voltage level
- 220 kV to 765 kV (see variants)
- Circuit type
- Multi-circuit on narrow base
- Conductor
- ACSR Moose
- Scope
- Foundation, erection and stringing
- Stringing method
- Tension stringing
Lead time Material availability dependent · Warranty Workmanship 12 months · MOQ 1 km
Site acceptance & pre-commissioning testsMahanadiloha5 variants
SampleServiceSite acceptance & pre-commissioning tests Mahanadiloha · MAH-C64 series
- Plant size
- 5 MW to 100 MW (see variants)
- Scope
- Solar SAT
- Instruments
- Insulation tester, earth tester
- Test sequence
- Visual, mechanical, electrical
- Team
- Team of 6 with lead
Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Surveys (topo, geotech, drone)Satpurapushpak6 variants
SampleServiceSurveys (topo, geotech, drone) Satpurapushpak · SAT-796 series
- Survey area
- 25 acres to 1000 acres (see variants)
- Survey method
- Drone photogrammetry
- Accuracy
- Horizontal 20 mm, vertical 30 mm
- Deliverables
- Contour map, DEM, CAD plan
- Geotech boreholes
- As per project requirement
Lead time Report within 3 weeks of fieldwork · Warranty Report validity for design purpose · MOQ 1 site
Third-party inspection (TPI)Airavatsys4 variants
SampleServiceThird-party inspection (TPI) Airavatsys · AIR-091 series
- Inspection effort
- 10 man-days to 100 man-days (see variants)
- Equipment inspected
- Switchgear and relays
- Inspection stage
- In-process
- Standards used
- Per approved QAP
- Inspector qualification
- B.E. Electrical with 8 years experience
Lead time Report in 24-48 hours · Warranty As per contract · MOQ 1 day
Technical, legal & financial due diligenceDeepmark6 variants
SampleServiceTechnical, legal & financial due diligence Deepmark · DEE-1B6 series
- Portfolio size
- 25 MW to 1 GW (see variants)
- Scope
- Technical
- Site visit
- All sites above 10 MW
- Legal items
- Litigation and compliance check
- Financial items
- Revenue, receivables, tax
Lead time Kick-off in 1 week · Warranty Professional indemnity · MOQ 1 report
Open-access approvalsArcmark6 variants
SampleServiceOpen-access approvals Arcmark · ARC-358 series
- Contract demand
- 1 MW to 100 MW (see variants)
- Access type
- Short term
- Scope
- Agreement drafting and execution
- Approvals
- SLDC
- Charges analysis
- Landed cost workings
Lead time Approval in 15-90 days · Warranty As per contract · MOQ 1 application
AMC & breakdown servicesNilgiri5 variants
SampleServiceAMC & breakdown services Nilgiri · NIL-216 series
- Equipment value covered
- INR 10 lakh to INR 2.5 crore (see variants)
- Coverage
- Preventive visits only
- Visits
- Monthly
- Response time
- 4 hours
- Spare parts
- Consumables only
Lead time Emergency mobilisation in 4-24 hours · Warranty Parts replaced covered for 6 months · MOQ 1 job
Installation & erectionSatavahanakelvin3 variants
SampleServiceInstallation & erection Satavahanakelvin · SAT-716 series
- Installation scope
- 25 MW to 100 MW (see variants)
- Scope
- Structure and module installation
- Manpower deployed
- 25 technicians per MW-block
- Supervision
- Site engineer and safety officer
- Equipment
- Own cranes and erection tools
Lead time Mobilisation in 10 days · Warranty Defect liability 24 months · MOQ 1 MW
Product certification (BIS, IEC, ALMM)Dwaraka3 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Dwaraka · DWA-461 series
- Certification scope
- IEC 61215 and 61730 to Full global set (see variants)
- Standards covered
- IEC 61215 and 61730
- Application support
- Documentation and filing
- Test lab liaison
- Notified bodies
- Factory audit
- Pre-audit gap analysis
Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 application
EPC / turnkey contractingMysorevidyut3 variants
SampleServiceEPC / turnkey contracting Mysorevidyut · MYS-AB8 series
- Project capacity
- 50 MWp to 300 MWp (see variants)
- Scope
- Design, supply, install, commission
- Module technology
- Mono PERC DCR
- Inverter
- Central inverter
- Performance guarantee
- PR 82% with CUF guarantee
Lead time Contract to start in 2-3 weeks · Warranty Module 12-year product, 25-year performance · MOQ 1 MWp
Recruitment servicesArcmark4 variants
SampleServiceRecruitment services Arcmark · ARC-798 series
- Role seniority
- Engineer to General manager (see variants)
- Fee basis
- Percentage of annual CTC
- Search
- Targeted headhunting
- Screening
- Telephonic and technical interview
- Verification
- Criminal and credit check
Lead time Closure in 30-60 days · Warranty Replacement within 3 months · MOQ 1 case
