Fire-rated coatings & penetration sealsBrahmaputra3 variants
SampleFire-rated coatings & penetration seals Brahmaputra · BRA-567 series
- Fire rating
- 90 min to 180 min (see variants)
- Product type
- Water-based intumescent coating
- Application
- Brush or airless spray
- Thickness
- 2 mm DFT
- Smoke and toxicity
- Low smoke, halogen-free
Lead time 2-3 weeks · Warranty 12 months shelf life · MOQ 1 kg
Inverter & PCS sparesUrjamark4 variants
SampleInverter & PCS spares Urjamark · URJ-1C9 series
- Inverter rating
- 100 kW to 1 MW (see variants)
- Component
- Fan
- DC voltage
- 1000 V
- Cooling
- Forced air
- Fits make
- As per inverter nameplate
Lead time 4-8 weeks · Warranty 12 months from supply · MOQ 1 nos
AlternatorsTaxilasurya6 variants
Taxilasurya · TAX-336 series
- Rating
- 125 kVA to 5000 kVA (see variants)
- Voltage
- 415 V
- Excitation
- PMG
- Poles
- 4
- Insulation class
- F
Lead time 2-3 weeks · Warranty 24 months · MOQ 1 nos
Concrete batching & transit mixersDoaba3 variants
SampleFor rentConcrete batching & transit mixers Doaba · DOA-EE7 series
- Output capacity
- Transit mixer 6 cu m to Batching plant 60 cu m/h (see variants)
- Drum capacity
- 3 cu m
- Type
- Self loading
- Operator
- Included
- Fuel
- Included
Lead time 2-3 days · Warranty Breakdown replacement within 48 h · MOQ 1 nos
VRLA & tubular batteriesKiranline3 variants
SampleVRLA & tubular batteries Kiranline · KIR-0B3 series
- Capacity
- 200 Ah to 1000 Ah (see variants)
- Nominal voltage
- 2 V
- Technology
- Gel VRLA
- Discharge rate
- C10
- Design life
- 20 years
Lead time 1-2 weeks · Warranty 12 months · MOQ 10 nos
SCR / SNCR NOx controlMunnarspark3 variants
SampleSCR / SNCR NOx control Munnarspark · MUN-731 series
- Flue gas flow
- 250000 Nm3/h to 1000000 Nm3/h (see variants)
- Technology
- Hybrid
- NOx removal efficiency
- 70%
- Reagent
- Aqueous ammonia
- Catalyst
- Plate type
Lead time 30-44 weeks · Warranty 24000 operating hours on catalyst · MOQ 10 set
LT power cablesOjassys6 variants
Ojassys · OJA-999 series
- Size
- 3.5C x 25 sq mm to 3.5C x 300 sq mm (see variants)
- Voltage grade
- 1.1 kV
- Conductor
- Copper
- Insulation
- PVC
- Armour
- Galvanised steel wire
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 1 m
Grid connectivity & GNA applicationsKakatiyaanant4 variants
SampleServiceGrid connectivity & GNA applications Kakatiyaanant · KAK-B89 series
- Capacity applied
- 10 MW to 250 MW (see variants)
- Application
- GNA
- Scope
- Document preparation and filing
- Bank guarantee
- Arranged through partner bank
- Studies
- Detailed power system study
Lead time Grant 3-9 months · Warranty Rework of deficient applications · MOQ 1 application
GST & tax advisorySabarmati6 variants
SampleServiceGST & tax advisory Sabarmati · SAB-2F4 series
- Annual turnover
- INR 5 crore to INR 1000 crore (see variants)
- Scope
- Audit and assessment support
- Issues
- Works contract GST
- Returns
- GSTR-1 and 3B
- Litigation
- Appeals before tribunal
Lead time Start in 1 week · Warranty Professional indemnity · MOQ 1 month
Substation & line O&MTungabhadra3 variants
SampleServiceSubstation & line O&M Tungabhadra · TUN-0A7 series
- Voltage level
- 11 kV to 66 kV (see variants)
- Scope
- Maintenance only
- Shift pattern
- General shift plus on-call
- Manpower
- Engineer plus 6 operators
- Line patrolling
- Quarterly drone patrol
Lead time Baseline condition audit first · Warranty As per contract · MOQ 1 month
Compressors & storage tanksVidarbha6 variants
SampleCompressors & storage tanks Vidarbha · VID-B61 series
- Capacity
- 10 Nm3/h to 1000 Nm3/h (see variants)
- Type
- Diaphragm
- Suction pressure
- 5-30 bar
- Discharge pressure
- 500 bar
- Drive
- 415 V AC motor
Lead time 12-16 weeks · Warranty 12 months · MOQ 10 nos
Pre-engineered buildings (PEB)Wayanad5 variants
SamplePre-engineered buildings (PEB) Wayanad · WAY-8D4 series
- Clear span
- 12 m to 30 m (see variants)
- Primary frame
- Hot-rolled section
- Steel grade
- IS 2062 E350
- Roof sheeting
- 0.5 mm Galvalume
- Wall cladding
- 0.45 mm PPGI
Lead time 8-12 weeks · Warranty 20 years sheet coating (limited) · MOQ 1 sq m
