Catalogue

Every product and service of the power sector, arranged in technical and professional groups. Listed by verified manufacturers and merchants; every order and GST invoice goes through BARREL.

13 groups · 59 categories · 435 sub-categories

Listings (15,240)

Prices are shown to verified buyers. Register your company to see them and request quotes.

Intumescent fire-retardant cable coating, Duo series

SampleFire-rated coatings & penetration seals

Brahmaputra · BRA-567 series

Fire rating
90 min to 180 min (see variants)
Product type
Water-based intumescent coating
Application
Brush or airless spray
Thickness
2 mm DFT
Smoke and toxicity
Low smoke, halogen-free

Lead time 2-3 weeks · Warranty 12 months shelf life · MOQ 1 kg

Price for verified buyers

by Brahmaputra Fire Systems (Sample) · invoiced by BARREL

Request quote

DC capacitor bank, Titan series

SampleInverter & PCS spares

Urjamark · URJ-1C9 series

Inverter rating
100 kW to 1 MW (see variants)
Component
Fan
DC voltage
1000 V
Cooling
Forced air
Fits make
As per inverter nameplate

Lead time 4-8 weeks · Warranty 12 months from supply · MOQ 1 nos

Price for verified buyers

by Urjamark Industrial Supplies (Sample) · invoiced by BARREL

Request quote

Boom placer, Pro 6 series

SampleFor rentConcrete batching & transit mixers

Doaba · DOA-EE7 series

Output capacity
Transit mixer 6 cu m to Batching plant 60 cu m/h (see variants)
Drum capacity
3 cu m
Type
Self loading
Operator
Included
Fuel
Included

Lead time 2-3 days · Warranty Breakdown replacement within 48 h · MOQ 1 nos

Price for verified buyers

by Doaba Machinery Rentals (Sample) · invoiced by BARREL

Request quote

2 V OPzV stationary cell, Pro series

SampleVRLA & tubular batteries

Kiranline · KIR-0B3 series

Capacity
200 Ah to 1000 Ah (see variants)
Nominal voltage
2 V
Technology
Gel VRLA
Discharge rate
C10
Design life
20 years

Lead time 1-2 weeks · Warranty 12 months · MOQ 10 nos

Price for verified buyers

by Kiranline Batteries (Sample) · invoiced by BARREL

Request quote

Catalyst module, Flex series

SampleSCR / SNCR NOx control

Munnarspark · MUN-731 series

Flue gas flow
250000 Nm3/h to 1000000 Nm3/h (see variants)
Technology
Hybrid
NOx removal efficiency
70%
Reagent
Aqueous ammonia
Catalyst
Plate type

Lead time 30-44 weeks · Warranty 24000 operating hours on catalyst · MOQ 10 set

Price for verified buyers

by Munnarspark Emission Systems (Sample) · invoiced by BARREL

Request quote

Ojassys · OJA-999 series

Size
3.5C x 25 sq mm to 3.5C x 300 sq mm (see variants)
Voltage grade
1.1 kV
Conductor
Copper
Insulation
PVC
Armour
Galvanised steel wire

Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 1 m

Price for verified buyers

by Ojassys Cables (Sample) · invoiced by BARREL

Request quote

GNA application with CTUIL, Core 7 series

SampleServiceGrid connectivity & GNA applications

Kakatiyaanant · KAK-B89 series

Capacity applied
10 MW to 250 MW (see variants)
Application
GNA
Scope
Document preparation and filing
Bank guarantee
Arranged through partner bank
Studies
Detailed power system study

Lead time Grant 3-9 months · Warranty Rework of deficient applications · MOQ 1 application

Price for verified buyers

by Kakatiyaanant Engineering Services (Sample) · invoiced by BARREL

Request quote

GST advisory for power projects, Edge series

SampleServiceGST & tax advisory

Sabarmati · SAB-2F4 series

Annual turnover
INR 5 crore to INR 1000 crore (see variants)
Scope
Audit and assessment support
Issues
Works contract GST
Returns
GSTR-1 and 3B
Litigation
Appeals before tribunal

Lead time Start in 1 week · Warranty Professional indemnity · MOQ 1 month

Price for verified buyers

by Sabarmati Corporate Services (Sample) · invoiced by BARREL

Request quote

Tungabhadra · TUN-0A7 series

Voltage level
11 kV to 66 kV (see variants)
Scope
Maintenance only
Shift pattern
General shift plus on-call
Manpower
Engineer plus 6 operators
Line patrolling
Quarterly drone patrol

