Recruitment servicesAgnicore4 variants
SampleServiceRecruitment services Agnicore · AGN-6B8 series
- Role seniority
- Manager to CXO (see variants)
- Fee basis
- Fixed fee per hire
- Search
- Database and referrals
- Screening
- Assessment centre
- Verification
- Education and employment check
Lead time Shortlist in 7-15 days · Warranty Fee refund if candidate leaves early · MOQ 1 case
EHV & HV cablesVidyuttek4 variants
Vidyuttek · VID-B34 series
- Rating
- 66 kV 1C x 300 sq mm Al to 132 kV 1C x 800 sq mm Al (see variants)
- Conductor
- Stranded copper
- Insulation
- XLPE (triple extruded)
- Metallic screen
- Corrugated aluminium
- Outer sheath
- PVC ST2
Lead time 16-24 weeks · Warranty As per contract · MOQ 1 km
Hot-gas-path parts & overhaul kitsPataliputra5 variants
SampleHot-gas-path parts & overhaul kits Pataliputra · PAT-A92 series
- Turbine class
- 30 MW to 250 MW (see variants)
- Component
- Vanes
- Stage
- Stage 2
- Base alloy
- Cobalt alloy
- Coating
- TBC
Lead time 8-16 weeks · Warranty 12 months · MOQ 2 set
Ring main units (RMU)Nilgirisudarshan5 variants
SampleRing main units (RMU) Nilgirisudarshan · NIL-995 series
- Configuration
- 2-way (LBS+LBS) to 4-way (3LBS+TF) (see variants)
- Rated voltage
- 12 kV
- Rated current - ring
- 400 A
- Transformer feeder
- 630 A VCB
- Short-circuit rating
- 20 kA/3 s
Lead time 4-6 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Type & routine testing laboratories (NABL)Malwavolt6 variants
SampleServiceType & routine testing laboratories (NABL) Malwavolt · MAL-925 series
- Test class
- Acceptance test to Short-circuit test (see variants)
- Equipment under test
- Cables
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 145 kV
- Test standard
- Customer specific test plan
Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Earth & soil resistivity testersPallavasamarth3 variants
SampleEarth & soil resistivity testers Pallavasamarth · PAL-417 series
- Measuring range
- 0-20 ohm to 0-2 kohm (see variants)
- Method
- 4-pole Wenner
- Test frequency
- 128 Hz
- Test current
- Up to 50 mA
- Accuracy
- +/-5%
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 10 nos
Earthing & auxiliary transformersNarmadapushpak4 variants
SampleEarthing & auxiliary transformers Narmadapushpak · NAR-FC7 series
- Rating
- 100 kVA to 1000 kVA (see variants)
- Type
- Station service
- Primary voltage
- 33 kV
- Secondary voltage
- 0.433 kV
- Short-time rating
- 10 s
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Third-party inspection (TPI)Krishna3 variants
SampleServiceThird-party inspection (TPI) Krishna · KRI-AE6 series
- Inspection effort
- 1 man-day to 10 man-days (see variants)
- Equipment inspected
- Cables and conductors
- Inspection stage
- Final pre-dispatch
- Standards used
- Per client specification
- Inspector qualification
- B.E. Electrical with 8 years experience
Lead time Inspector assigned in 48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day
Harmonic filtersSahyadriagni4 variants
Sahyadriagni · SAH-6A8 series
- Filter rating
- 50 kVAr to 300 kVAr (see variants)
- Tuned to
- 7th
- Voltage
- 440 V
- Reactor core
- CRGO laminated
- Reactor insulation
- Class H
Lead time 6-8 weeks · Warranty 12 months from commissioning · MOQ 1 nos
UPS systemsSutlejtej5 variants
Sutlejtej · SUT-5E8 series
- Rating
- 10 kVA to 100 kVA (see variants)
- Topology
- Online double conversion
- Input / output
- 3-ph / 3-ph
- Input voltage window
- 304-478 V
- Output power factor
- 0.9
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
Testing & commissioningRavikiran6 variants
SampleServiceTesting & commissioning Ravikiran · RAV-B91 series
- Plant capacity
- 5 MW to 250 MW (see variants)
- Tests covered
- Full plant functional and PR test
- Instruments
- Relay test set, thermal camera
- Calibration
- Calibration valid at test date
- Team
- Lead plus 5 member crew
Lead time 1-2 weeks on site · Warranty Retest at no cost if failure traced to test error · MOQ 1 MW
Shunt & series reactorsThanjavurprakash6 variants
SampleShunt & series reactors Thanjavurprakash · THA-754 series
- Rating
- 5 MVAr to 125 MVAr (see variants)
