Training & certification (electrical licence, work at height)Gupta3 variants
SampleServiceTraining & certification (electrical licence, work at height) Gupta · GUP-302 series
- Course duration
- 10 days to 3 months (see variants)
- Programme
- Substation operator
- Mode
- Hybrid
- Batch size
- 30 participants
- Certification
- Training completion certificate
Lead time On-site within 2 weeks · Warranty Re-attempt of assessment at no cost · MOQ 1 nos
ODC & heavy-haul transportMysorevidyut5 variants
SampleServiceODC & heavy-haul transport Mysorevidyut · MYS-8F5 series
- Consignment weight
- 50 tonnes to 400 tonnes (see variants)
- Equipment
- Hydraulic multi-axle
- Route survey
- Optional
- Escort and permits
- Police and highway permits included
- Insurance
- Marine-cum-road transit insurance
Lead time Dispatch in 5-10 days · Warranty Carrier liability as per law · MOQ 1 job
Freight forwarding & customs clearanceVidyuttron6 variants
SampleServiceFreight forwarding & customs clearance Vidyuttron · VID-C72 series
- Shipment size
- 1 CBM to Project cargo (see variants)
- Mode
- Sea FCL
- Customs services
- Duty planning and classification
- Incoterm
- CIF
- Permits
- Solar and EPCG benefits
Lead time Delivery 1-6 weeks · Warranty As per freight terms · MOQ 1 lot
Engineering & designMahanadiparam4 variants
SampleServiceEngineering & design Mahanadiparam · MAH-CE9 series
- Plant capacity
- 25 MW to 250 MW (see variants)
- Deliverables
- GA drawings, SLD, BoQ
- Design software
- PVsyst, AutoCAD, ETAP
- Team
- Lead engineer plus 3 designers
- Turnaround
- 6-8 weeks
Lead time 6-10 weeks · Warranty Design correction at no cost for 12 months · MOQ 1 job
Simulators & e-learningTaxilaswarna6 variants
SampleServiceSimulators & e-learning Taxilaswarna · TAX-7E5 series
- Licensed users
- 10 users to 500 users (see variants)
- Product type
- Web LMS
- Content
- Safety scenarios
- Languages
- English
- Assessment
- Certificate on completion
Lead time Deployment in 2-3 weeks · Warranty Bug fixes at no cost · MOQ 1 nos
Product certification (BIS, IEC, ALMM)Kamrup3 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Kamrup · KAM-469 series
- Certification scope
- Single product BIS to ALMM List-I (see variants)
- Standards covered
- IEC 61215 and 61730
- Application support
- Documentation and filing
- Test lab liaison
- Notified bodies
- Factory audit
- BIS inspection support
Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Site acceptance & pre-commissioning testsVidyutline3 variants
SampleServiceSite acceptance & pre-commissioning tests Vidyutline · VID-C99 series
- Plant size
- 25 MW to 100 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Insulation tester, earth tester
- Test sequence
- Visual, mechanical, electrical
- Team
- Team of 6 with lead
Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site
Feasibility studies & DPRRavinandi4 variants
SampleServiceFeasibility studies & DPR Ravinandi · RAV-CD9 series
- Project capacity
- 50 MW to 1 GW (see variants)
- Scope
- Pre-feasibility
- Energy yield
- PVsyst P50/P90
- Financial model
- Project IRR, equity IRR, DSCR
- Grid assessment
- Nearest substation capacity check
Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 report
Feasibility studies & DPRVidyutline5 variants
SampleServiceFeasibility studies & DPR Vidyutline · VID-D51 series
- Project capacity
- 10 MW to 1 GW (see variants)
- Scope
- Feasibility with financial model
- Energy yield
- WAsP wind energy assessment
- Financial model
- Sensitivity and tariff analysis
- Grid assessment
- GNA/connectivity route study
Lead time Kick-off in 1 week · Warranty Clarification support for 6 months · MOQ 1 report
Third-party inspection (TPI)Lonavala5 variants
SampleServiceThird-party inspection (TPI) Lonavala · LON-963 series
- Inspection effort
- 1 man-day to 50 man-days (see variants)
- Equipment inspected
- Towers and structures
- Inspection stage
- Final pre-dispatch
- Standards used
- Per approved QAP
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Open-access approvalsWayanad4 variants
SampleServiceOpen-access approvals Wayanad · WAY-354 series
- Contract demand
- 10 MW to 100 MW (see variants)
- Access type
- Long term
- Scope
- Agreement drafting and execution
- Approvals
- SLDC
- Charges analysis
- Wheeling, CSS and additional surcharge
Lead time Approval in 15-90 days · Warranty As per contract · MOQ 1 application
EIA, ESG & environmental studiesTaptideep4 variants
SampleServiceEIA, ESG & environmental studies Taptideep · TAP-8B1 series
- Project scale
- Under 25 MW to 250 MW (see variants)
- Study
- Rapid EIA
- Baseline season
- One season
- Deliverables
- Final EIA with approvals
- Lab testing
- NABL accredited lab
Lead time 8-12 weeks, longer with seasonal baseline · Warranty As per contract · MOQ 1 report
