Technical, legal & financial due diligenceMunnar4 variants
SampleServiceTechnical, legal & financial due diligence Munnar · MUN-D76 series
- Portfolio size
- 100 MW to 1 GW (see variants)
- Scope
- Integrated technical, legal and financial
- Site visit
- All sites above 10 MW
- Legal items
- Litigation and compliance check
- Financial items
- Debt and covenant review
Lead time Kick-off in 1 week · Warranty Clarifications until deal closing · MOQ 1 report
Testing & commissioningVindhyatarang4 variants
SampleServiceTesting & commissioning Vindhyatarang · VIN-A83 series
- Plant capacity
- 1 MW to 25 MW (see variants)
- Tests covered
- Transformer, switchgear, relay tests
- Instruments
- Relay test set, thermal camera
- Calibration
- NABL traceable certificates
- Team
- Commissioning engineer plus 2 testers
Lead time Report in 7 days · Warranty Retest at no cost if failure traced to test error · MOQ 1 MW
Type & routine testing laboratories (NABL)Maduraisurya5 variants
SampleServiceType & routine testing laboratories (NABL) Maduraisurya · MAD-416 series
- Test class
- Special test to Short-circuit test (see variants)
- Equipment under test
- Switchgear
- Accreditation
- NABL ISO/IEC 17025
- Rating range
- Up to 400 kV
- Test standard
- Customer specific test plan
Lead time Slot in 1-2 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Port & marine handlingTaxilaswarna6 variants
SampleServicePort & marine handling Taxilaswarna · TAX-847 series
- Cargo weight
- 50 tonnes to 5000 tonnes (see variants)
- Cargo type
- Wind turbine blades and towers
- Handling
- Mobile harbour crane
- Port coverage
- West coast
- Survey
- Lashing and discharge supervision
Lead time Planning 2-3 weeks · Warranty Handling damage claims support · MOQ 1 lot
Live-line & hot-line washingTungabhadra5 variants
SampleServiceLive-line & hot-line washing Tungabhadra · TUN-E78 series
- Voltage level
- 33 kV to 400 kV (see variants)
- Method
- Dry ice blasting
- Resistivity of water
- Demineralised water
- Scope
- Per km of line
- Frequency
- Quarterly in coastal areas
Lead time Permit based scheduling · Warranty As per contract · MOQ 1 job
Type & routine testing laboratories (NABL)Shaktimark5 variants
SampleServiceType & routine testing laboratories (NABL) Shaktimark · SHA-FB8 series
- Test class
- Acceptance test to Type test (HV) (see variants)
- Equipment under test
- Power transformers
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 33 kV
- Test standard
- IS or IEC as specified
Lead time Slot in 1-2 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Transformer overhaul & oil filtrationKaveriohm4 variants
SampleServiceTransformer overhaul & oil filtration Kaveriohm · KAV-619 series
- Transformer rating
- 5 MVA to 50 MVA (see variants)
- Service
- Full overhaul with rewinding
- Filtration machine
- Mobile 12000 L/hr
- Oil BDV target
- Above 60 kV
- Moisture target
- Below 10 ppm
Lead time Mobilisation in 3-5 days · Warranty Oil quality guarantee 6 months · MOQ 1 nos
Open-access approvalsLonavalaprabha6 variants
SampleServiceOpen-access approvals Lonavalaprabha · LON-BB7 series
- Contract demand
- 1 MW to 100 MW (see variants)
- Access type
- Short term
- Scope
- Agreement drafting and execution
- Approvals
- SLDC
- Charges analysis
- Landed cost workings
Lead time Approval in 15-90 days · Warranty Rework for deficient applications · MOQ 1 application
Procurement & sourcing servicesKalinga4 variants
SampleServiceProcurement & sourcing services Kalinga · KAL-F34 series
- Procurement value
- INR 5 crore to INR 100 crore (see variants)
- Scope
- Full procurement cycle
- Category
- Wind components
- Vendor audit
- Factory audit
- Fee model
- Percentage of purchase value
Lead time Kick-off in 3-5 days · Warranty Vendor performance follow-up · MOQ 1 lot
Engineering & designKalingaamrit3 variants
SampleServiceEngineering & design Kalingaamrit · KAL-009 series
- Plant capacity
- 50 MW to 250 MW (see variants)
- Deliverables
- Full IFC drawing set with calculations
- Design software
- PVsyst, AutoCAD, ETAP
- Team
- Electrical, civil and SCADA discipline leads
- Turnaround
- 3-4 weeks
Lead time 3-4 weeks · Warranty Design correction at no cost for 12 months · MOQ 1 job
Testing & commissioningMysorevidyut3 variants
SampleServiceTesting & commissioning Mysorevidyut · MYS-9A9 series
- Plant capacity
- 10 MW to 50 MW (see variants)
- Tests covered
- Full plant functional and PR test
- Instruments
- Relay test set, thermal camera
- Calibration
- NABL traceable certificates
- Team
- Commissioning engineer plus 2 testers
Lead time Report in 7 days · Warranty As per contract · MOQ 1 MW
Open-access approvalsPennarlumen3 variants
SampleServiceOpen-access approvals Pennarlumen · PEN-BB6 series
- Contract demand
- 10 MW to 50 MW (see variants)
- Access type
- Green energy open access