- System voltage
- 220 kV
- Type
- Shunt
- Construction
- Oil-immersed gapped core
- Phases
- Three
Lead time 20-28 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Insulating materials (pressboard, paper, mica, resins)Godavarineel6 variants
SampleInsulating materials (pressboard, paper, mica, resins) Godavarineel · GOD-0A4 series
- Thickness / grade
- 0.5 mm to 8 mm (see variants)
- Material
- Muscovite mica
- Density
- 1.25 g/cc
- Dielectric strength
- Min 12 kV/mm
- Form
- Sheet
Lead time 3-5 weeks · Warranty Test report per batch · MOQ 1 kg
CCTV & video analyticsMewaragni4 variants
SampleCCTV & video analytics Mewaragni · MEW-6F3 series
- Item
- IP bullet 4 MP to Thermal 640x512 (see variants)
- Resolution
- 2 MP
- Lens
- Motorised zoom
- IR range
- 50 m
- Video compression
- H.264
Lead time 1-2 weeks · Warranty 36 months from supply · MOQ 1 nos
Simulators & e-learningLonavalaprabha6 variants
SampleServiceSimulators & e-learning Lonavalaprabha · LON-9D3 series
- Licensed users
- 10 users to 500 users (see variants)
- Product type
- VR headset based
- Content
- Safety scenarios
- Languages
- Regional languages
- Assessment
- Certificate on completion
Lead time Deployment in 2-3 weeks · Warranty Bug fixes at no cost · MOQ 1 nos
Gas-insulated switchgear (GIS)Mewar5 variants
SampleGas-insulated switchgear (GIS) Mewar · MEW-AC1 series
- System voltage
- 36 kV to 420 kV (see variants)
- Rated current
- 4000 A
- Short-circuit current
- 31.5 kA
- Configuration
- Ring bus
- Enclosure
- Steel
Lead time 40-52 weeks · Warranty 36 months · MOQ 2 bay
Feeder pillars & LT distribution boxesKakatiya5 variants
SampleFeeder pillars & LT distribution boxes Kakatiya · KAK-412 series
- Rating
- 200 A to 1250 A (see variants)
- Enclosure material
- Galvanised steel
- Ways
- 2-way
- Busbar
- Copper
- Incomer
- Switch-fuse
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 10 nos
Hydraulic crimping & cutting toolsMagadhrajat4 variants
SampleHydraulic crimping & cutting tools Magadhrajat · MAG-AA4 series
- Crimping range
- 16-300 sq mm to 185-800 sq mm (see variants)
- Force
- 120 kN
- Operation
- Foot pump
- Die type
- Indent
- Dies included
- 10 pairs
Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 1 nos
Structural steel (angles, channels, plates)Godavarineel5 variants
SampleStructural steel (angles, channels, plates) Godavarineel · GOD-5C7 series
- Section size
- ISA 75x75x6 to Plate 10 mm (see variants)
- Grade
- IS 2062 E410
- Length
- 9 m
- Process
- Hot rolled
- Surface
- Black
Lead time 2-3 weeks · Warranty Mill test certificate · MOQ 2 MT
DC fast chargersBeasamrit5 variants
Beasamrit · BEA-155 series
- Rated power
- 120 kW to 480 kW (see variants)
- Connector
- CCS2
- Output voltage
- 200-1000 V
- Output current
- Up to 200 A
- Number of guns
- 2
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Solar cells, wafers & ingotsBundellumen4 variants
SampleSolar cells, wafers & ingots Bundellumen · BUN-3C6 series
- Format
- G12 210 mm to Wafer 182 mm (see variants)
- Cell type
- HJT
- Cell efficiency
- 23.6%
- Wafer thickness
- 150 micron
- Conductivity type
- N-type phosphorus
Lead time 2-3 weeks · Warranty 6 months from supply · MOQ 1 nos
Gas turbinesMahabaleshwarprakash4 variants
Mahabaleshwarprakash · MAH-702 series
- ISO rating
- 5 MW to 50 MW (see variants)
- Type
- Heavy-duty frame
- Fuel
- Dual fuel gas / HSD
- Efficiency
- 33%
- Exhaust temperature
- 600 C
Lead time 18-26 months · Warranty Long-term service agreement · MOQ 5 nos
Furnace & rectifier transformersThanjavurprakash4 variants
SampleFurnace & rectifier transformers Thanjavurprakash · THA-BF8 series
- Rating
- 10 MVA to 60 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- Up to 1000 V
- Application
- SAF
- Cooling
- OFAF
Lead time 28-36 weeks · Warranty 36 months from supply · MOQ 5 nos
Fuel oil & firing systemsShivaliklumen6 variants
SampleFuel oil & firing systems Shivaliklumen · SHI-5A7 series
- Burner capacity
- 500 kg/h to 10000 kg/h (see variants)
- Fuel
- Gas
- Atomisation
- Steam
- Turndown
- 6:1
- Heater
- Steam
Lead time 12-16 weeks · Warranty 18 months · MOQ 1 set