Electrical safety auditsDwaraka5 variants
SampleServiceElectrical safety audits Dwaraka · DWA-882 series
- Installed load
- 1 MVA to 50 MVA (see variants)
- Scope
- Visual and documentation audit
- Auditor
- CEA-licensed engineer
- Measurements
- Thermography and power quality
- Report
- Action plan with timeline
Lead time Report in 7-14 days · Warranty Re-audit at reduced rate · MOQ 1 site
Installation & erectionArcmark6 variants
SampleServiceInstallation & erection Arcmark · ARC-C48 series
- Installation scope
- 1 MW to 100 MW (see variants)
- Scope
- Complete mechanical and electrical erection
- Manpower deployed
- 60 technicians plus supervisors
- Supervision
- Site engineer and safety officer
- Equipment
- Own cranes and erection tools
Lead time Phased by block · Warranty Defect liability 24 months · MOQ 1 MW
Contract engineersAjanta6 variants
SampleServiceContract engineers Ajanta · AJA-C53 series
- Engineers deployed
- 1 engineer to 50 engineers (see variants)
- Discipline
- Mechanical
- Experience
- 5-10 years
- Qualification
- B.E./B.Tech
- Engagement
- Offsite design hub
Lead time Profiles in 3 days · Warranty As per contract · MOQ 1 man-month
Project management (PMC) & owner's engineerNilgiri3 variants
SampleServiceProject management (PMC) & owner's engineer Nilgiri · NIL-C05 series
- Project size
- 25 MW to 100 MW (see variants)
- Scope
- Owner's engineer through COD
- Team on site
- PM, 3 engineers, QA/QC inspector
- Schedule control
- MS Project weekly
- Reporting
- Monthly dashboard for lenders
Lead time Deployment in 2 weeks · Warranty As per contract · MOQ 1 month
Grid connectivity & GNA applicationsWayanad6 variants
SampleServiceGrid connectivity & GNA applications Wayanad · WAY-F34 series
- Capacity applied
- 10 MW to 1000 MW (see variants)
- Application
- Connectivity
- Scope
- Document preparation and filing
- Bank guarantee
- Arranged by client
- Studies
- Grid impact summary
Lead time Grant 3-9 months · Warranty As per contract · MOQ 1 application
Recruitment servicesSabarmati6 variants
SampleServiceRecruitment services Sabarmati · SAB-315 series
- Role seniority
- Technician to General manager (see variants)
- Fee basis
- Fixed fee per hire
- Search
- Database and referrals
- Screening
- Assessment centre
- Verification
- Education and employment check
Lead time Closure in 30-60 days · Warranty Replacement within 3 months · MOQ 1 case
Right of way (RoW) & compensationMahanadi5 variants
SampleServiceRight of way (RoW) & compensation Mahanadi · MAH-B28 series
- Line length
- 5 km to 100 km (see variants)
- Scope
- Full RoW clearance
- Compensation basis
- Per state rate notifications
- Records
- Photographic evidence
- Grievance handling
- Dedicated desk
Lead time 3-12 months · Warranty As per contract · MOQ 1 km
Wind turbine O&MKutch6 variants
SampleServiceWind turbine O&M Kutch · KUT-1B9 series
- Fleet size
- 5 turbines to 150 turbines (see variants)
- Scope
- Comprehensive including spares
- Turbine class
- Up to 1.5 MW
- Availability guarantee
- 95% machine availability
- Technician team
- Site manager plus 2 technicians per 5 turbines
Lead time Takeover in 4-6 weeks · Warranty Availability guarantee with LD · MOQ 1 nos
Substation & line O&MShaktitek5 variants
SampleServiceSubstation & line O&M Shaktitek · SHA-727 series
- Voltage level
- 33 kV to 400 kV (see variants)
- Scope
- Operation, maintenance and statutory compliance
- Shift pattern
- 3 shifts, 24x7
- Manpower
- Engineer plus 6 operators
- Line patrolling
- Monthly foot patrol
Lead time Baseline condition audit first · Warranty Service credits for avoidable outages · MOQ 1 month
Simulators & e-learningKrishna3 variants
SampleServiceSimulators & e-learning Krishna · KRI-6A3 series
- Licensed users
- 10 users to 50 users (see variants)
- Product type
- VR headset based
- Content
- Substation switching and faults
- Languages
- English
- Assessment
- Certificate on completion
Lead time Custom content 8-12 weeks · Warranty Software updates for licence term · MOQ 1 nos
Procurement & sourcing servicesJhelum5 variants
SampleServiceProcurement & sourcing services Jhelum · JHE-285 series
- Procurement value
- INR 1 crore to INR 100 crore (see variants)
- Scope
- Tender and negotiation
- Category
- Civil materials
- Vendor audit
- Factory audit
- Fee model
- Percentage of purchase value
Lead time Kick-off in 3-5 days · Warranty Vendor performance follow-up · MOQ 1 lot
Simulators & e-learningNilgiri4 variants
SampleServiceSimulators & e-learning Nilgiri · NIL-324 series
- Licensed users
- 10 users to 100 users (see variants)
- Product type
- Web LMS
- Content
- Substation switching and faults
- Languages
- English and Hindi
- Assessment
- Quizzes and scored simulations
Lead time Deployment in 2-3 weeks · Warranty Bug fixes at no cost · MOQ 1 nos