Traction substations & transformersLumengen3 variants
SampleTraction substations & transformers Lumengen · LUM-569 series
- Rating
- 20 MVA to 30 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 27.5 kV
- Connection
- V-V
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 36 months from supply · MOQ 1 nos
Contact & messenger wiresKakatiya5 variants
SampleContact & messenger wires Kakatiya · KAK-012 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Copper magnesium
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 1 km
Section insulators & neutral sectionsUrjaline5 variants
SampleSection insulators & neutral sections Urjaline · URJ-2A9 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Epoxy glass
- Length
- 20 m
- Rated current
- 400 A
Lead time 8-10 weeks · Warranty 12 months · MOQ 5 nos
Section insulators & neutral sectionsTaxila5 variants
SampleSection insulators & neutral sections Taxila · TAX-355 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Epoxy glass
- Length
- 20 m
- Rated current
- 600 A
Lead time 4-6 weeks · Warranty 24 months · MOQ 5 nos
Contact & messenger wiresMahanadifaraday4 variants
SampleContact & messenger wires Mahanadifaraday · MAH-C82 series
- Conductor
- 107 mm2 contact wire to 95 mm2 messenger (see variants)
- Material
- Copper silver
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 2 km
Contact & messenger wiresWayanadjoule4 variants
SampleContact & messenger wires Wayanadjoule · WAY-0F4 series
- Conductor
- 107 mm2 contact wire to 95 mm2 messenger (see variants)
- Material
- Copper magnesium
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 4-6 weeks · Warranty As per contract · MOQ 10 km
Traction SCADAMahanadi5 variants
Mahanadi · MAH-C51 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 61850
Lead time 20-28 weeks · Warranty 24 months · MOQ 2 lot
Traction substations & transformersSabarmati6 variants
SampleTraction substations & transformers Sabarmati · SAB-567 series
- Rating
- 10 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 27.5 kV
- Connection
- Single-phase
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Traction SCADAUrjaline5 variants
Urjaline · URJ-EA1 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 60870-5-104
Lead time 20-28 weeks · Warranty 36 months with AMC · MOQ 2 lot
Section insulators & neutral sectionsWayanadjoule5 variants
SampleSection insulators & neutral sections Wayanadjoule · WAY-C91 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 25 kV AC
- Material
- Epoxy glass
- Length
- 18 m
- Rated current
- 400 A
Lead time 8-10 weeks · Warranty 12 months · MOQ 2 nos
OHE masts, cantilevers & catenaryUrjaline5 variants
SampleOHE masts, cantilevers & catenary Urjaline · URJ-C24 series
- Mast type
- Single track mast to Tunnel bracket (see variants)
- Section
- Rolled beam
- Height
- 8 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty 12 months · MOQ 1 nos
Traction SCADADhruvline5 variants
Dhruvline · DHR-D71 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 61850
Lead time 20-28 weeks · Warranty 24 months · MOQ 2 lot
Traction substations & transformersDhruvline3 variants
SampleTraction substations & transformers Dhruvline · DHR-DE5 series
- Rating
- 16 MVA to 21.6 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 55 kV (2x25)
- Connection
- Scott
- Cooling
- ONAN
Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Traction SCADALumengen4 variants
Lumengen · LUM-D77 series
- Control posts
- Up to 10 posts to Up to 100 posts (see variants)
- Architecture
- Redundant server
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 61850
Lead time 12-16 weeks · Warranty 24 months · MOQ 1 lot
Section insulators & neutral sectionsKonarkkiran4 variants
SampleSection insulators & neutral sections Konarkkiran · KON-2A6 series
- Type
- Standard section insulator to Neutral section 2 x 25 kV (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Polymer
- Length
- 20 m
- Rated current
- 400 A
Lead time 4-6 weeks · Warranty 24 months · MOQ 2 nos
Contact & messenger wiresMahanadi4 variants
SampleContact & messenger wires Mahanadi · MAH-0F4 series
- Conductor
- 150 mm2 contact wire to Droppers (see variants)
- Material
- Copper magnesium
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 4-6 weeks · Warranty As per contract · MOQ 1 km
Section insulators & neutral sectionsKonarkkiran5 variants
SampleSection insulators & neutral sections Konarkkiran · KON-FD5 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Epoxy glass
- Length
- 15 m
- Rated current
- 600 A
Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos
Contact & messenger wiresTaxila5 variants
SampleContact & messenger wires Taxila · TAX-0F9 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Hard drawn copper
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 10 km
Traction substations & transformersKonarkkiran6 variants
SampleTraction substations & transformers Konarkkiran · KON-D49 series
- Rating
- 10 MVA to 50 MVA (see variants)
- Primary voltage
- 110 kV
- Secondary voltage
- 27.5 kV
- Connection
- Single-phase
- Cooling
- ONAN
Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 10 nos
Section insulators & neutral sectionsLumengen5 variants
SampleSection insulators & neutral sections Lumengen · LUM-354 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Epoxy glass
- Length
- 18 m
- Rated current
- 600 A
Lead time 4-6 weeks · Warranty 12 months · MOQ 5 nos
Traction substations & transformersDhruvline3 variants
SampleTraction substations & transformers Dhruvline · DHR-063 series
- Rating
- 21.6 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 55 kV (2x25)
- Connection
- V-V
- Cooling
- ONAN
Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Contact & messenger wiresUrjaline3 variants
SampleContact & messenger wires Urjaline · URJ-005 series
- Conductor
- 65 mm2 messenger to Droppers (see variants)
- Material
- Copper magnesium
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 10 km
Traction substations & transformersLumengen6 variants
SampleTraction substations & transformers Lumengen · LUM-D47 series
- Rating
- 10 MVA to 50 MVA (see variants)
- Primary voltage
- 110 kV
- Secondary voltage
- 2 x 27.5 kV
- Connection
- Auto-transformer
- Cooling
- ONAN/ONAF
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Contact & messenger wiresKonarkkiran5 variants
SampleContact & messenger wires Konarkkiran · KON-003 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Cadmium copper
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 10 km