Traction substations & transformersMahanadifaraday3 variants
SampleTraction substations & transformers Mahanadifaraday · MAH-912 series
- Rating
- 21.6 MVA to 50 MVA (see variants)
- Primary voltage
- 110 kV
- Secondary voltage
- 27.5 kV
- Connection
- Single-phase
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 10 nos
Section insulators & neutral sectionsDhruvline3 variants
SampleSection insulators & neutral sections Dhruvline · DHR-FD8 series
- Type
- Insulated overlap to Auto-passing neutral (see variants)
- Voltage
- 25 kV AC
- Material
- Epoxy glass
- Length
- 18 m
- Rated current
- 400 A
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Contact & messenger wiresTaxila4 variants
SampleContact & messenger wires Taxila · TAX-C89 series
- Conductor
- 150 mm2 contact wire to Droppers (see variants)
- Material
- Copper silver
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 km
Contact & messenger wiresMahanadi4 variants
SampleContact & messenger wires Mahanadi · MAH-7B7 series
- Conductor
- 107 mm2 contact wire to 95 mm2 messenger (see variants)
- Material
- Hard drawn copper
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 4-6 weeks · Warranty As per contract · MOQ 5 km
Section insulators & neutral sectionsKalinga5 variants
SampleSection insulators & neutral sections Kalinga · KAL-2A5 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 25 kV AC
- Material
- Polymer
- Length
- 15 m
- Rated current
- 600 A
Lead time 4-6 weeks · Warranty 12 months · MOQ 5 nos
Contact & messenger wiresKakatiya5 variants
SampleContact & messenger wires Kakatiya · KAK-006 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Copper silver
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 10 km
Traction substations & transformersKonarkkiran6 variants
SampleTraction substations & transformers Konarkkiran · KON-566 series
- Rating
- 10 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 55 kV (2x25)
- Connection
- V-V
- Cooling
- ONAN
Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 5 nos
OHE masts, cantilevers & catenaryKalinga6 variants
SampleOHE masts, cantilevers & catenary Kalinga · KAL-1C7 series
- Mast type
- Single track mast to Booster mast (see variants)
- Section
- Rolled beam
- Height
- 11.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty 12 months · MOQ 10 nos
Section insulators & neutral sectionsKakatiya3 variants
SampleSection insulators & neutral sections Kakatiya · KAK-FF4 series
- Type
- Standard section insulator to Insulated overlap (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Polymer
- Length
- 15 m
- Rated current
- 400 A
Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos
OHE masts, cantilevers & catenarySabarmati4 variants
SampleOHE masts, cantilevers & catenary Sabarmati · SAB-1C9 series
- Mast type
- Double track mast to Tunnel bracket (see variants)
- Section
- Tubular
- Height
- 9.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty As per contract · MOQ 10 nos
Traction SCADALumengen5 variants
Lumengen · LUM-EA9 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 60870-5-104
Lead time 20-28 weeks · Warranty 36 months with AMC · MOQ 1 lot
Traction SCADAKonarkkiran4 variants
Konarkkiran · KON-EA2 series
- Control posts
- Up to 10 posts to Up to 100 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 61850
Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 2 lot
Contact & messenger wiresMahanadi5 variants
SampleContact & messenger wires Mahanadi · MAH-C86 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Copper silver
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 4-6 weeks · Warranty As per contract · MOQ 10 km
Traction substations & transformersWayanadjoule3 variants
SampleTraction substations & transformers Wayanadjoule · WAY-DE5 series
- Rating
- 21.6 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 27.5 kV
- Connection
- Auto-transformer
- Cooling
- ONAN
Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 10 nos
Contact & messenger wiresMahanadifaraday5 variants
SampleContact & messenger wires Mahanadifaraday · MAH-017 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Cadmium copper
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 km
Contact & messenger wiresMahanadifaraday3 variants
SampleContact & messenger wires Mahanadifaraday · MAH-005 series
- Conductor
- 150 mm2 contact wire to 95 mm2 messenger (see variants)
- Material
- Copper magnesium
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 8-10 weeks · Warranty As per contract · MOQ 1 km
OHE masts, cantilevers & catenaryKakatiya6 variants
SampleOHE masts, cantilevers & catenary Kakatiya · KAK-F84 series
- Mast type
- Single track mast to Booster mast (see variants)
- Section
- Tubular
- Height
- 11.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty As per contract · MOQ 1 nos
OHE masts, cantilevers & catenaryMahanadifaraday4 variants
SampleOHE masts, cantilevers & catenary Mahanadifaraday · MAH-1C3 series
- Mast type
- Single track mast to Portal 4-track (see variants)
- Section
- Rolled beam
- Height
- 9.5 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty 12 months · MOQ 10 nos
Traction substations & transformersWayanadjoule3 variants
SampleTraction substations & transformers Wayanadjoule · WAY-063 series
- Rating
- 16 MVA to 21.6 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 27.5 kV
- Connection
- Auto-transformer
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Section insulators & neutral sectionsSabarmati3 variants
SampleSection insulators & neutral sections Sabarmati · SAB-C92 series
- Type
- Standard section insulator to Insulated overlap (see variants)
- Voltage
- 25 kV AC
- Material
- Polymer
- Length
- 15 m
- Rated current
- 400 A
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Section insulators & neutral sectionsDhruvline5 variants
SampleSection insulators & neutral sections Dhruvline · DHR-2A2 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 25 kV AC
- Material
- Epoxy glass
- Length
- 20 m
- Rated current
- 600 A
Lead time 8-10 weeks · Warranty 24 months · MOQ 5 nos
Section insulators & neutral sectionsKonarkkiran4 variants
SampleSection insulators & neutral sections Konarkkiran · KON-358 series
- Type
- Neutral section to Auto-passing neutral (see variants)
- Voltage
- 25 kV AC
- Material
- Epoxy glass
- Length
- 20 m
- Rated current
- 600 A
Lead time 8-10 weeks · Warranty 24 months · MOQ 10 nos
Traction substations & transformersUrjaline3 variants
SampleTraction substations & transformers Urjaline · URJ-916 series
- Rating
- 21.6 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 27.5 kV
- Connection
- V-V
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 1 nos
OHE masts, cantilevers & catenaryMahanadifaraday6 variants
SampleOHE masts, cantilevers & catenary Mahanadifaraday · MAH-681 series
- Mast type
- Single track mast to Booster mast (see variants)
- Section
- Rolled beam
- Height
- 8 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty As per contract · MOQ 1 nos