Catalogue

Every product and service of the power sector, arranged in technical and professional groups. Listed by verified manufacturers and merchants; every order and GST invoice goes through BARREL.

13 groups · 59 categories · 435 sub-categories

Listings (15,240)

Prices are shown to verified buyers. Register your company to see them and request quotes.

Composite bus support, Flex 4 series

SampleBus post insulators & clamps

Malabarojas · MAL-D74 series

System voltage
72.5 kV to 245 kV (see variants)
Type
Pillar insulator
Cantilever strength
6 kN
Creepage
31 mm/kV
Material
Porcelain

Lead time 6-8 weeks · Warranty 24 months · MOQ 1 nos

Price for verified buyers

by Malabarojas HV Switchgear (Sample) · invoiced by BARREL

Request quote

Haber-Bosch ammonia synthesis loop, Neo series

SampleAmmonia & methanol synthesis equipment

Arctron · ARC-951 series

Production capacity
20 TPD to 300 TPD (see variants)
Product
Ammonia
Synthesis pressure
100-150 bar
Reactor temperature
220-260 deg C
Catalyst
Cu/ZnO/Al2O3

Lead time 30-40 weeks · Warranty 24 months from commissioning · MOQ 2 lot

Price on quote

by Arctron New Energy (Sample) · invoiced by BARREL

Request quote

Brahmaputraagni · BRA-478 series

Plant capacity
Up to 10 MW to Portfolio > 500 MW (see variants)
Forecast horizon
7-day
Resolution
15-minute blocks
Update frequency
Hourly
Method
Satellite cloud-motion

Lead time 3-4 weeks onboarding · Warranty Service level as per agreement · MOQ 1 month

Price for verified buyers

by Brahmaputraagni Software (Sample) · invoiced by BARREL

Request quote

Kamrup · KAM-D07 series

Insertion loss
15 dB to 40 dB (see variants)
Equipment served
Fan
Panel construction
GI perforated with rockwool
Infill
Rockwool 100 mm
Sheet thickness
2.0 mm

Lead time 3-4 weeks · Warranty 24 months against corrosion · MOQ 1 nos

Price for verified buyers

by Kamrup Emission Systems (Sample) · invoiced by BARREL

Request quote

Bay control unit, Prime series

SampleBay control units & gateways

Ujjayinisetu · UJJ-9C3 series

I/O capacity
16 DI / 8 DO to 64 DI / 32 DO (see variants)
Analog inputs
8
Protocols south
IEC 61850
Protocols north
DNP3.0
Interlocking
Bay and station level

Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos

Price for verified buyers

by Ujjayinisetu Protection Systems (Sample) · invoiced by BARREL

Request quote

Low wind speed WTG, Smart series

SampleWind turbine generators

Doaba · DOA-C55 series

Rated power
1.5 MW to 2.5 MW (see variants)
Rotor diameter
140 m
Hub height
80 m
Drive train
Geared
Generator
DFIG

Lead time 6-9 months · Warranty 2 years comprehensive · MOQ 5 nos

Price for verified buyers

by Doaba Wind Energy (Sample) · invoiced by BARREL

Request quote

PPA and wheeling agreement review, Eco series

SampleServiceContract drafting & review

Samarthtek · SAM-F31 series

Contract value
INR 25 lakh to INR 500 crore (see variants)
Document
JV agreement
Scope
Review and mark-up
Governing law
Indian law
Dispute clause
Arbitration in India

Lead time Review in 3-5 days · Warranty Professional indemnity · MOQ 1 job

Price on quote

by Samarthtek Energy Markets (Sample) · invoiced by BARREL

Request quote

Civil and structural stage inspection, Edge series

SampleServiceThird-party inspection (TPI)

Kamrup · KAM-961 series

Inspection effort
10 man-days to 50 man-days (see variants)
Equipment inspected
Towers and structures
Inspection stage
In-process
Standards used
Per approved QAP
Inspector qualification
B.E. Electrical with 8 years experience

Lead time Inspector assigned in 48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day

Price on quote

by Kamrup Projects (Sample) · invoiced by BARREL

Request quote

Satpurapushpak · SAT-DB4 series

Installation scope
25 MW to 200 MW (see variants)
Scope
Complete mechanical and electrical erection
Manpower deployed
25 technicians per MW-block
Supervision
Site engineer and safety officer
Equipment
Pile driver, crane, telehandler

Lead time Phased by block · Warranty Workmanship 12 months · MOQ 1 MW

Price for verified buyers

by Satpurapushpak Projects (Sample) · invoiced by BARREL

Request quote

Substation gateway, Volt 5 series

SampleBay control units & gateways

Chola · CHO-EB6 series

I/O capacity
16 DI / 8 DO to 128 DI / 64 DO (see variants)
Analog inputs
0
Protocols south
IEC 61850
Protocols north
IEC 60870-5-104
Interlocking
Bay and station level

Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos

Price for verified buyers

by Chola Power Controls (Sample) · invoiced by BARREL

Request quote

Haber-Bosch ammonia synthesis loop, Plus 6 series

SampleAmmonia & methanol synthesis equipment

Konkanpushpak · KON-959 series

Production capacity
50 TPD to 300 TPD (see variants)
Product
Methanol
Synthesis pressure
100-150 bar
Reactor temperature
400-500 deg C
Catalyst
Cu/ZnO/Al2O3

Lead time 30-40 weeks · Warranty 24 months from commissioning · MOQ 1 lot

Price for verified buyers

by Konkanpushpak New Energy (Sample) · invoiced by BARREL

Request quote

Mica-taped fire-resistant cable, Neo series

SampleFire-survival & LSZH cables

Konark · KON-771 series

Size
4C x 16 sq mm to 4C x 120 sq mm (see variants)
Fire resistance
Circuit integrity 180 min
Insulation
XLPE
Sheath
FRLS PVC
Conductor
Copper

Lead time 2-3 weeks · Warranty 12 months from supply · MOQ 1 m

Price for verified buyers

by Konark Wires & Cables (Sample) · invoiced by BARREL

Request quote

Mastic sealing compound, Volt 8 series

SampleInsulating tapes & compounds

Suryagen · SUR-603 series

Roll width
25 mm to 100 mm (see variants)
Tape type
Self-amalgamating EPR
Length
33 m
Thickness
0.13 mm
Voltage rating
33 kV

Lead time 3-7 days · Warranty 12 months shelf life · MOQ 1 nos

Price for verified buyers

by Suryagen Consumables (Sample) · invoiced by BARREL

Request quote

Stadium flood luminaire, Smart 3 series

SampleHigh-mast & flood lights

Malabar · MAL-322 series

Wattage
150 W to 300 W (see variants)
Luminous efficacy
150 lm/W
Beam angle
90 deg
Colour temperature
6500 K
CRI
Above 70

Lead time 2-3 weeks · Warranty 36 months from supply · MOQ 5 nos

Price for verified buyers

by Malabar Lights (Sample) · invoiced by BARREL

Request quote

Receivable financing on DISCOM invoices, Edge 7 series

SampleServiceSupply-chain / invoice finance

Doabaampere · DOA-5D4 series

Programme limit
INR 25 lakh to INR 25 crore (see variants)
Structure
Reverse factoring
Advance rate
90% of invoice
Tenor
Up to 90 days
Recourse
Without recourse

Lead time Funding in 24-72 hours after approval · Warranty No hidden fees · MOQ 1 job

Price on quote

by Doabaampere Associates (Sample) · invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited