AMC & breakdown servicesChambal6 variants
SampleServiceAMC & breakdown services Chambal · CHA-213 series
- Equipment value covered
- INR 10 lakh to INR 5 crore (see variants)
- Coverage
- Preventive visits only
- Visits
- 4 per year
- Response time
- 4 hours
- Spare parts
- Consumables only
Lead time Emergency mobilisation in 4-24 hours · Warranty Parts replaced covered for 6 months · MOQ 1 job
Substation & line O&MPrakashsys4 variants
SampleServiceSubstation & line O&M Prakashsys · PRA-0A2 series
- Voltage level
- 11 kV to 132 kV (see variants)
- Scope
- Maintenance only
- Shift pattern
- 3 shifts, 24x7
- Manpower
- Engineer plus 6 operators
- Line patrolling
- Quarterly drone patrol
Lead time Mobilisation in 2-3 weeks · Warranty Service credits for avoidable outages · MOQ 1 month
Grid connectivity & GNA applicationsKutch4 variants
SampleServiceGrid connectivity & GNA applications Kutch · KUT-666 series
- Capacity applied
- 100 MW to 1000 MW (see variants)
- Application
- GNA
- Scope
- End-to-end liaison
- Bank guarantee
- Arranged through partner bank
- Studies
- Grid impact summary
Lead time Filing in 1-2 weeks · Warranty As per contract · MOQ 1 application
Surveys (topo, geotech, drone)Ravikiran3 variants
SampleServiceSurveys (topo, geotech, drone) Ravikiran · RAV-797 series
- Survey area
- 10 acres to 50 acres (see variants)
- Survey method
- Combined drone and ground control
- Accuracy
- Vertical 100 mm
- Deliverables
- Orthomosaic, DSM and contours
- Geotech boreholes
- 1 per 10 acres to 15 m depth
Lead time Report within 3 weeks of fieldwork · Warranty Report validity for design purpose · MOQ 1 site
Type & routine testing laboratories (NABL)Lonavala5 variants
SampleServiceType & routine testing laboratories (NABL) Lonavala · LON-4F4 series
- Test class
- Acceptance test to Type test (HV) (see variants)
- Equipment under test
- PV modules
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 145 kV
- Test standard
- Customer specific test plan
Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos
Substation constructionOjasline5 variants
SampleServiceSubstation construction Ojasline · OJA-DC1 series
- Voltage class
- 11 kV to 220 kV (see variants)
- Type
- Hybrid GIS
- Scope
- Erection and testing
- Transformers
- Up to 50 MVA
- Earthing
- Copper-bonded rods
Lead time Execution 6-15 months · Warranty Defect liability 24 months · MOQ 1 bay
ODC & heavy-haul transportTungabhadra5 variants
SampleServiceODC & heavy-haul transport Tungabhadra · TUN-706 series
- Consignment weight
- 20 tonnes to 250 tonnes (see variants)
- Equipment
- Low-bed trailer
- Route survey
- Included
- Escort and permits
- Police and highway permits included
- Insurance
- Marine-cum-road transit insurance
Lead time Permits 7-21 days · Warranty Carrier liability as per law · MOQ 1 job
Land identification & aggregationKakatiyaanant3 variants
SampleServiceLand identification & aggregation Kakatiyaanant · KAK-2F2 series
- Land requirement
- 250 acres to 1000 acres (see variants)
- Land type
- Barren government land
- Acquisition mode
- Long-term lease
- Screening
- Forest and eco-sensitive screening
- Documents
- 7/12 extracts, mutation, maps
Lead time Shortlist in 3-6 weeks · Warranty Replacement of failed parcels · MOQ 1 acre
AMC & breakdown servicesKutch6 variants
SampleServiceAMC & breakdown services Kutch · KUT-216 series
- Equipment value covered
- INR 10 lakh to INR 5 crore (see variants)
- Coverage
- Preventive plus breakdown labour
- Visits
- 2 per year
- Response time
- 8 hours
- Spare parts
- Consumables only
Lead time Start within 1 week · Warranty Parts replaced covered for 6 months · MOQ 1 job
Contract engineersKrishna6 variants
SampleServiceContract engineers Krishna · KRI-3A2 series
- Engineers deployed
- 1 engineer to 50 engineers (see variants)
- Discipline
- Electrical
- Experience
- 5-10 years
- Qualification
- M.Tech
- Engagement
- Full time on client site
Lead time Joining in 2-4 weeks · Warranty Replacement within 30 days if unsuitable · MOQ 1 man-month
Statutory approvals (CEIG, pollution, forest)Wayanad4 variants
SampleServiceStatutory approvals (CEIG, pollution, forest) Wayanad · WAY-2A2 series
- Approval package
- 3 approvals to Wind park set (10) (see variants)
- Approvals covered
- Forest, wildlife and CRZ
- Documentation
- Self-certification and fee payment
- Liaison
- Office liaison
- Statutory fee
- Included
Lead time Filing in 1-2 weeks · Warranty As per contract · MOQ 1 application
Tariff & regulatory advisoryMunnar6 variants
SampleServiceTariff & regulatory advisory Munnar · MUN-CA8 series
- Matter complexity
- Advisory note to Appeal before APTEL (see variants)
- Forum
- APTEL
- Deliverable
- Opinion note
- Representation
- Drafting only
- Data support
- Benchmark analysis
Lead time Initial note in 1 week · Warranty Free redrafting if Commission raises defects · MOQ 1 case
Engineering & designMysorevidyut6 variants
