DG & equipment rentalSatavahana6 variants
SampleFor rentDG & equipment rental Satavahana · SAT-A31 series
- DG capacity
- 30 kVA to 1010 kVA (see variants)
- Phase
- 3 phase 415 V
- Fuel
- Included
- Enclosure
- CPCB IV+ canopy
- Operator
- Not included
Lead time 2-3 days · Warranty Replacement within 48 h · MOQ 1 nos
Home inverters & UPSDeccan4 variants
SampleHome inverters & UPS Deccan · DEC-E98 series
- Rating
- 1100 VA to 3500 VA (see variants)
- Topology
- Solar hybrid PCU
- Output waveform
- Quasi sine wave
- Battery voltage
- 12 V
- Input range
- 140-280 V
Lead time 3-4 weeks · Warranty 36 months from supply · MOQ 5 nos
GPS clocks & time synchronisationOjasmark5 variants
SampleGPS clocks & time synchronisation Ojasmark · OJA-AC5 series
- Output set
- NTP only to PTP + IRIG-B + PPS + serial (see variants)
- Time source
- GPS with rubidium holdover
- Accuracy
- ±50 ns
- Network protocols
- SNTP
- PTP profile
- Default
Lead time 3-4 weeks · Warranty 24 months from supply · MOQ 1 nos
Solar thermal collectors & water heatersRavi6 variants
SampleSolar thermal collectors & water heaters Ravi · RAV-AA4 series
- Capacity
- 200 LPD to 5000 LPD (see variants)
- Collector type
- Heat pipe ETC
- Tank material
- SS 304
- Tank insulation
- Glass wool
- System type
- Forced circulation
Lead time 1-2 weeks · Warranty 5 years on tank · MOQ 2 nos
Solar DC cablesNalandakiran4 variants
Nalandakiran · NAL-7D5 series
- Size
- 6 sq mm to 25 sq mm (see variants)
- Rated voltage
- 1.0/1.0 kV DC
- Conductor
- Aluminium class 2
- Insulation
- XLPO
- Sheath
- XLPO halogen-free
Lead time 1-2 weeks · Warranty 25 years performance (limited) · MOQ 10 m
Third-party inspection (TPI)Urjatek6 variants
SampleServiceThird-party inspection (TPI) Urjatek · URJ-AE1 series
- Inspection effort
- 1 man-day to 100 man-days (see variants)
- Equipment inspected
- Cables and conductors
- Inspection stage
- Raw material
- Standards used
- Per approved QAP
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Waste-to-energy (incineration, RDF)Munnaragni3 variants
SampleWaste-to-energy (incineration, RDF) Munnaragni · MUN-264 series
- Plant capacity
- 750 TPD to 1500 TPD (see variants)
- Technology
- Moving grate
- Fuel
- RDF
- Calorific value
- 1500 kcal/kg
- Steam parameters
- 67 bar / 485 C
Lead time 18-24 months · Warranty Performance guarantee as per contract · MOQ 1 lot
Industrial routers, switches & firewallsWayanadagni6 variants
SampleIndustrial routers, switches & firewalls Wayanadagni · WAY-CD9 series
- Ports
- 5 ports to 28 ports (see variants)
- Port speed
- 10/100 Mbps
- Redundancy protocol
- MRP
- Layer
- Layer 3
- PoE
- IEEE 802.3at
Lead time 3-4 weeks · Warranty 36 months from supply · MOQ 5 nos
High-efficiency (IE3/IE4) & HT motorsHampi4 variants
SampleHigh-efficiency (IE3/IE4) & HT motors Hampi · HAM-6A6 series
- Rating
- 7.5 kW to 160 kW (see variants)
- Efficiency class
- IE3
- Voltage
- 3.3 kV
- Speed
- 750 rpm
- Frame
- Fabricated
Lead time 20-26 weeks · Warranty 24 months · MOQ 5 nos
Flue-gas desulphurisation (FGD)Munnarspark6 variants
SampleFlue-gas desulphurisation (FGD) Munnarspark · MUN-2E1 series
- Boiler size
- 10 MW to 350 MW (see variants)
- Technology
- Semi-dry
- SO2 removal efficiency
- 95%
- Inlet SO2
- Up to 2500 mg/Nm3
- Absorber material
- Alloy lined
Lead time 24-36 weeks · Warranty 24 months performance guarantee · MOQ 1 set
Surge arresters (station class)Jhelumtesla5 variants
SampleSurge arresters (station class) Jhelumtesla · JHE-722 series
- System voltage
- 12 kV to 245 kV (see variants)
- Rated voltage
- 120 kV
- Nominal discharge current
- 10 kA
- Line discharge class
- Class 5
- Housing
- Polymer
Lead time 3-5 weeks · Warranty 36 months · MOQ 10 nos
MV metal-clad switchboards (11–33 kV)Lonavala5 variants
SampleMV metal-clad switchboards (11–33 kV) Lonavala · LON-934 series
- Rating
- 11 kV 2500 A to 33 kV 2500 A (see variants)
- Insulation
- Solid insulated
- Short-circuit rating
- 40 kA/3 s
- Panel function
- Bus coupler
- Busbar
- Single busbar
Lead time 8-10 weeks · Warranty 18 months from commissioning · MOQ 2 nos
EHV & HV cablesIndraprasthaanant6 variants
Indraprasthaanant · IND-146 series
- Rating
- 66 kV 1C x 300 sq mm Al to 220 kV 1C x 1200 sq mm Al (see variants)
- Conductor
- Milliken copper
- Insulation
- XLPE (dry cured)
- Metallic screen
- Lead alloy sheath
- Outer sheath
- HDPE
Lead time 10-14 weeks · Warranty As per contract · MOQ 1 km
Installation & erectionMahabaleshwarflux3 variants
SampleServiceInstallation & erection Mahabaleshwarflux · MAH-723 series
- Installation scope
- 50 MW to 200 MW (see variants)
- Scope
- Structure and module installation
- Manpower deployed
- Peak crew of 200
- Supervision
- Site engineer and safety officer
- Equipment
- Own cranes and erection tools
Lead time Start after material at site · Warranty Defect liability 24 months · MOQ 1 MW
Biomass handling & storageCoromandel6 variants
SampleBiomass handling & storage Coromandel · COR-3E8 series
- Storage capacity
- 10 m3 to 1000 m3 (see variants)
- Equipment
- Shredder
- Material
- Galvanised steel
- Discharge rate
- 10 TPH
- Motor power
- 3 kW
Lead time 4-6 weeks · Warranty 18 months · MOQ 1 nos
Cabling, trenching & HDD worksUrjatek6 variants
SampleServiceCabling, trenching & HDD works Urjatek · URJ-1C8 series
- Cable route length
- 1 km to 50 km (see variants)
- Method
- Trench plus HDD for crossings
- HDD capacity
- Up to 250 mm bore
- Trench depth
- 1.2 m
- Cable type
- 11/33 kV XLPE
Lead time Mobilisation in 7 days · Warranty Workmanship 12 months · MOQ 1 km
Transformer oilWayanad6 variants
Wayanad · WAY-384 series
- Pack size
- 20 litre to Bulk 16000 litre (see variants)
- Grade
- Grade II
- Type
- Trace inhibited
- BDV after treatment
- Min 70 kV
- Flash point
- Min 140 deg C
Lead time 1-2 weeks · Warranty Test certificate per batch · MOQ 1 litre
Engineering & designOjasline3 variants
SampleServiceEngineering & design Ojasline · OJA-009 series
- Plant capacity
- 5 MW to 25 MW (see variants)
- Deliverables
- Full IFC drawing set with calculations
- Design software
- PVsyst, AutoCAD, ETAP
- Team
- Electrical, civil and SCADA discipline leads
- Turnaround
- 10-12 weeks
Lead time 3-4 weeks · Warranty As per contract · MOQ 1 job
Transformer & scrap disposalPrithvimark4 variants
SampleServiceTransformer & scrap disposal Prithvimark · PRI-434 series
- Scrap quantity
- 1 tonne to 50 tonnes (see variants)
- Scrap type
- Oil
- Process
- Dismantling and segregation
- Authorisation
- Hazardous waste permit
- PCB testing
- Not applicable
Lead time Pick-up in 5-10 days · Warranty Certificate of disposal · MOQ 1 lot
UPS systemsTamramax6 variants
Tamramax · TAM-5E3 series
- Rating
- 1 kVA to 60 kVA (see variants)
- Topology
- Online double conversion
- Input / output
- 3-ph / 3-ph
- Input voltage window
- 304-478 V
- Output power factor
- 1.0
Lead time 2-3 weeks · Warranty 36 months with AMC · MOQ 5 nos
Third-party inspection (TPI)Malwavolt3 variants
SampleServiceThird-party inspection (TPI) Malwavolt · MAL-AE6 series
- Inspection effort
- 20 man-days to 100 man-days (see variants)
- Equipment inspected
- Cables and conductors
- Inspection stage
- In-process
- Standards used
- Per client specification
- Inspector qualification
- Level II NDT certified
Lead time Report in 24-48 hours · Warranty As per contract · MOQ 1 day
Data loggersKonkan5 variants
Konkan · KON-BB1 series
- Channels
- 4 channels to 64 channels (see variants)
- Input types
- 4-20 mA
- Resolution
- 16-bit
- Sampling rate
- 1 s min
- Memory
- 8 GB
Lead time 3-4 weeks · Warranty 12 months from supply · MOQ 2 nos
Hybrid & off-grid inverters, charge controllersNilgirisudarshan4 variants
SampleHybrid & off-grid inverters, charge controllers Nilgirisudarshan · NIL-F93 series
- Rated power
- 3 kVA to 10 kVA (see variants)
- Battery voltage
- 96 V
- Battery type
- Both
- Max PV input
- 1000 W
- Controller type
- PWM
Lead time 1-2 weeks · Warranty 24 months from supply · MOQ 5 nos
Micro & pico hydro setsKonark4 variants
SampleMicro & pico hydro sets Konark · KON-6D6 series
- Rated output
- 500 W to 10 kW (see variants)
- Turbine type
- Cross-flow
- Net head
- 2-5 m
- Flow
- 10-500 l/s
- Generator
- Permanent magnet
Lead time 3-5 weeks · Warranty 24 months · MOQ 5 kW