Lubricants & greasesLohaline3 variants
SampleLubricants & greases Lohaline · LOH-A85 series
- Pack size
- 5 kg to 50 kg (see variants)
- Product type
- Grease
- Viscosity grade
- ISO VG 320
- Base oil
- Synthetic PAO
- NLGI grade
- 1
Lead time 1-2 weeks · Warranty 24 months shelf life in sealed pack · MOQ 1 kg
Piles & foundationsPallavaparam6 variants
SamplePiles & foundations Pallavaparam · PAL-719 series
- Pile diameter
- 300 mm to 1000 mm (see variants)
- Pile type
- Bored cast-in-situ
- Concrete grade
- M35
- Pile length
- 9 m
- Reinforcement
- Fe 500D
Lead time 4-6 weeks · Warranty Design life 50 years · MOQ 1 nos
OHE masts, cantilevers & catenaryKalinga4 variants
SampleOHE masts, cantilevers & catenary Kalinga · KAL-F56 series
- Mast type
- Double track mast to Tunnel bracket (see variants)
- Section
- Rolled beam
- Height
- 11.5 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty As per contract · MOQ 1 nos
Cooling towersSahyadri3 variants
Sahyadri · SAH-663 series
- Flow rate
- 500 m3/h to 2500 m3/h (see variants)
- Tower type
- Crossflow
- Construction
- Pressure-treated wood
- Fill type
- PVC film
- Range
- 8 C
Lead time 16-24 weeks · Warranty 24 months on FRP parts · MOQ 2 nos
GPS clocks & time synchronisationHertzcore3 variants
SampleGPS clocks & time synchronisation Hertzcore · HER-9C6 series
- Output set
- NTP + IRIG-B + 1PPS to PTP + IRIG-B + PPS + serial (see variants)
- Time source
- GPS + GLONASS + NavIC
- Accuracy
- ±1 µs
- Network protocols
- PTP IEEE 1588 v2
- PTP profile
- Default
Lead time 6-8 weeks · Warranty 36 months from supply · MOQ 2 nos
E-waste managementPallavaprabha3 variants
SampleServiceE-waste management Pallavaprabha · PAL-DE8 series
- E-waste quantity
- 1 tonne to 25 tonnes (see variants)
- Service
- Collection and recycling
- Categories
- Batteries
- Authorisation
- State PCB authorised
- Data destruction
- Certificate of data wipe
Lead time Pick-up in 5-7 days · Warranty Certificate of recycling · MOQ 1 tonne
Substation & line O&MSahyadriakshay3 variants
SampleServiceSubstation & line O&M Sahyadriakshay · SAH-CB9 series
- Voltage level
- 66 kV to 220 kV (see variants)
- Scope
- Operation, maintenance and statutory compliance
- Shift pattern
- General shift plus on-call
- Manpower
- Engineer plus 6 operators
- Line patrolling
- Monthly foot patrol
Lead time Baseline condition audit first · Warranty As per contract · MOQ 1 month
Battery cells & modules (LFP, NMC, sodium-ion)Pallavaswarna4 variants
SampleBattery cells & modules (LFP, NMC, sodium-ion) Pallavaswarna · PAL-932 series
- Cell capacity
- 3.2 V 50 Ah to 3.2 V 280 Ah (see variants)
- Chemistry
- Sodium-ion
- Format
- Cylindrical
- Nominal voltage
- 3.1 V
- Energy density
- 110-140 Wh/kg
Lead time 2-4 weeks · Warranty 36 months · MOQ 1 nos
Covered conductors & LT spacersTamraline3 variants
SampleCovered conductors & LT spacers Tamraline · TAM-E27 series
- Conductor size
- 150 mm2 to 240 mm2 (see variants)
- Voltage
- LT 1.1 kV
- Conductor
- AAAC
- Insulation
- HDPE
- Layers
- Single
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 km
OT cybersecurity (IEC 62443)Betwajyoti5 variants
SampleOT cybersecurity (IEC 62443) Betwajyoti · BET-6C2 series
- Assets monitored
- Up to 50 assets to Up to 20,000 assets (see variants)
- Deployment
- Passive sensor + central
- Protocol DPI
- OPC UA
- Functions
- Asset inventory, anomaly detection, CVE mapping
- Alerting
- Email
Lead time 4-6 weeks · Warranty 12 months support · MOQ 2 licence
VFDs & soft startersKalingasarvam3 variants
SampleVFDs & soft starters Kalingasarvam · KAL-268 series
- Rating
- 37 kW to 132 kW (see variants)
- Input voltage
- 3-ph 415 V ±10%
- Control mode
- V/f
- Overload
- 110% 60 s (variable torque)
- Protection class
- IP20
Lead time 3-5 weeks · Warranty 24 months from supply · MOQ 5 nos
Solar cells, wafers & ingotsDoabasamarth5 variants
SampleSolar cells, wafers & ingots Doabasamarth · DOA-8E6 series
- Format
- M6 166 mm to G12 half-cell (see variants)
- Cell type
- TOPCon
- Cell efficiency
- 22.8%
- Wafer thickness
- 150 micron
- Conductivity type
- P-type boron
Lead time 4-8 weeks · Warranty As per supply agreement · MOQ 1 nos
Factory acceptance test (FAT) witnessingShaktimark6 variants
SampleServiceFactory acceptance test (FAT) witnessing Shaktimark · SHA-D82 series
