Third-party inspection (TPI)Dwaraka3 variants
SampleServiceThird-party inspection (TPI) Dwaraka · DWA-963 series
- Inspection effort
- 10 man-days to 50 man-days (see variants)
- Equipment inspected
- PV modules and inverters
- Inspection stage
- Raw material
- Standards used
- Per approved QAP
- Inspector qualification
- B.E. Electrical with 8 years experience
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Factory acceptance test (FAT) witnessingShaktimark6 variants
SampleServiceFactory acceptance test (FAT) witnessing Shaktimark · SHA-D82 series
- Equipment value
- INR 25 lakh to INR 25 crore (see variants)
- Test plan
- Client approved FAT protocol
- Tests witnessed
- Routine tests per IS or IEC
- Team
- Specialist engineers per discipline
- Location
- International factory
Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day
Site acceptance & pre-commissioning testsMalwavolt5 variants
SampleServiceSite acceptance & pre-commissioning tests Malwavolt · MAL-621 series
- Plant size
- 10 MW to 250 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Relay test set, IV tracer, CRM
- Test sequence
- Visual, mechanical, electrical
- Team
- Team of 6 with lead
Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site
Site acceptance & pre-commissioning testsMahanadiloha4 variants
SampleServiceSite acceptance & pre-commissioning tests Mahanadiloha · MAH-C65 series
- Plant size
- 5 MW to 50 MW (see variants)
- Scope
- Solar SAT
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Test engineer plus 2 technicians
Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site
Third-party inspection (TPI)Vidyutline5 variants
SampleServiceThird-party inspection (TPI) Vidyutline · VID-094 series
- Inspection effort
- 5 man-days to 100 man-days (see variants)
- Equipment inspected
- PV modules and inverters
- Inspection stage
- Final pre-dispatch
- Standards used
- Per approved QAP
- Inspector qualification
- B.E. Electrical with 8 years experience
Lead time Report in 24-48 hours · Warranty As per contract · MOQ 1 day
Type & routine testing laboratories (NABL)Krishna3 variants
SampleServiceType & routine testing laboratories (NABL) Krishna · KRI-414 series
- Test class
- Special test to Type test (MV) (see variants)
- Equipment under test
- Insulators
- Accreditation
- NABL ISO/IEC 17025
- Rating range
- Up to 33 kV
- Test standard
- IS or IEC as specified
Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos
Type & routine testing laboratories (NABL)Maduraividyut3 variants
SampleServiceType & routine testing laboratories (NABL) Maduraividyut · MAD-FB7 series
- Test class
- Special test to Type test (MV) (see variants)
- Equipment under test
- Power transformers
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 145 kV
- Test standard
- Customer specific test plan
Lead time Slot in 1-2 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Electrical safety auditsAiravatsys4 variants
SampleServiceElectrical safety audits Airavatsys · AIR-2D9 series
- Installed load
- 1 MVA to 25 MVA (see variants)
- Scope
- Audit with arc-flash study
- Auditor
- Chartered engineer
- Measurements
- Earth resistance, insulation
- Report
- Action plan with timeline
Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Type & routine testing laboratories (NABL)Mahanadi3 variants
SampleServiceType & routine testing laboratories (NABL) Mahanadi · MAH-413 series
- Test class
- Special test to Type test (MV) (see variants)
- Equipment under test
- Cables
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 400 kV
- Test standard
- IS or IEC as specified
Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Factory acceptance test (FAT) witnessingMahanadiloha6 variants
SampleServiceFactory acceptance test (FAT) witnessing Mahanadiloha · MAH-A25 series
- Equipment value
- INR 25 lakh to INR 25 crore (see variants)
- Test plan
- Based on tender specification
- Tests witnessed
- Routine tests per IS or IEC
- Team
- Lead engineer and assistant
- Location
- Domestic factory
Lead time Report within 2 days of test · Warranty As per contract · MOQ 1 day
Site acceptance & pre-commissioning testsMalwavolt5 variants
SampleServiceSite acceptance & pre-commissioning tests Malwavolt · MAL-625 series
- Plant size
- 10 MW to 250 MW (see variants)
- Scope
- Electrical pre-commissioning
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Team of 6 with lead
Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site
Site acceptance & pre-commissioning testsMahanadi5 variants
SampleServiceSite acceptance & pre-commissioning tests Mahanadi · MAH-1A7 series
- Plant size
- 1 MW to 50 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Team of 6 with lead
Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site
Factory acceptance test (FAT) witnessingKaveridhruv3 variants
SampleServiceFactory acceptance test (FAT) witnessing Kaveridhruv · KAV-A29 series
