Installation & erectionVindhya3 variants
SampleServiceInstallation & erection Vindhya · VIN-DB2 series
- Installation scope
- 5 MW to 25 MW (see variants)
- Scope
- Complete mechanical and electrical erection
- Manpower deployed
- Peak crew of 200
- Supervision
- Site engineer and safety officer
- Equipment
- Own cranes and erection tools
Lead time Mobilisation in 10 days · Warranty Workmanship 12 months · MOQ 1 MW
EPC / turnkey contractingWayanad3 variants
SampleServiceEPC / turnkey contracting Wayanad · WAY-954 series
- Project capacity
- 500 kWp to 5 MWp (see variants)
- Scope
- Design, supply, install, commission
- Module technology
- Non-DCR bifacial
- Inverter
- Central inverter
- Performance guarantee
- PR 82% with CUF guarantee
Lead time Contract to start in 2-3 weeks · Warranty Inverter 5-10 years · MOQ 1 MWp
Testing & commissioningVindhya5 variants
SampleServiceTesting & commissioning Vindhya · VIN-A82 series
- Plant capacity
- 1 MW to 50 MW (see variants)
- Tests covered
- Full plant functional and PR test
- Instruments
- Relay test set, thermal camera
- Calibration
- Calibration valid at test date
- Team
- Commissioning engineer plus 2 testers
Lead time 1-2 weeks on site · Warranty As per contract · MOQ 1 MW
Solar & wind BoP constructionHampiurja3 variants
SampleServiceSolar & wind BoP construction Hampiurja · HAM-9E4 series
- Project size
- 10 MW to 50 MW (see variants)
- Scope
- Cabling and earthing
- DC cables
- 6 sq mm solar cable
- MV cables
- 33 kV XLPE Al armoured
- Inverter station
- Skid or containerised
Lead time Mobilisation in 14 days · Warranty Defect liability 24 months · MOQ 1 MW
Cabling, trenching & HDD worksSatpurapushpak6 variants
SampleServiceCabling, trenching & HDD works Satpurapushpak · SAT-C11 series
- Cable route length
- 1 km to 50 km (see variants)
- Method
- Trenchless HDD
- HDD capacity
- Up to 450 mm bore
- Trench depth
- 1.2 m
- Cable type
- LT armoured
Lead time Mobilisation in 7 days · Warranty Workmanship 12 months · MOQ 1 km
Installation & erectionRavi5 variants
SampleServiceInstallation & erection Ravi · RAV-716 series
- Installation scope
- 5 MW to 100 MW (see variants)
- Scope
- Structure and module installation
- Manpower deployed
- 25 technicians per MW-block
- Supervision
- Site engineer and safety officer
- Equipment
- Own cranes and erection tools
Lead time Start after material at site · Warranty Defect liability 24 months · MOQ 1 MW
EPC / turnkey contractingTarangline4 variants
SampleServiceEPC / turnkey contracting Tarangline · TAR-381 series
- Project capacity
- 25 MWp to 300 MWp (see variants)
- Scope
- Turnkey including 33 kV line and bay
- Module technology
- TOPCon DCR
- Inverter
- String inverter
- Performance guarantee
- PR 80% for first year
Lead time Large projects 12 months · Warranty Inverter 5-10 years · MOQ 1 MWp
Surveys (topo, geotech, drone)Hampiurja4 variants
SampleServiceSurveys (topo, geotech, drone) Hampiurja · HAM-F32 series
- Survey area
- 25 acres to 250 acres (see variants)
- Survey method
- DGPS and total station
- Accuracy
- Vertical 100 mm
- Deliverables
- Orthomosaic, DSM and contours
- Geotech boreholes
- As per project requirement
Lead time 2-4 weeks · Warranty Report validity for design purpose · MOQ 1 site
Surveys (topo, geotech, drone)Doaba5 variants
SampleServiceSurveys (topo, geotech, drone) Doaba · DOA-8D7 series
- Survey area
- 10 acres to 250 acres (see variants)
- Survey method
- Drone photogrammetry
- Accuracy
- Vertical 50 mm
- Deliverables
- Orthomosaic, DSM and contours
- Geotech boreholes
- As per project requirement
Lead time Report within 3 weeks of fieldwork · Warranty Report validity for design purpose · MOQ 1 site
Solar & wind BoP constructionNilgiri3 variants
SampleServiceSolar & wind BoP construction Nilgiri · NIL-F34 series
- Project size
- 10 MW to 50 MW (see variants)
- Scope
- Cabling and earthing
- DC cables
- 6 sq mm solar cable
- MV cables
- 33 kV XLPE Cu
- Inverter station
- Brick built room
Lead time Mobilisation in 14 days · Warranty Workmanship 12 months · MOQ 1 MW
Installation & erectionDoaba4 variants
SampleServiceInstallation & erection Doaba · DOA-728 series
- Installation scope
- 1 MW to 25 MW (see variants)
- Scope
- Complete mechanical and electrical erection
- Manpower deployed
- 25 technicians per MW-block
- Supervision
- Site engineer and safety officer
- Equipment
- Pile driver, crane, telehandler
Lead time Phased by block · Warranty Workmanship 12 months · MOQ 1 MW
Testing & commissioningKakatiyasetu4 variants
SampleServiceTesting & commissioning Kakatiyasetu · KAK-EE2 series
- Plant capacity
- 10 MW to 100 MW (see variants)
- Tests covered
- Full plant functional and PR test
- Instruments
- Calibrated IV tracer, megger, CRM
- Calibration
- Calibration valid at test date
- Team
- Commissioning engineer plus 2 testers
Lead time Mobilisation in 5 days · Warranty Retest at no cost if failure traced to test error · MOQ 1 MW