SampleServiceEngineering & design Mysorevidyut · MYS-CE9 series
- Plant capacity
- 5 MW to 250 MW (see variants)
- Deliverables
- Full IFC drawing set with calculations
- Design software
- PVsyst, AutoCAD, ETAP
- Team
- Lead engineer plus 3 designers
- Turnaround
- 3-4 weeks
Lead time Mobilisation in 7 days · Warranty Design correction at no cost for 12 months · MOQ 1 job
Resource assessment (solar, wind, hydro)Vidyutline4 variants
SampleServiceResource assessment (solar, wind, hydro) Vidyutline · VID-EB8 series
- Measurement duration
- 3 months to 18 months (see variants)
- Technology
- Solar GHI/DNI
- Data source
- On-site measurement
- Equipment
- 80-120 m met mast with LiDAR
- Uncertainty
- P50/P90 with uncertainty budget
Lead time Desktop in 2-3 weeks · Warranty Data availability guarantee above 95% · MOQ 1 report
Thermography & condition monitoringGuptaphase5 variants
SampleServiceThermography & condition monitoring Guptaphase · GUP-B28 series
- Asset size
- 1 MW to 50 MW (see variants)
- Technique
- Vibration analysis
- Camera resolution
- 640x480 radiometric
- Deliverable
- CAT-wise severity ranking with fix actions
- Drone services
- Orthomosaic of full plant
Lead time Report in 5-10 days · Warranty Report accuracy as per method · MOQ 1 site
Solar plant O&M & module cleaningMagadh3 variants
SampleServiceSolar plant O&M & module cleaning Magadh · MAG-F17 series
- Plant capacity
- 1 MWp to 10 MWp (see variants)
- Scope
- Full O&M with spare management
- Cleaning method
- Waterless dry brush
- Cleaning frequency
- Monthly in monsoon
- Availability guarantee
- Grid availability 99.5%
Lead time Takeover in 2-3 weeks · Warranty Service credits as per contract · MOQ 1 MWp
Solar plant O&M & module cleaningTrishulcore3 variants
SampleServiceSolar plant O&M & module cleaning Trishulcore · TRI-D95 series
- Plant capacity
- 10 MWp to 50 MWp (see variants)
- Scope
- O&M plus asset management
- Cleaning method
- Semi-automatic wet
- Cleaning frequency
- Fortnightly
- Availability guarantee
- Grid availability 99.5%
Lead time Baseline audit before takeover · Warranty Availability guarantee with penalty · MOQ 1 MWp
Thermography & condition monitoringShaktitek4 variants
SampleServiceThermography & condition monitoring Shaktitek · SHA-4E5 series
- Asset size
- 5 MW to 50 MW (see variants)
- Technique
- Drone thermal imaging
- Camera resolution
- 640x480 radiometric
- Deliverable
- CAT-wise severity ranking with fix actions
- Drone services
- Orthomosaic of full plant
Lead time Mobilisation in 3-7 days · Warranty Report accuracy as per method · MOQ 1 site
Site acceptance & pre-commissioning testsKaverispark6 variants
SampleServiceSite acceptance & pre-commissioning tests Kaverispark · KAV-C91 series
- Plant size
- 1 MW to 100 MW (see variants)
- Scope
- Electrical pre-commissioning
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Test engineer plus 2 technicians
Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site
Thermography & condition monitoringMaduraisurya3 variants
SampleServiceThermography & condition monitoring Maduraisurya · MAD-4E7 series
- Asset size
- 1 MW to 10 MW (see variants)
- Technique
- Handheld thermography
- Camera resolution
- 1280x1024 radiometric
- Deliverable
- Annotated hotspot report
- Drone services
- Ground sampling 3 cm per pixel
Lead time Mobilisation in 3-7 days · Warranty Re-scan of repaired points at no cost · MOQ 1 site
Tariff & regulatory advisoryPallava6 variants
SampleServiceTariff & regulatory advisory Pallava · PAL-101 series
- Matter complexity
- Advisory note to Appeal before APTEL (see variants)
- Forum
- APTEL
- Deliverable
- Opinion note
- Representation
- Drafting only
- Data support
- Benchmark analysis
Lead time Initial note in 1 week · Warranty Free redrafting if Commission raises defects · MOQ 1 case
Third-party inspection (TPI)Urjatek6 variants
SampleServiceThird-party inspection (TPI) Urjatek · URJ-AE1 series
- Inspection effort
- 1 man-day to 100 man-days (see variants)
- Equipment inspected
- Cables and conductors
- Inspection stage
- Raw material
- Standards used
- Per approved QAP
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Installation & erectionMahabaleshwarflux3 variants
SampleServiceInstallation & erection Mahabaleshwarflux · MAH-723 series
- Installation scope
- 50 MW to 200 MW (see variants)
- Scope
- Structure and module installation
- Manpower deployed
- Peak crew of 200
- Supervision
- Site engineer and safety officer
- Equipment
- Own cranes and erection tools
Lead time Start after material at site · Warranty Defect liability 24 months · MOQ 1 MW
Cabling, trenching & HDD worksUrjatek6 variants
SampleServiceCabling, trenching & HDD works Urjatek · URJ-1C8 series
- Cable route length
- 1 km to 50 km (see variants)
- Method
- Trench plus HDD for crossings
- HDD capacity
- Up to 250 mm bore
- Trench depth
- 1.2 m
- Cable type
- 11/33 kV XLPE
Lead time Mobilisation in 7 days · Warranty Workmanship 12 months · MOQ 1 km