Third-party inspection (TPI)Maduraisurya4 variants
SampleServiceThird-party inspection (TPI) Maduraisurya · MAD-214 series
- Inspection effort
- 1 man-day to 20 man-days (see variants)
- Equipment inspected
- Towers and structures
- Inspection stage
- Raw material
- Standards used
- Per approved QAP
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Product certification (BIS, IEC, ALMM)Kakatiyarajat5 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Kakatiyarajat · KAK-B86 series
- Certification scope
- ALMM List-I to Full global set (see variants)
- Standards covered
- IEC 62109 for inverters
- Application support
- Documentation and filing
- Test lab liaison
- NABL accredited labs
- Factory audit
- BIS inspection support
Lead time 8-24 weeks for certificate · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Type & routine testing laboratories (NABL)Kakatiyarajat4 variants
SampleServiceType & routine testing laboratories (NABL) Kakatiyarajat · KAK-925 series
- Test class
- Special test to Type test (HV) (see variants)
- Equipment under test
- PV modules
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 145 kV
- Test standard
- IS or IEC as specified
Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Site acceptance & pre-commissioning testsKrishna3 variants
SampleServiceSite acceptance & pre-commissioning tests Krishna · KRI-C61 series
- Plant size
- 5 MW to 25 MW (see variants)
- Scope
- Electrical pre-commissioning
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Test engineer plus 2 technicians
Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site
Third-party inspection (TPI)Kaveridhruv3 variants
SampleServiceThird-party inspection (TPI) Kaveridhruv · KAV-093 series
- Inspection effort
- 10 man-days to 50 man-days (see variants)
- Equipment inspected
- PV modules and inverters
- Inspection stage
- In-process
- Standards used
- Per client specification
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day
Product certification (BIS, IEC, ALMM)Urjatron6 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Urjatron · URJ-B85 series
- Certification scope
- Product family BIS to Full global set (see variants)
- Standards covered
- IS 14286 and IS 16077
- Application support
- End-to-end with lab liaison
- Test lab liaison
- Notified bodies
- Factory audit
- BIS inspection support
Lead time 8-24 weeks for certificate · Warranty As per contract · MOQ 1 application
Product certification (BIS, IEC, ALMM)Malwavolt3 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Malwavolt · MAL-231 series
- Certification scope
- Product family BIS to ALMM List-II (cells) (see variants)
- Standards covered
- IEC 61215 and 61730
- Application support
- Documentation and filing
- Test lab liaison
- NABL accredited labs
- Factory audit
- Pre-audit gap analysis
Lead time 8-24 weeks for certificate · Warranty As per contract · MOQ 1 application
Type & routine testing laboratories (NABL)Vidyutline6 variants
SampleServiceType & routine testing laboratories (NABL) Vidyutline · VID-921 series
- Test class
- Routine test to Type test (HV) (see variants)
- Equipment under test
- Power transformers
- Accreditation
- NABL ISO/IEC 17025
- Rating range
- Up to 400 kV
- Test standard
- Customer specific test plan
Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos
Third-party inspection (TPI)Deccan5 variants
SampleServiceThird-party inspection (TPI) Deccan · DEC-AE3 series
- Inspection effort
- 5 man-days to 100 man-days (see variants)
- Equipment inspected
- PV modules and inverters
- Inspection stage
- Final pre-dispatch
- Standards used
- Per client specification
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Third-party inspection (TPI)Rajatcore6 variants
SampleServiceThird-party inspection (TPI) Rajatcore · RAJ-6E2 series
- Inspection effort
- 1 man-day to 100 man-days (see variants)
- Equipment inspected
- Transformers and reactors
- Inspection stage
- In-process
- Standards used
- Per approved QAP
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Factory acceptance test (FAT) witnessingVidyutline6 variants
SampleServiceFactory acceptance test (FAT) witnessing Vidyutline · VID-177 series
- Equipment value
- INR 25 lakh to INR 25 crore (see variants)
- Test plan
- Based on tender specification
- Tests witnessed
- Routine tests per IS or IEC
- Team
- Specialist engineers per discipline
- Location
- International factory
Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day
Electrical safety auditsMahanadiloha5 variants
SampleServiceElectrical safety audits Mahanadiloha · MAH-889 series
- Installed load
- 1 MVA to 50 MVA (see variants)
- Scope
- Audit with measurements
- Auditor
- CEA-licensed engineer
- Measurements
- Earth resistance, insulation
- Report
- Findings with risk rating
Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Third-party inspection (TPI)Kaverispark4 variants
