Control & instrumentation cablesOjassys6 variants
SampleControl & instrumentation cables Ojassys · OJA-687 series
- Cores
- 4C x 1.5 sq mm to 37C x 2.5 sq mm (see variants)
- Conductor
- Annealed copper class 2
- Insulation
- FRLS PVC
- Armour
- Galvanised steel wire
- Screen
- Overall copper tape
Lead time 1-2 weeks · Warranty As per contract · MOQ 2 m
Solar street lightsMysorespark5 variants
SampleSolar street lights Mysorespark · MYS-A96 series
- Wattage
- 18 W to 60 W (see variants)
- Battery
- LiFePO4
- Battery capacity
- 12.8 V 12 Ah
- Solar panel
- Mono PERC 100 Wp
- Controller
- PWM
Lead time 4-5 weeks · Warranty 60 months on LED and panel · MOQ 1 set
Power system studies (load flow, short circuit, grid code)Indraprasthajyoti6 variants
SampleServicePower system studies (load flow, short circuit, grid code) Indraprasthajyoti · IND-4C7 series
- Network scale
- 11 kV plant to 400 kV system (see variants)
- Study type
- Dynamic and transient
- Software
- ETAP
- Model data
- Client single line diagram and data
- Deliverables
- Study report with results
Lead time 2-6 weeks · Warranty Clarifications to utility at no cost · MOQ 1 report
SFRA, winding resistance & turns-ratio testersCoromandel6 variants
SampleSFRA, winding resistance & turns-ratio testers Coromandel · COR-366 series
- Test current / range
- 1 A winding resistance to SFRA 20 Hz-2 MHz (see variants)
- Instrument
- SFRA
- Accuracy
- 0.1%
- Frequency range
- 20 Hz to 2 MHz
- Dynamic range
- Over 100 dB
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 10 nos
Traction SCADALumengen4 variants
Lumengen · LUM-D77 series
- Control posts
- Up to 10 posts to Up to 100 posts (see variants)
- Architecture
- Redundant server
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 61850
Lead time 12-16 weeks · Warranty 24 months · MOQ 1 lot
Wind resource assessment (met masts, LiDAR, SoDAR)Shakticore6 variants
SampleWind resource assessment (met masts, LiDAR, SoDAR) Shakticore · SHA-EA7 series
- Measurement height
- 50 m to 200 m (see variants)
- Instrument type
- SoDAR
- Mast construction
- Lattice
- Sensors
- Cup anemometer, vane, T/RH, pressure
- Number of levels
- 10
Lead time 8-12 weeks · Warranty 24 months on logger and sensors · MOQ 1 set
Earthing & auxiliary transformersChambal6 variants
SampleEarthing & auxiliary transformers Chambal · CHA-A82 series
- Rating
- 50 kVA to 1600 kVA (see variants)
- Type
- Station service
- Primary voltage
- 33 kV
- Secondary voltage
- 3.3 kV
- Short-time rating
- 10 s
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Switches, sockets & modular platesDeccan6 variants
SampleSwitches, sockets & modular plates Deccan · DEC-AA6 series
- Module
- 1M to 8M (see variants)
- Item
- Fan regulator
- Current rating
- 25 A
- Rated voltage
- 240 V AC
- Switch type
- Two-way
Lead time 1-2 weeks · Warranty 12 months from supply · MOQ 1 nos
Pole hardware, stays & cross-armsIndraprastha6 variants
SamplePole hardware, stays & cross-arms Indraprastha · IND-EC2 series
- Size
- 75x40 mm to 200x100 mm (see variants)
- Hardware item
- Cross-arm
- Material
- High tensile steel
- Section
- Flat
- Length
- 2.4 m
Lead time 4-5 weeks · Warranty As per discom specification · MOQ 10 nos
Ester oils (natural & synthetic)Satpura4 variants
SampleEster oils (natural & synthetic) Satpura · SAT-C46 series
- Pack size
- 210 litre drum to Bulk 20000 litre (see variants)
- Type
- Synthetic ester
- Flash point
- Min 250 deg C
- Fire point
- Min 340 deg C
- Viscosity at 40 deg C
- Max 29 cSt
Lead time 3-4 weeks · Warranty 12 months in sealed container · MOQ 10 litre
Lattice towers & monopolesKonark5 variants
SampleLattice towers & monopoles Konark · KON-CD1 series
- Voltage class
- 11 kV to 220 kV (see variants)
- Type
- Lattice
- Circuit
- Single
- Tower type
- A suspension
- Height
- 60 m
Lead time 14-20 weeks · Warranty As per contract · MOQ 2 MT
Dry-type transformersEllora5 variants
SampleDry-type transformers Ellora · ELL-0E3 series
- Rating
- 100 kVA to 1600 kVA (see variants)
- Voltage ratio
- 22/0.433 kV
- Technology
- VPI
- Insulation class
- Class H
- Cooling
