Section insulators & neutral sectionsUrjaline4 variants
SampleSection insulators & neutral sections Urjaline · URJ-FD3 series
- Type
- Standard section insulator to Neutral section 2 x 25 kV (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Polymer
- Length
- 18 m
- Rated current
- 400 A
Lead time 4-6 weeks · Warranty 24 months · MOQ 2 nos
Traction SCADAMahanadi3 variants
Mahanadi · MAH-273 series
- Control posts
- Up to 50 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 61850
Lead time 12-16 weeks · Warranty 24 months · MOQ 1 lot
Contact & messenger wiresLumengen4 variants
SampleContact & messenger wires Lumengen · LUM-C88 series
- Conductor
- 150 mm2 contact wire to Droppers (see variants)
- Material
- Cadmium copper
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 8-10 weeks · Warranty As per contract · MOQ 2 km
Contact & messenger wiresWayanadjoule3 variants
SampleContact & messenger wires Wayanadjoule · WAY-005 series
- Conductor
- 150 mm2 contact wire to 95 mm2 messenger (see variants)
- Material
- Copper magnesium
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 8-10 weeks · Warranty As per contract · MOQ 2 km
OHE masts, cantilevers & catenaryDhruvline6 variants
SampleOHE masts, cantilevers & catenary Dhruvline · DHR-F55 series
- Mast type
- Single track mast to Booster mast (see variants)
- Section
- Fabricated lattice
- Height
- 8 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty As per contract · MOQ 1 nos
Traction SCADADhruvline5 variants
Dhruvline · DHR-278 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 61850
Lead time 12-16 weeks · Warranty 24 months · MOQ 5 lot
Traction SCADAMahanadifaraday5 variants
Mahanadifaraday · MAH-EA2 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 60870-5-104
Lead time 20-28 weeks · Warranty 24 months · MOQ 1 lot
OHE masts, cantilevers & catenaryWayanadjoule4 variants
SampleOHE masts, cantilevers & catenary Wayanadjoule · WAY-F86 series
- Mast type
- Double track mast to Tunnel bracket (see variants)
- Section
- Rolled beam
- Height
- 11.5 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty As per contract · MOQ 1 nos
Traction substations & transformersTaxila6 variants
SampleTraction substations & transformers Taxila · TAX-564 series
- Rating
- 10 MVA to 50 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 27.5 kV
- Connection
- Auto-transformer
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 1 nos
OHE masts, cantilevers & catenaryMahanadi3 variants
SampleOHE masts, cantilevers & catenary Mahanadi · MAH-C29 series
- Mast type
- Single track mast to Portal 2-track (see variants)
- Section
- Tubular
- Height
- 8 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty 12 months · MOQ 1 nos
Contact & messenger wiresTaxila5 variants
SampleContact & messenger wires Taxila · TAX-7B3 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Copper silver
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 4-6 weeks · Warranty 12 months · MOQ 2 km
Traction SCADAKalinga5 variants
Kalinga · KAL-6A2 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Redundant server
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 61850
Lead time 20-28 weeks · Warranty 36 months with AMC · MOQ 10 lot
Contact & messenger wiresDhruvline5 variants
SampleContact & messenger wires Dhruvline · DHR-008 series
- Conductor
- 107 mm2 contact wire to Droppers (see variants)
- Material
- Cadmium copper
- Section
- Grooved
- Tensile strength
- ≥ 345 N/mm2
- Conductivity
- ≥ 80% IACS
Lead time 8-10 weeks · Warranty As per contract · MOQ 1 km
OHE masts, cantilevers & catenaryKalinga4 variants
SampleOHE masts, cantilevers & catenary Kalinga · KAL-F56 series
- Mast type
- Double track mast to Tunnel bracket (see variants)
- Section
- Rolled beam
- Height
- 11.5 m
- Steel grade
- Fe 410
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty As per contract · MOQ 1 nos
Traction SCADAKonarkkiran3 variants
Konarkkiran · KON-C52 series
- Control posts
- Up to 25 posts to Up to 100 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 60870-5-104
Lead time 20-28 weeks · Warranty 24 months · MOQ 1 lot
Section insulators & neutral sectionsWayanadjoule4 variants
SampleSection insulators & neutral sections Wayanadjoule · WAY-FF9 series
- Type
- Standard section insulator to Neutral section 2 x 25 kV (see variants)
- Voltage
- 25 kV AC
- Material
- Epoxy glass
- Length
- 18 m
- Rated current
- 600 A
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Traction SCADAKalinga4 variants
Kalinga · KAL-EA3 series
- Control posts
- Up to 25 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 61850
Lead time 20-28 weeks · Warranty 24 months · MOQ 1 lot
OHE masts, cantilevers & catenaryMahanadifaraday6 variants
SampleOHE masts, cantilevers & catenary Mahanadifaraday · MAH-C26 series
- Mast type
- Single track mast to Booster mast (see variants)
- Section
- Tubular
- Height
- 11.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty As per contract · MOQ 2 nos
OHE masts, cantilevers & catenaryTaxila3 variants
SampleOHE masts, cantilevers & catenary Taxila · TAX-F81 series
- Mast type
- Portal 2-track to Tunnel bracket (see variants)
- Section
- Tubular
- Height
- 9.5 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 4-6 weeks · Warranty As per contract · MOQ 5 nos
Traction substations & transformersKakatiya4 variants
SampleTraction substations & transformers Kakatiya · KAK-D44 series
- Rating
- 20 MVA to 50 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 55 kV (2x25)
- Connection
- Single-phase
- Cooling
- ONAN
Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 1 nos
Traction substations & transformersUrjaline5 variants
SampleTraction substations & transformers Urjaline · URJ-DE1 series
- Rating
- 16 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 2 x 27.5 kV
- Connection
- V-V
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 36 months from supply · MOQ 1 nos
Traction substations & transformersMahanadifaraday4 variants
SampleTraction substations & transformers Mahanadifaraday · MAH-D42 series
- Rating
- 20 MVA to 50 MVA (see variants)
- Primary voltage
- 220 kV
- Secondary voltage
- 2 x 27.5 kV
- Connection
- Scott
- Cooling
- ONAN
Lead time 28-36 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Section insulators & neutral sectionsMahanadifaraday4 variants
SampleSection insulators & neutral sections Mahanadifaraday · MAH-FF2 series
- Type
- Standard section insulator to Neutral section 2 x 25 kV (see variants)
- Voltage
- 2 x 25 kV AC
- Material
- Epoxy glass
- Length
- 18 m
- Rated current
- 400 A
Lead time 8-10 weeks · Warranty 12 months · MOQ 10 nos
Contact & messenger wiresWayanadjoule3 variants
SampleContact & messenger wires Wayanadjoule · WAY-C86 series
- Conductor
- 150 mm2 contact wire to 95 mm2 messenger (see variants)
- Material
- Copper magnesium
- Section
- Grooved
- Tensile strength
- ≥ 480 N/mm2
- Conductivity
- ≥ 97% IACS
Lead time 8-10 weeks · Warranty As per contract · MOQ 1 km