SampleServiceThird-party inspection (TPI) Kaverispark · KAV-217 series
- Inspection effort
- 5 man-days to 50 man-days (see variants)
- Equipment inspected
- Towers and structures
- Inspection stage
- Final pre-dispatch
- Standards used
- Per approved QAP
- Inspector qualification
- Level II NDT certified
Lead time Report in 24-48 hours · Warranty As per contract · MOQ 1 day
Site acceptance & pre-commissioning testsKakatiyarajat6 variants
SampleServiceSite acceptance & pre-commissioning tests Kakatiyarajat · KAK-C98 series
- Plant size
- 1 MW to 100 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Team of 6 with lead
Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Third-party inspection (TPI)Mahanadi4 variants
SampleServiceThird-party inspection (TPI) Mahanadi · MAH-217 series
- Inspection effort
- 1 man-day to 20 man-days (see variants)
- Equipment inspected
- Transformers and reactors
- Inspection stage
- Final pre-dispatch
- Standards used
- Per client specification
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Product certification (BIS, IEC, ALMM)Urjatek6 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Urjatek · URJ-B41 series
- Certification scope
- Single product BIS to Multi-standard IEC set (see variants)
- Standards covered
- IS 14286 and IS 16077
- Application support
- Documentation and filing
- Test lab liaison
- NABL accredited labs
- Factory audit
- BIS inspection support
Lead time 8-24 weeks for certificate · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Factory acceptance test (FAT) witnessingVidyutline3 variants
SampleServiceFactory acceptance test (FAT) witnessing Vidyutline · VID-172 series
- Equipment value
- INR 50 lakh to INR 5 crore (see variants)
- Test plan
- Based on tender specification
- Tests witnessed
- Routine tests per IS or IEC
- Team
- Lead engineer and assistant
- Location
- International factory
Lead time Deployment within 3-5 days · Warranty As per contract · MOQ 1 day
Site acceptance & pre-commissioning testsDwaraka6 variants
SampleServiceSite acceptance & pre-commissioning tests Dwaraka · DWA-628 series
- Plant size
- 5 MW to 250 MW (see variants)
- Scope
- Solar SAT
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Team of 6 with lead
Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site
Third-party inspection (TPI)Urjatron5 variants
SampleServiceThird-party inspection (TPI) Urjatron · URJ-6E5 series
- Inspection effort
- 1 man-day to 50 man-days (see variants)
- Equipment inspected
- Towers and structures
- Inspection stage
- Raw material
- Standards used
- Per approved QAP
- Inspector qualification
- B.E. Electrical with 8 years experience
Lead time Report in 24-48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day
Product certification (BIS, IEC, ALMM)Kamrup4 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Kamrup · KAM-465 series
- Certification scope
- ALMM List-II (cells) to Full global set (see variants)
- Standards covered
- IS 14286 and IS 16077
- Application support
- Documentation and filing
- Test lab liaison
- NABL accredited labs
- Factory audit
- Pre-audit gap analysis
Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 application
Factory acceptance test (FAT) witnessingMaduraividyut3 variants
SampleServiceFactory acceptance test (FAT) witnessing Maduraividyut · MAD-DF3 series
- Equipment value
- INR 1 crore to INR 10 crore (see variants)
- Test plan
- Client approved FAT protocol
- Tests witnessed
- Routine tests per IS or IEC
- Team
- Lead engineer and assistant
- Location
- Domestic factory
Lead time Deployment within 3-5 days · Warranty As per contract · MOQ 1 day
Electrical safety auditsRajatcore6 variants
SampleServiceElectrical safety audits Rajatcore · RAJ-2D6 series
- Installed load
- 500 kVA to 50 MVA (see variants)
- Scope
- Audit with arc-flash study
- Auditor
- Chartered engineer
- Measurements
- Earth resistance, insulation
- Report
- Findings with risk rating
Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Type & routine testing laboratories (NABL)Malwavolt4 variants
SampleServiceType & routine testing laboratories (NABL) Malwavolt · MAL-922 series
- Test class
- Type test (LV) to Short-circuit test (see variants)
- Equipment under test
- Insulators
- Accreditation
- NABL ISO/IEC 17025
- Rating range
- Up to 33 kV
- Test standard
- IS or IEC as specified
Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Site acceptance & pre-commissioning testsMahanadiloha5 variants
SampleServiceSite acceptance & pre-commissioning tests Mahanadiloha · MAH-C64 series
- Plant size
- 5 MW to 100 MW (see variants)
- Scope
- Solar SAT
- Instruments
- Insulation tester, earth tester
- Test sequence
- Visual, mechanical, electrical
- Team
- Team of 6 with lead
Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site