- Scope
- Application and follow-up
- Approvals
- SLDC
- Charges analysis
- Wheeling, CSS and additional surcharge
Lead time Filing in 1 week · Warranty As per contract · MOQ 1 application
Packing & cratingRavi4 variants
SampleServicePacking & crating Ravi · RAV-916 series
- Packing volume
- 50 CBM to 500 CBM (see variants)
- Material
- ISPM-15 treated timber
- Protection
- Shock absorption foam
- Marking
- Handling symbols, tags
- Packing list
- Digital photo record
Lead time Packing in 3-5 days · Warranty Packing damage replacement · MOQ 1 lot
Freight forwarding & customs clearanceKalinga5 variants
SampleServiceFreight forwarding & customs clearance Kalinga · KAL-C79 series
- Shipment size
- 1 CBM to Multiple containers (see variants)
- Mode
- Multimodal
- Customs services
- Duty planning and classification
- Incoterm
- CIF
- Permits
- Solar and EPCG benefits
Lead time Booking in 2-3 days · Warranty As per freight terms · MOQ 1 lot
Right of way (RoW) & compensationArcmark5 variants
SampleServiceRight of way (RoW) & compensation Arcmark · ARC-E42 series
- Line length
- 5 km to 100 km (see variants)
- Scope
- Survey and valuation
- Compensation basis
- Market value assessment
- Records
- Photographic evidence
- Grievance handling
- Field team
Lead time Mobilisation in 2-3 weeks · Warranty As per contract · MOQ 1 km
Substation & line O&MMahanadiparam3 variants
SampleServiceSubstation & line O&M Mahanadiparam · MAH-058 series
- Voltage level
- 11 kV to 66 kV (see variants)
- Scope
- Operation and maintenance
- Shift pattern
- 3 shifts, 24x7
- Manpower
- Engineer plus 6 operators
- Line patrolling
- Monthly foot patrol
Lead time Baseline condition audit first · Warranty As per contract · MOQ 1 month
Warehousing & yard managementShivalik3 variants
SampleServiceWarehousing & yard management Shivalik · SHI-407 series
- Storage area
- 2500 sq m to 10000 sq m (see variants)
- Storage type
- Bonded
- Handling equipment
- Heavy cranes up to 100 tonnes
- Security
- 24x7 guards and CCTV
- Inventory system
- WMS with barcode
Lead time Setup in 2 weeks · Warranty Insurance cover · MOQ 1 month
Electrical safety auditsMalwavolt5 variants
SampleServiceElectrical safety audits Malwavolt · MAL-2D4 series
- Installed load
- 1 MVA to 50 MVA (see variants)
- Scope
- Audit with arc-flash study
- Auditor
- CEA-licensed engineer
- Measurements
- Earth resistance, insulation
- Report
- Action plan with timeline
Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Training & certification (electrical licence, work at height)Kalinga3 variants
SampleServiceTraining & certification (electrical licence, work at height) Kalinga · KAL-274 series
- Course duration
- 5 days to 30 days (see variants)
- Programme
- Fire safety
- Mode
- On-site
- Batch size
- 12 participants
- Certification
- Skill council NSQF aligned
Lead time Next batch in 2-4 weeks · Warranty Re-training for missed sessions · MOQ 1 nos
Training & certification (electrical licence, work at height)Magadhflux3 variants
SampleServiceTraining & certification (electrical licence, work at height) Magadhflux · MAG-E26 series
- Course duration
- 5 days to 30 days (see variants)
- Programme
- Substation operator
- Mode
- Hybrid
- Batch size
- 12 participants
- Certification
- Skill council NSQF aligned
Lead time On-site within 2 weeks · Warranty Re-attempt of assessment at no cost · MOQ 1 nos
Site acceptance & pre-commissioning testsKaveridhruv5 variants
SampleServiceSite acceptance & pre-commissioning tests Kaveridhruv · KAV-C65 series
- Plant size
- 1 MW to 50 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Relay test set, IV tracer, CRM
- Test sequence
- Per client approved format
- Team
- Test engineer plus 2 technicians
Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site
Site acceptance & pre-commissioning testsRajatcore6 variants
SampleServiceSite acceptance & pre-commissioning tests Rajatcore · RAJ-C95 series
- Plant size
- 1 MW to 100 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Test engineer plus 2 technicians
Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site
Substation constructionKakatiyasetu4 variants
SampleServiceSubstation construction Kakatiyasetu · KAK-DC6 series
- Voltage class
- 66 kV to 400 kV (see variants)
- Type
- Outdoor AIS
- Scope
- Full turnkey
- Transformers
- Up to 50 MVA
- Earthing
- Copper-bonded rods
Lead time Engineering in 4-6 weeks · Warranty Defect liability 24 months · MOQ 1 bay
Cabling, trenching & HDD worksEllorakavach5 variants
SampleServiceCabling, trenching & HDD works Ellorakavach · ELL-C87 series
- Cable route length
- 2 km to 50 km (see variants)
- Method
- Open trench
- HDD capacity
- Up to 250 mm bore
- Trench depth
- 1.5 m
- Cable type
- 11/33 kV XLPE
Lead time Mobilisation in 7 days · Warranty Restoration warranty 6 months · MOQ 1 km