Substation constructionSatpurapushpak5 variants
SampleServiceSubstation construction Satpurapushpak · SAT-833 series
- Voltage class
- 11 kV to 220 kV (see variants)
- Type
- Hybrid GIS
- Scope
- Erection and testing
- Transformers
- Up to 315 MVA
- Earthing
- GI flat grid with ground rods
Lead time Engineering in 4-6 weeks · Warranty Equipment as per OEM · MOQ 1 bay
Cabling, trenching & HDD worksMysorevidyut5 variants
SampleServiceCabling, trenching & HDD works Mysorevidyut · MYS-1C5 series
- Cable route length
- 1 km to 20 km (see variants)
- Method
- Trenchless HDD
- HDD capacity
- Up to 250 mm bore
- Trench depth
- 1.5 m
- Cable type
- 11/33 kV XLPE
Lead time Mobilisation in 7 days · Warranty Restoration warranty 6 months · MOQ 1 km
EPC / turnkey contractingEllorakavach6 variants
SampleServiceEPC / turnkey contracting Ellorakavach · ELL-AB9 series
- Project capacity
- 500 kWp to 50 MWp (see variants)
- Scope
- Turnkey including 33 kV line and bay
- Module technology
- TOPCon DCR
- Inverter
- String inverter
- Performance guarantee
- PR 80% for first year
Lead time 3-6 months to commissioning · Warranty Module 12-year product, 25-year performance · MOQ 1 MWp
Project management (PMC) & owner's engineerSatpurapushpak6 variants
SampleServiceProject management (PMC) & owner's engineer Satpurapushpak · SAT-492 series
- Project size
- 10 MW to 500 MW (see variants)
- Scope
- Design review and QA/QC
- Team on site
- PM, 3 engineers, QA/QC inspector
- Schedule control
- MS Project weekly
- Reporting
- Monthly dashboard for lenders
Lead time Deployment in 2 weeks · Warranty Professional indemnity cover · MOQ 1 month
Surveys (topo, geotech, drone)Tirhut6 variants
SampleServiceSurveys (topo, geotech, drone) Tirhut · TIR-F34 series
- Survey area
- 10 acres to 500 acres (see variants)
- Survey method
- Combined drone and ground control
- Accuracy
- Vertical 100 mm
- Deliverables
- Orthomosaic, DSM and contours
- Geotech boreholes
- As per project requirement
Lead time Mobilisation in 5 days · Warranty Re-survey of disputed areas at no cost · MOQ 1 site
Transmission line erection & stringingSatavahanakelvin4 variants
SampleServiceTransmission line erection & stringing Satavahanakelvin · SAT-5C6 series
- Voltage level
- 33 kV to 220 kV (see variants)
- Circuit type
- Single circuit
- Conductor
- ACSR Panther
- Scope
- Foundation, erection and stringing
- Stringing method
- Conventional stringing
Lead time Per section schedule · Warranty Defect liability 24 months · MOQ 1 km
Installation & erectionRavikiran6 variants
SampleServiceInstallation & erection Ravikiran · RAV-C42 series
- Installation scope
- 1 MW to 100 MW (see variants)
- Scope
- Electrical BoP erection
- Manpower deployed
- 25 technicians per MW-block
- Supervision
- Site engineer and safety officer
- Equipment
- Own cranes and erection tools
Lead time Start after material at site · Warranty Defect liability 24 months · MOQ 1 MW
Installation & erectionRavikiran4 variants
SampleServiceInstallation & erection Ravikiran · RAV-711 series
- Installation scope
- 10 MW to 100 MW (see variants)
- Scope
- Structure and module installation
- Manpower deployed
- Peak crew of 200
- Supervision
- Site engineer and safety officer
- Equipment
- Own cranes and erection tools
Lead time Phased by block · Warranty Defect liability 24 months · MOQ 1 MW
Installation & erectionKakatiyasetu4 variants
SampleServiceInstallation & erection Kakatiyasetu · KAK-727 series
- Installation scope
- 1 MW to 25 MW (see variants)
- Scope
- Structure and module installation
- Manpower deployed
- Peak crew of 200
- Supervision
- Site engineer and safety officer
- Equipment
- Pile driver, crane, telehandler
Lead time Phased by block · Warranty Workmanship 12 months · MOQ 1 MW
Installation & erectionKaverishikhar3 variants
SampleServiceInstallation & erection Kaverishikhar · KAV-724 series
- Installation scope
- 50 MW to 200 MW (see variants)
- Scope
- Structure and module installation
- Manpower deployed
- 25 technicians per MW-block
- Supervision
- Project manager, engineers, QA/QC
- Equipment
- Pile driver, crane, telehandler
Lead time Phased by block · Warranty Defect liability 24 months · MOQ 1 MW
Substation constructionMaurya6 variants
SampleServiceSubstation construction Maurya · MAU-369 series
- Voltage class
- 11 kV to 400 kV (see variants)
- Type
- Hybrid GIS
- Scope
- Civil and structural
- Transformers
- Up to 315 MVA
- Earthing
- Copper-bonded rods
Lead time Engineering in 4-6 weeks · Warranty Equipment as per OEM · MOQ 1 bay
Civil & foundation worksRavi6 variants
SampleServiceCivil & foundation works Ravi · RAV-1C5 series
- Works volume
- 1 MW equivalent to 100 MW equivalent (see variants)
- Foundation type
- Raft or isolated footing
- Concrete grade
- M30
- Pull-out testing
- Random test plus lateral load
- Reinforcement
- Fe 550D
Lead time Mobilisation in 10 days · Warranty Pile load test certified · MOQ 1 job