Lead time Baseline condition audit first · Warranty As per contract · MOQ 1 month

Price on quote

by Tungabhadra Engineering Services (Sample) · invoiced by BARREL

Request quote

PEB with crane gantry, Prime 2 series

SamplePre-engineered buildings (PEB)

Wayanad · WAY-8D4 series

Clear span
12 m to 30 m (see variants)
Primary frame
Hot-rolled section
Steel grade
IS 2062 E350
Roof sheeting
0.5 mm Galvalume
Wall cladding
0.45 mm PPGI

Lead time 8-12 weeks · Warranty 20 years sheet coating (limited) · MOQ 1 sq m

Price for verified buyers

by Wayanad Structures (Sample) · invoiced by BARREL

Request quote

IoT energy monitoring platform, Smart series

SampleBuilding energy management systems (BEMS)

Kiransys · KIR-522 series

Monitored points
250 points to 5000 points (see variants)
Protocols
Modbus, BACnet
Metering
Utility meter integration
Controls
HVAC scheduling
Dashboard
Cloud and on-premises

Lead time Installation 4-12 weeks · Warranty Hardware 12 months · MOQ 1 nos

Price for verified buyers

by Kiransys Associates (Sample) · invoiced by BARREL

Request quote

O-ring and oil seal kit, Ultra series

SampleSilica gel, gaskets & seals

Madurai · MAD-013 series

Pack size
1 kg to 25 kg (see variants)
Product type
Gasket sheet
Bead size
2-5 mm
Moisture adsorption
Min 25% at 25 deg C 80% RH
Colour change
Blue to pink

Lead time 3-7 days · Warranty 24 months shelf life in sealed pack · MOQ 1 kg

Price on quote

by Madurai Oils & Gases (Sample) · invoiced by BARREL

Request quote

Captive power and open access feasibility, Titan series

SampleServiceFeasibility studies & DPR

Deccan · DEC-D54 series

Project capacity
10 MW to 1 GW (see variants)
Scope
Bankable DPR
Energy yield
WAsP wind energy assessment
Financial model
Sensitivity and tariff analysis
Grid assessment
Nearest substation capacity check

Lead time Kick-off in 1 week · Warranty Clarification support for 6 months · MOQ 1 report

Price for verified buyers

by Deccan Engineering Services (Sample) · invoiced by BARREL

Request quote

Surface condenser, Smart series

SampleSteam turbines & condensers

Taptiakshay · TAP-B66 series

Output
5 MW to 120 MW (see variants)
Turbine type
Condensing
Inlet steam
67 ata / 485 C
Speed
5500 rpm with gearbox
Exhaust pressure
3.5 ata

Lead time 14-20 months · Warranty 12 months · MOQ 1 nos

Price for verified buyers

by Taptiakshay Thermal Systems (Sample) · invoiced by BARREL

Request quote

Marshalling kiosk wiring, Pro 5 series

SampleServicePanel wiring & assembly

Sutlej · SUT-0A2 series

Panel complexity
Up to 500 wires to Over 2000 wires (see variants)
Panel type
LT distribution
Wiring standard
IEC 61439
Wire type
FRLS 1.5 sq mm
Ferrules
Hand marked

Lead time 3-5 weeks · Warranty 12 months from delivery · MOQ 1 nos

Price on quote

by Sutlej Fabricators (Sample) · invoiced by BARREL

Request quote

Pataliputraojas · PAT-0E8 series

Capacity covered
Up to 100 MWp to Portfolio unlimited (see variants)
Deployment
On-premise
Users
Unlimited
Work orders
Preventive, corrective, predictive
Mobile app
Android and iOS offline

Lead time 1-2 weeks · Warranty 12 months support · MOQ 1 licence

Price for verified buyers

by Pataliputraojas Technologies (Sample) · invoiced by BARREL

Request quote

Coorg · COO-2A4 series

Gas flow rate
10000 Am3/h to 250000 Am3/h (see variants)
Outlet emission
Below 50 mg/Nm3
Inlet temperature
Up to 180 deg C
Filter media
PPS felt
Cleaning
Reverse air

Lead time 12-16 weeks · Warranty 12 months from commissioning · MOQ 1 set

Price for verified buyers

by Coorg Enviro Engineers (Sample) · invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited