OHE masts, cantilevers & catenaryKonarkkiran5 variants
SampleOHE masts, cantilevers & catenary Konarkkiran · KON-F52 series
- Mast type
- Double track mast to Booster mast (see variants)
- Section
- Tubular
- Height
- 9.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty As per contract · MOQ 1 nos
Traction substations & transformersKalinga5 variants
SampleTraction substations & transformers Kalinga · KAL-D45 series
- Rating
- 16 MVA to 50 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 27.5 kV
- Connection
- V-V
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Traction substations & transformersLumengen5 variants
SampleTraction substations & transformers Lumengen · LUM-912 series
- Rating
- 16 MVA to 50 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 2 x 27.5 kV
- Connection
- Single-phase
- Cooling
- ONAN/ONAF
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 2 nos
OHE masts, cantilevers & catenaryMahanadi5 variants
SampleOHE masts, cantilevers & catenary Mahanadi · MAH-F54 series
- Mast type
- Double track mast to Booster mast (see variants)
- Section
- Rolled beam
- Height
- 9.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty 12 months · MOQ 10 nos
Traction SCADAKalinga3 variants
Kalinga · KAL-279 series
- Control posts
- Up to 10 posts to Up to 50 posts (see variants)
- Architecture
- Redundant server
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 60870-5-104
Lead time 20-28 weeks · Warranty 24 months · MOQ 10 lot
OHE masts, cantilevers & catenaryWayanadjoule3 variants
SampleOHE masts, cantilevers & catenary Wayanadjoule · WAY-1C8 series
- Mast type
- Portal 4-track to Booster mast (see variants)
- Section
- Fabricated lattice
- Height
- 9.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty As per contract · MOQ 2 nos
Traction SCADAMahanadifaraday5 variants
Mahanadifaraday · MAH-6A5 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 61850
Lead time 12-16 weeks · Warranty 24 months · MOQ 5 lot
Section insulators & neutral sectionsLumengen4 variants
SampleSection insulators & neutral sections Lumengen · LUM-FD8 series
- Type
- Neutral section to Auto-passing neutral (see variants)
- Voltage
- 25 kV AC
- Material
- Epoxy glass
- Length
- 15 m
- Rated current
- 400 A
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
Contact & messenger wiresUrjaline3 variants
SampleContact & messenger wires Urjaline · URJ-012 series
- Conductor
- 150 mm2 contact wire to 95 mm2 messenger (see variants)
- Material
- Cadmium copper
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 5 km
Contact & messenger wiresSabarmati4 variants
SampleContact & messenger wires Sabarmati · SAB-013 series
- Conductor
- 150 mm2 contact wire to Droppers (see variants)
- Material
- Hard drawn copper
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 5 km
Section insulators & neutral sectionsKalinga3 variants
SampleSection insulators & neutral sections Kalinga · KAL-FD1 series
- Type
- Neutral section to Neutral section 2 x 25 kV (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Polymer
- Length
- 20 m
- Rated current
- 400 A
Lead time 4-6 weeks · Warranty 12 months · MOQ 5 nos
OHE masts, cantilevers & catenaryLumengen4 variants
SampleOHE masts, cantilevers & catenary Lumengen · LUM-684 series
- Mast type
- Portal 2-track to Booster mast (see variants)
- Section
- Tubular
- Height
- 8 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty As per contract · MOQ 10 nos
Section insulators & neutral sectionsSabarmati4 variants
SampleSection insulators & neutral sections Sabarmati · SAB-359 series
- Type
- Standard section insulator to Neutral section 2 x 25 kV (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Epoxy glass
- Length
- 20 m
- Rated current
- 600 A
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Traction SCADADhruvline4 variants
Dhruvline · DHR-6A1 series
- Control posts
- Up to 10 posts to Up to 100 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 61850
Lead time 12-16 weeks · Warranty 36 months with AMC · MOQ 1 lot
Contact & messenger wiresUrjaline4 variants
SampleContact & messenger wires Urjaline · URJ-7B1 series
- Conductor
- 107 mm2 contact wire to 95 mm2 messenger (see variants)
- Material
- Copper magnesium
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 8-10 weeks · Warranty 12 months · MOQ 10 km
Section insulators & neutral sectionsMahanadifaraday4 variants
SampleSection insulators & neutral sections Mahanadifaraday · MAH-FD1 series
- Type
- Neutral section to Auto-passing neutral (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Polymer
- Length
- 15 m
- Rated current
- 600 A
Lead time 4-6 weeks · Warranty 12 months · MOQ 5 nos
Contact & messenger wiresKalinga3 variants
SampleContact & messenger wires Kalinga · KAL-0F5 series
- Conductor
- 150 mm2 contact wire to 95 mm2 messenger (see variants)
- Material
- Cadmium copper
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 4-6 weeks · Warranty As per contract · MOQ 10 km
Section insulators & neutral sectionsWayanadjoule5 variants
SampleSection insulators & neutral sections Wayanadjoule · WAY-354 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Polymer
- Length
- 20 m
- Rated current
- 400 A
Lead time 8-10 weeks · Warranty 24 months · MOQ 2 nos
Traction SCADAMahanadi4 variants
Mahanadi · MAH-D76 series
- Control posts
- Up to 25 posts to Up to 250 posts (see variants)
- Architecture
- Redundant server
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 61850
Lead time 20-28 weeks · Warranty 24 months · MOQ 1 lot
OHE masts, cantilevers & catenaryKalinga3 variants
SampleOHE masts, cantilevers & catenary Kalinga · KAL-F85 series
- Mast type
- Double track mast to Portal 4-track (see variants)
- Section
- Rolled beam
- Height
- 11.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty As per contract · MOQ 10 nos
Section insulators & neutral sectionsTaxila5 variants
SampleSection insulators & neutral sections Taxila · TAX-C98 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Epoxy glass
- Length
- 20 m
- Rated current
- 400 A
Lead time 4-6 weeks · Warranty 12 months · MOQ 5 nos
Section insulators & neutral sectionsSabarmati5 variants
SampleSection insulators & neutral sections Sabarmati · SAB-FD8 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 25 kV AC
- Material
- Polymer
- Length
- 15 m
- Rated current
- 400 A
Lead time 4-6 weeks · Warranty 12 months · MOQ 2 nos
OHE masts, cantilevers & catenarySabarmati6 variants
SampleOHE masts, cantilevers & catenary Sabarmati · SAB-C29 series
- Mast type
- Single track mast to Booster mast (see variants)
- Section
- Rolled beam
- Height
- 11.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty 12 months · MOQ 2 nos
Traction substations & transformersSabarmati3 variants
SampleTraction substations & transformers Sabarmati · SAB-913 series
- Rating
- 10 MVA to 20 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 27.5 kV
- Connection
- Scott
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 1 nos