Warehousing & yard managementKalinga5 variants
SampleServiceWarehousing & yard management Kalinga · KAL-872 series
- Storage area
- 1000 sq m to 25000 sq m (see variants)
- Storage type
- Open yard
- Handling equipment
- Forklifts and cranes
- Security
- Perimeter fencing, access control
- Inventory system
- WMS with barcode
Lead time Setup in 2 weeks · Warranty Stock loss indemnity as per agreement · MOQ 1 month
Land identification & aggregationKaverishikhar5 variants
SampleServiceLand identification & aggregation Kaverishikhar · KAV-2F7 series
- Land requirement
- 100 acres to 2500 acres (see variants)
- Land type
- Private agricultural land
- Acquisition mode
- Long-term lease
- Screening
- Forest and eco-sensitive screening
- Documents
- 7/12 extracts, mutation, maps
Lead time Shortlist in 3-6 weeks · Warranty Replacement of failed parcels · MOQ 1 acre
Surveys (topo, geotech, drone)Deepmark6 variants
SampleServiceSurveys (topo, geotech, drone) Deepmark · DEE-8D6 series
- Survey area
- 25 acres to 1000 acres (see variants)
- Survey method
- Drone photogrammetry
- Accuracy
- Horizontal 20 mm, vertical 30 mm
- Deliverables
- Geotech report with bore logs
- Geotech boreholes
- 1 per 10 acres to 15 m depth
Lead time Mobilisation in 5 days · Warranty Re-survey of disputed areas at no cost · MOQ 1 site
Engineering & designWayanad4 variants
SampleServiceEngineering & design Wayanad · WAY-005 series
- Plant capacity
- 1 MW to 25 MW (see variants)
- Deliverables
- Design basis report plus drawings
- Design software
- PVsyst, AutoCAD, ETAP
- Team
- Lead engineer plus 3 designers
- Turnaround
- 6-8 weeks
Lead time 6-10 weeks · Warranty As per contract · MOQ 1 job
Contract engineersKakatiyarajat5 variants
SampleServiceContract engineers Kakatiyarajat · KAK-824 series
- Engineers deployed
- 3 engineers to 50 engineers (see variants)
- Discipline
- SCADA
- Experience
- 5-10 years
- Qualification
- B.E./B.Tech
- Engagement
- Offsite design hub
Lead time Joining in 2-4 weeks · Warranty Replacement within 30 days if unsuitable · MOQ 1 man-month
Product certification (BIS, IEC, ALMM)Airavatsys5 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Airavatsys · AIR-465 series
- Certification scope
- ALMM List-I to Full global set (see variants)
- Standards covered
- IEC 62109 for inverters
- Application support
- Documentation and filing
- Test lab liaison
- Notified bodies
- Factory audit
- Pre-audit gap analysis
Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 application
Freight forwarding & customs clearanceMagadh4 variants
SampleServiceFreight forwarding & customs clearance Magadh · MAG-0E8 series
- Shipment size
- 1 CBM to 40 ft container (see variants)
- Mode
- Multimodal
- Customs services
- Duty planning and classification
- Incoterm
- DAP
- Permits
- BIS, WPC, import licences
Lead time Delivery 1-6 weeks · Warranty As per freight terms · MOQ 1 lot
Solar & wind BoP constructionKakatiyasetu4 variants
SampleServiceSolar & wind BoP construction Kakatiyasetu · KAK-D79 series
- Project size
- 5 MW to 50 MW (see variants)
- Scope
- Cabling and earthing
- DC cables
- 4 sq mm solar cable
- MV cables
- 33 kV XLPE Cu
- Inverter station
- Brick built room
Lead time Mobilisation in 14 days · Warranty Defect liability 24 months · MOQ 1 MW
Resource assessment (solar, wind, hydro)Nilgiri5 variants
SampleServiceResource assessment (solar, wind, hydro) Nilgiri · NIL-EB2 series
- Measurement duration
- Desktop study to 18 months (see variants)
- Technology
- Small hydro
- Data source
- On-site measurement
- Equipment
- Class A pyranometer station
- Uncertainty
- P50/P90 with uncertainty budget
Lead time Desktop in 2-3 weeks · Warranty As per contract · MOQ 1 report
Substation constructionKaverishikhar5 variants
SampleServiceSubstation construction Kaverishikhar · KAV-092 series
- Voltage class
- 33 kV to 400 kV (see variants)
- Type
- Indoor GIS
- Scope
- Full turnkey
- Transformers
- Up to 160 MVA
- Earthing
- Copper-bonded rods
Lead time Execution 6-15 months · Warranty Defect liability 24 months · MOQ 1 bay
Transmission line erection & stringingVindhya5 variants
SampleServiceTransmission line erection & stringing Vindhya · VIN-B74 series
- Voltage level
- 66 kV to 765 kV (see variants)
- Circuit type
- Multi-circuit on narrow base
- Conductor
- AAAC or HTLS
- Scope
- Erection and stringing only
- Stringing method
- Tension stringing
Lead time Mobilisation in 15 days · Warranty Workmanship 12 months · MOQ 1 km