- Equipment value
- INR 5 crore to INR 25 crore (see variants)
- Test plan
- Based on tender specification
- Tests witnessed
- Routine tests per IS or IEC
- Team
- Lead engineer and assistant
- Location
- Domestic factory
Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day
Type & routine testing laboratories (NABL)Rajatcore6 variants
SampleServiceType & routine testing laboratories (NABL) Rajatcore · RAJ-FB3 series
- Test class
- Acceptance test to Short-circuit test (see variants)
- Equipment under test
- Cables
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 145 kV
- Test standard
- Customer specific test plan
Lead time Test report in 3-8 weeks · Warranty Free retest on lab error · MOQ 1 nos
Electrical safety auditsLonavala3 variants
SampleServiceElectrical safety audits Lonavala · LON-687 series
- Installed load
- 1 MVA to 10 MVA (see variants)
- Scope
- Visual and documentation audit
- Auditor
- Chartered engineer
- Measurements
- Earth resistance, insulation
- Report
- Findings with risk rating
Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Third-party inspection (TPI)Kamrup6 variants
SampleServiceThird-party inspection (TPI) Kamrup · KAM-966 series
- Inspection effort
- 1 man-day to 100 man-days (see variants)
- Equipment inspected
- Towers and structures
- Inspection stage
- Final pre-dispatch
- Standards used
- Per approved QAP
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Site acceptance & pre-commissioning testsKaverispark5 variants
SampleServiceSite acceptance & pre-commissioning tests Kaverispark · KAV-C99 series
- Plant size
- 10 MW to 250 MW (see variants)
- Scope
- Solar SAT
- Instruments
- Relay test set, IV tracer, CRM
- Test sequence
- Per client approved format
- Team
- Team of 6 with lead
Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Product certification (BIS, IEC, ALMM)Maduraividyut3 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Maduraividyut · MAD-558 series
- Certification scope
- ALMM List-II (cells) to Multi-standard IEC set (see variants)
- Standards covered
- IEC 61215 and 61730
- Application support
- End-to-end with lab liaison
- Test lab liaison
- Notified bodies
- Factory audit
- BIS inspection support
Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Product certification (BIS, IEC, ALMM)Urjatek6 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Urjatek · URJ-B45 series
- Certification scope
- Single product BIS to Multi-standard IEC set (see variants)
- Standards covered
- IEC 61215 and 61730
- Application support
- End-to-end with lab liaison
- Test lab liaison
- Notified bodies
- Factory audit
- Pre-audit gap analysis
Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Electrical safety auditsDeccan3 variants
SampleServiceElectrical safety audits Deccan · DEC-759 series
- Installed load
- 10 MVA to 50 MVA (see variants)
- Scope
- Visual and documentation audit
- Auditor
- CEA-licensed engineer
- Measurements
- Thermography and power quality
- Report
- Action plan with timeline
Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Product certification (BIS, IEC, ALMM)Kakatiyarajat4 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Kakatiyarajat · KAK-B85 series
- Certification scope
- Single product BIS to ALMM List-II (cells) (see variants)
- Standards covered
- IS 14286 and IS 16077
- Application support
- Documentation and filing
- Test lab liaison
- Notified bodies
- Factory audit
- BIS inspection support
Lead time 8-24 weeks for certificate · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Third-party inspection (TPI)Kakatiyarajat4 variants
SampleServiceThird-party inspection (TPI) Kakatiyarajat · KAK-6E4 series
- Inspection effort
- 5 man-days to 50 man-days (see variants)
- Equipment inspected
- Cables and conductors
- Inspection stage
- Raw material
- Standards used
- Per approved QAP
- Inspector qualification
- Level II NDT certified
Lead time Report in 24-48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day
Type & routine testing laboratories (NABL)Urjatek6 variants
SampleServiceType & routine testing laboratories (NABL) Urjatek · URJ-FB9 series
- Test class
- Acceptance test to Short-circuit test (see variants)
- Equipment under test
- PV modules
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 145 kV
- Test standard
- IS or IEC as specified
Lead time Slot in 1-2 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Factory acceptance test (FAT) witnessingUrjatek6 variants
SampleServiceFactory acceptance test (FAT) witnessing Urjatek · URJ-D86 series
- Equipment value
- INR 25 lakh to INR 25 crore (see variants)
- Test plan
- Client approved FAT protocol
- Tests witnessed
- Routine plus special tests
- Team
- Specialist engineers per discipline
- Location
- Domestic factory
Lead time Deployment within 3-5 days · Warranty As per contract · MOQ 1 day