- Equipment value
- INR 25 lakh to INR 25 crore (see variants)
- Test plan
- Client approved FAT protocol
- Tests witnessed
- Routine tests per IS or IEC
- Team
- Specialist engineers per discipline
- Location
- International factory
Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day
Design & simulation softwareSabarmatisamarth4 variants
SampleDesign & simulation software Sabarmatisamarth · SAB-B42 series
- Edition
- Professional single user to Enterprise 25 users (see variants)
- Licence model
- Network floating
- Deployment
- Cloud web
- Simulation engines
- Hourly yield
- Weather data
- Site-specific import
Lead time Same day licence key · Warranty Updates and support 12 months · MOQ 2 licence
First aid & emergency showersTrishulsys4 variants
SampleFirst aid & emergency showers Trishulsys · TRI-4F3 series
- Type / size
- Kit for 50 persons to Shower with tank and heater (see variants)
- Cabinet material
- ABS plastic
- Contents
- Dressings, burn gel, antiseptics, splints
- Eye wash flow
- 11.4 L/min for 15 min
- Shower flow
- 75 L/min
Lead time 3-4 weeks · Warranty 24 months · MOQ 10 nos
Trench coversVajraline3 variants
Vajraline · VAJ-CF4 series
- Cover size (L x W)
- 750 x 500 mm to 1000 x 750 mm (see variants)
- Material
- Mild steel chequered plate
- Thickness
- 40 mm
- Load class
- Light vehicle 5 t
- Weight
- 60 kg
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 5 nos
Surveys (topo, geotech, drone)Sabarmati6 variants
SampleServiceSurveys (topo, geotech, drone) Sabarmati · SAB-627 series
- Survey area
- 25 acres to 1000 acres (see variants)
- Survey method
- Drone LiDAR
- Accuracy
- Horizontal 20 mm, vertical 30 mm
- Deliverables
- Geotech report with bore logs
- Geotech boreholes
- 1 per 10 acres to 15 m depth
Lead time 2-4 weeks · Warranty Re-survey of disputed areas at no cost · MOQ 1 site
Insulation & tan delta testersMaurya3 variants
SampleInsulation & tan delta testers Maurya · MAU-DF2 series
- Maximum test voltage
- 5 kV to 12 kV (see variants)
- Resistance range
- Up to 10 Tohm
- Tests
- IR, PI, DAR
- Display
- LCD
- Power supply
- 230 V AC and battery
Lead time 1-2 weeks · Warranty 24 months with calibration · MOQ 5 nos
ODC & heavy-haul transportGupta5 variants
SampleServiceODC & heavy-haul transport Gupta · GUP-4B5 series
- Consignment weight
- 50 tonnes to 400 tonnes (see variants)
- Equipment
- Low-bed trailer
- Route survey
- Optional
- Escort and permits
- Police and highway permits included
- Insurance
- Carrier liability only
Lead time Permits 7-21 days · Warranty Transit damage claims support · MOQ 1 job
Stringing machinesAwadhanant5 variants
Awadhanant · AWA-061 series
- Maximum tension
- 15 kN to 100 kN (see variants)
- Type
- Puller
- Drive
- Diesel hydraulic
- Bullwheel diameter
- 1500 mm
- Conductor size
- ACSR Panther
Lead time 10-14 weeks · Warranty 12 months from commissioning · MOQ 10 nos
Fuel-gas conditioning & pressure-reducing skidsLonavalavajra3 variants
SampleFuel-gas conditioning & pressure-reducing skids Lonavalavajra · LON-F48 series
- Flow capacity
- 1000 Sm3/h to 10000 Sm3/h (see variants)
- Inlet pressure
- 25-100 bar
- Outlet pressure
- 30 bar
- Pressure regulation
- Active-monitor redundant
- Filtration
- Cartridge filter
Lead time 10-14 weeks · Warranty 12 months · MOQ 10 nos
Ties, markers & clampsCoorgkavach6 variants
SampleTies, markers & clamps Coorgkavach · COO-995 series
- Size
- 100 x 2.5 mm to 450 x 9 mm (see variants)
- Material
- Stainless steel 316
- Pack quantity
- 100 pcs
- Colour
- Blue
- Tensile strength
- 18 kg
Lead time 2-3 weeks · Warranty As per manufacturer · MOQ 5 pack
Flue-gas desulphurisation (FGD)Hertzline6 variants
SampleFlue-gas desulphurisation (FGD) Hertzline · HER-059 series
- Boiler size
- 25 MW to 500 MW (see variants)
- Technology
- Semi-dry
- SO2 removal efficiency
- 80%
- Inlet SO2
- Up to 2500 mg/Nm3
- Absorber material
- Alloy lined
Lead time 24-36 weeks · Warranty 12 months from commissioning · MOQ 5 set
Lattice towers & monopolesKonkangrid5 variants
SampleLattice towers & monopoles Konkangrid · KON-525 series
- Voltage class
- 11 kV to 220 kV (see variants)
- Type
- Monopole
- Circuit
- Double
- Tower type
- B 2-deg angle
- Height
- 13 m
Lead time 8-12 weeks · Warranty 12 months · MOQ 1 MT