OHE masts, cantilevers & catenaryLumengen4 variants
SampleOHE masts, cantilevers & catenary Lumengen · LUM-C24 series
- Mast type
- Double track mast to Tunnel bracket (see variants)
- Section
- Rolled beam
- Height
- 9.5 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty 12 months · MOQ 5 nos
Section insulators & neutral sectionsKakatiya3 variants
SampleSection insulators & neutral sections Kakatiya · KAK-C95 series
- Type
- Neutral section to Neutral section 2 x 25 kV (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Epoxy glass
- Length
- 18 m
- Rated current
- 600 A
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
OHE masts, cantilevers & catenarySabarmati5 variants
SampleOHE masts, cantilevers & catenary Sabarmati · SAB-688 series
- Mast type
- Double track mast to Booster mast (see variants)
- Section
- Fabricated lattice
- Height
- 8 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
Section insulators & neutral sectionsDhruvline3 variants
SampleSection insulators & neutral sections Dhruvline · DHR-353 series
- Type
- Standard section insulator to Insulated overlap (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Polymer
- Length
- 18 m
- Rated current
- 400 A
Lead time 8-10 weeks · Warranty 12 months · MOQ 1 nos
Contact & messenger wiresLumengen3 variants
SampleContact & messenger wires Lumengen · LUM-017 series
- Conductor
- 150 mm2 contact wire to 95 mm2 messenger (see variants)
- Material
- Hard drawn copper
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 8-10 weeks · Warranty As per contract · MOQ 5 km
Traction substations & transformersMahanadifaraday5 variants
SampleTraction substations & transformers Mahanadifaraday · MAH-DE3 series
- Rating
- 16 MVA to 50 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 55 kV (2x25)
- Connection
- Scott
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 1 nos
Contact & messenger wiresKonarkkiran5 variants
SampleContact & messenger wires Konarkkiran · KON-C84 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Cadmium copper
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 1 km
Section insulators & neutral sectionsLumengen5 variants
SampleSection insulators & neutral sections Lumengen · LUM-C97 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Epoxy glass
- Length
- 18 m
- Rated current
- 600 A
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Traction substations & transformersSabarmati5 variants
SampleTraction substations & transformers Sabarmati · SAB-DE4 series
- Rating
- 10 MVA to 30 MVA (see variants)
- Primary voltage
- 110 kV
- Secondary voltage
- 55 kV (2x25)
- Connection
- V-V
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 36 months from supply · MOQ 1 nos
Traction substations & transformersKakatiya4 variants
SampleTraction substations & transformers Kakatiya · KAK-068 series
- Rating
- 20 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 27.5 kV
- Connection
- Auto-transformer
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 1 nos
Traction SCADAMahanadifaraday5 variants
Mahanadifaraday · MAH-C54 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Redundant server
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 61850
Lead time 20-28 weeks · Warranty 24 months · MOQ 5 lot
Contact & messenger wiresLumengen3 variants
SampleContact & messenger wires Lumengen · LUM-003 series
- Conductor
- 150 mm2 contact wire to 95 mm2 messenger (see variants)
- Material
- Hard drawn copper
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 1 km
Traction SCADAKakatiya3 variants
Kakatiya · KAK-275 series
- Control posts
- Up to 10 posts to Up to 50 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 60870-5-104
Lead time 20-28 weeks · Warranty 36 months with AMC · MOQ 1 lot
Section insulators & neutral sectionsKalinga3 variants
SampleSection insulators & neutral sections Kalinga · KAL-FF2 series
- Type
- Neutral section to Neutral section 2 x 25 kV (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Epoxy glass
- Length
- 20 m
- Rated current
- 400 A
Lead time 4-6 weeks · Warranty 24 months · MOQ 10 nos
OHE masts, cantilevers & catenaryKonarkkiran6 variants
SampleOHE masts, cantilevers & catenary Konarkkiran · KON-F82 series
- Mast type
- Single track mast to Booster mast (see variants)
- Section
- Tubular
- Height
- 9.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty As per contract · MOQ 1 nos
Section insulators & neutral sectionsMahanadifaraday3 variants
SampleSection insulators & neutral sections Mahanadifaraday · MAH-C96 series
- Type
- Insulated overlap to Auto-passing neutral (see variants)
- Voltage
- 25 kV AC
- Material
- Polymer
- Length
- 15 m
- Rated current
- 400 A
Lead time 8-10 weeks · Warranty 12 months · MOQ 2 nos
Traction substations & transformersKalinga5 variants
SampleTraction substations & transformers Kalinga · KAL-DE5 series
- Rating
- 10 MVA to 30 MVA (see variants)
- Primary voltage
- 110 kV
- Secondary voltage
- 2 x 27.5 kV
- Connection
- Scott
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 1 nos