Building energy management systems (BEMS)Kiransys5 variants
SampleBuilding energy management systems (BEMS) Kiransys · KIR-522 series
- Monitored points
- 250 points to 5000 points (see variants)
- Protocols
- Modbus, BACnet
- Metering
- Utility meter integration
- Controls
- HVAC scheduling
- Dashboard
- Cloud and on-premises
Lead time Installation 4-12 weeks · Warranty Hardware 12 months · MOQ 1 nos
Data loggersChola4 variants
Chola · CHO-CF2 series
- Channels
- 8 channels to 64 channels (see variants)
- Input types
- PT100
- Resolution
- 16-bit
- Sampling rate
- 100 ms min
- Memory
- 2 GB
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 1 nos
Silica gel, gaskets & sealsMadurai4 variants
SampleSilica gel, gaskets & seals Madurai · MAD-013 series
- Pack size
- 1 kg to 25 kg (see variants)
- Product type
- Gasket sheet
- Bead size
- 2-5 mm
- Moisture adsorption
- Min 25% at 25 deg C 80% RH
- Colour change
- Blue to pink
Lead time 3-7 days · Warranty 24 months shelf life in sealed pack · MOQ 1 kg
Feasibility studies & DPRDeccan5 variants
SampleServiceFeasibility studies & DPR Deccan · DEC-D54 series
- Project capacity
- 10 MW to 1 GW (see variants)
- Scope
- Bankable DPR
- Energy yield
- WAsP wind energy assessment
- Financial model
- Sensitivity and tariff analysis
- Grid assessment
- Nearest substation capacity check
Lead time Kick-off in 1 week · Warranty Clarification support for 6 months · MOQ 1 report
Steam turbines & condensersPataliputra3 variants
SampleSteam turbines & condensers Pataliputra · PAT-D16 series
- Output
- 30 MW to 120 MW (see variants)
- Turbine type
- Back-pressure
- Inlet steam
- 67 ata / 485 C
- Speed
- 3000 rpm
- Exhaust pressure
- 0.1 ata
Lead time 8-12 months · Warranty 12 months · MOQ 2 nos
Bank guarantees & surety bondsNalanda3 variants
SampleServiceBank guarantees & surety bonds Nalanda · NAL-326 series
- Guarantee amount
- INR 5 crore to INR 100 crore (see variants)
- Instrument
- Insurance surety bond
- Purpose
- Performance
- Validity
- 12 months
- Margin
- 10-25%
Lead time Renewals 3 days · Warranty As per guarantee terms · MOQ 1 job
Steam turbines & condensersTaptiakshay5 variants
SampleSteam turbines & condensers Taptiakshay · TAP-B66 series
- Output
- 5 MW to 120 MW (see variants)
- Turbine type
- Condensing
- Inlet steam
- 67 ata / 485 C
- Speed
- 5500 rpm with gearbox
- Exhaust pressure
- 3.5 ata
Lead time 14-20 months · Warranty 12 months · MOQ 1 nos
Panel wiring & assemblySutlej4 variants
SampleServicePanel wiring & assembly Sutlej · SUT-0A2 series
- Panel complexity
- Up to 500 wires to Over 2000 wires (see variants)
- Panel type
- LT distribution
- Wiring standard
- IEC 61439
- Wire type
- FRLS 1.5 sq mm
- Ferrules
- Hand marked
Lead time 3-5 weeks · Warranty 12 months from delivery · MOQ 1 nos
Asset & O&M managementPataliputraojas4 variants
SampleAsset & O&M management Pataliputraojas · PAT-0E8 series
- Capacity covered
- Up to 100 MWp to Portfolio unlimited (see variants)
- Deployment
- On-premise
- Users
- Unlimited
- Work orders
- Preventive, corrective, predictive
- Mobile app
- Android and iOS offline
Lead time 1-2 weeks · Warranty 12 months support · MOQ 1 licence
ESP & bag filtersCoorg5 variants
Coorg · COO-2A4 series
- Gas flow rate
- 10000 Am3/h to 250000 Am3/h (see variants)
- Outlet emission
- Below 50 mg/Nm3
- Inlet temperature
- Up to 180 deg C
- Filter media
- PPS felt
- Cleaning
- Reverse air
Lead time 12-16 weeks · Warranty 12 months from commissioning · MOQ 1 set
Prefab control roomsNarmadashakti5 variants
SamplePrefab control rooms Narmadashakti · NAR-7A1 series
- Floor area
- 18 sq m to 72 sq m (see variants)
- Wall panel
- Rockwool sandwich 100 mm
- Fire rating
- 1 hour
- Roof
- Sloped PUF panel
- Flooring
- Anti-static vinyl
Lead time 8-10 weeks · Warranty 24 months structural · MOQ 2 nos
Distribution transformersMauryajal4 variants
SampleDistribution transformers Mauryajal · MAU-5B3 series
- Rating
- 200 kVA to 1000 kVA (see variants)
- Voltage ratio
- 22/0.433 kV
- Vector group
- Dyn11
- Cooling
- ONAN
- Energy efficiency level
- Amorphous