- AN
Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos
Partial discharge & VLF testersDeccan4 variants
SamplePartial discharge & VLF testers Deccan · DEC-596 series
- Test voltage (VLF peak)
- 50 kV to 90 kV (see variants)
- Test frequency
- 0.1 Hz
- Waveform
- Sinusoidal
- Max load capacitance
- 0.5 microF
- PD sensitivity
- Below 5 pC
Lead time 8-14 weeks · Warranty 12 months from supply · MOQ 2 set
Data loggersBeas4 variants
Beas · BEA-CF1 series
- Channels
- 8 channels to 64 channels (see variants)
- Input types
- 4-20 mA
- Resolution
- 24-bit
- Sampling rate
- 100 ms min
- Memory
- 32 GB
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 10 nos
Solar cells, wafers & ingotsSatpura6 variants
SampleSolar cells, wafers & ingots Satpura · SAT-8E3 series
- Format
- M6 166 mm to Wafer 182 mm (see variants)
- Cell type
- TOPCon
- Cell efficiency
- 25.5%
- Wafer thickness
- 150 micron
- Conductivity type
- N-type phosphorus
Lead time 2-3 weeks · Warranty 6 months from supply · MOQ 1 nos
Wind resource assessment (met masts, LiDAR, SoDAR)Kavachtron5 variants
SampleWind resource assessment (met masts, LiDAR, SoDAR) Kavachtron · KAV-C12 series
- Measurement height
- 50 m to 140 m (see variants)
- Instrument type
- Met mast
- Mast construction
- Tubular guyed
- Sensors
- Cup anemometer, vane, T/RH, pressure
- Number of levels
- 3
Lead time 8-12 weeks · Warranty 24 months on logger and sensors · MOQ 1 set
Protective coatings & wrapsNalanda5 variants
SampleProtective coatings & wraps Nalanda · NAL-A44 series
- Pack size
- 1 litre to 50 litre (see variants)
- Coating type
- Zinc rich
- Number of packs
- Single pack
- Dry film thickness
- 150 micron
- Solid by volume
- 55%
Lead time 1-2 weeks · Warranty 10 years coating life as per system · MOQ 1 litre
High-mast & flood lightsAgnimark3 variants
SampleHigh-mast & flood lights Agnimark · AGN-869 series
- Wattage
- 400 W to 1000 W (see variants)
- Luminous efficacy
- 130 lm/W
- Beam angle
- 120 deg
- Colour temperature
- 6500 K
- CRI
- Above 70
Lead time 2-3 weeks · Warranty 60 months from supply · MOQ 1 nos
CT/PT & transformer analysersHoysala5 variants
SampleCT/PT & transformer analysers Hoysala · HOY-DA1 series
- Test channels / output
- Single channel 2 kV to Multi-function 30 A (see variants)
- Tests
- Ratio, polarity, burden
- Class tested
- Class 0.2 to 5P
- Output current
- 0-100 A
- Output voltage
- 0-2000 V
Lead time 6-8 weeks · Warranty 12 months from supply · MOQ 1 nos
Disturbance recorders & PMUsDwaraka5 variants
SampleDisturbance recorders & PMUs Dwaraka · DWA-C89 series
- Channels
- 8 analog to 96 analog (see variants)
- Sampling rate
- 10 kHz
- Time sync
- IRIG-B
- Accuracy
- 0.1% FS
- Reporting rate
- 50 fps
Lead time 6-8 weeks · Warranty 24 months · MOQ 1 nos
Demand responsePushpakmax3 variants
SampleServiceDemand response Pushpakmax · PUS-ED8 series
- Curtailable load
- 10 MW to 50 MW (see variants)
- Programme
- Aggregator DR
- Control
- Manual
- Notice
- Day ahead
- Duration per event
- 4 hours
Lead time Assessment in 2-3 weeks · Warranty As per programme terms · MOQ 1 MW
Detuned & series reactorsMahanadi5 variants
SampleDetuned & series reactors Mahanadi · MAH-D75 series
- Rating
- 10 kVAr to 200 kVAr (see variants)
- Detuning factor
- 14% (134 Hz)
- Rated voltage
- 440 V
- Core
- Air core
- Winding
- Aluminium
Lead time 2-3 weeks · Warranty 12 months from commissioning · MOQ 1 nos
Solar thermal collectors & water heatersAwadhsudarshan4 variants
SampleSolar thermal collectors & water heaters Awadhsudarshan · AWA-758 series
- Capacity
- 100 LPD to 500 LPD (see variants)
- Collector type
- Heat pipe ETC
- Tank material
- SS 316
- Tank insulation
- PUF 50 mm
- System type
- Forced circulation
Lead time 1-2 weeks · Warranty 2 years on system · MOQ 5 nos
Steel structuresKaverigrid6 variants
Kaverigrid · KAV-8E6 series
- Structure weight class
- 0.5 MT lot to 25 MT lot (see variants)
- Material grade
- IS 2062 E350 BR
- Galvanising coating
- 610 g/sq m
- Section type
- Tubular
- Bolt grade
- 8.8
Lead time 5-7 weeks · Warranty 24 months against coating failure · MOQ 2 MT