Testing, inspection & certification

Independent testing, inspection and product certification.

Companies offering this · 20

Listings (207)

Prices are shown to verified buyers. Register your company to see them and request quotes.

Vidyutline · VID-095 series

Inspection effort
1 man-day to 50 man-days (see variants)
Equipment inspected
Cables and conductors
Inspection stage
In-process
Standards used
Per approved QAP
Inspector qualification
B.E. Electrical with 8 years experience

Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day

Price for verified buyers

by Vidyutline Technical Services (Sample) · invoiced by BARREL

Request quote

Environmental and ingress protection testing, Elite 8 series

SampleServiceType & routine testing laboratories (NABL)

Kakatiya · KAK-9B1 series

Test class
Special test to Short-circuit test (see variants)
Equipment under test
PV modules
Accreditation
NABL plus BIS recognition
Rating range
Up to 33 kV
Test standard
IS or IEC as specified

Lead time Test report in 3-8 weeks · Warranty Free retest on lab error · MOQ 1 nos

Price on quote

by Kakatiya Logistics (Sample) · invoiced by BARREL

Request quote

Site acceptance testing for solar plants, Edge 9 series

SampleServiceSite acceptance & pre-commissioning tests

Deccan · DEC-241 series

Plant size
10 MW to 100 MW (see variants)
Scope
Electrical pre-commissioning
Instruments
Relay test set, IV tracer, CRM
Test sequence
Per client approved format
Team
Test engineer plus 2 technicians

Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site

Price for verified buyers

by Deccan Engineering Services (Sample) · invoiced by BARREL

Request quote

Civil and structural stage inspection, Edge series

SampleServiceThird-party inspection (TPI)

Kamrup · KAM-961 series

Inspection effort
10 man-days to 50 man-days (see variants)
Equipment inspected
Towers and structures
Inspection stage
In-process
Standards used
Per approved QAP
Inspector qualification
B.E. Electrical with 8 years experience

Lead time Inspector assigned in 48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day

Price on quote

by Kamrup Projects (Sample) · invoiced by BARREL

Request quote

FAT for GIS and switchgear, Xtra series

SampleServiceFactory acceptance test (FAT) witnessing

Maduraisurya · MAD-171 series

Equipment value
INR 5 crore to INR 25 crore (see variants)
Test plan
Based on tender specification
Tests witnessed
Routine tests per IS or IEC
Team
Specialist engineers per discipline
Location
International factory

Lead time Report within 2 days of test · Warranty Re-witness at no cost if protocol changes · MOQ 1 day

Price on quote

by Maduraisurya Technical Services (Sample) · invoiced by BARREL

Request quote

Site acceptance testing for solar plants, Volt series

SampleServiceSite acceptance & pre-commissioning tests

Maduraisurya · MAD-242 series

Plant size
5 MW to 250 MW (see variants)
Scope
Electrical pre-commissioning
Instruments
Relay test set, IV tracer, CRM
Test sequence
Visual, mechanical, electrical
Team
Test engineer plus 2 technicians

Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site

Price for verified buyers

by Maduraisurya Technical Services (Sample) · invoiced by BARREL

Request quote

Earthing and lightning protection audit, Elite series

SampleServiceElectrical safety audits

Maduraividyut · MAD-5F9 series

Installed load
500 kVA to 25 MVA (see variants)
Scope
Visual and documentation audit
Auditor
CEA-licensed engineer
Measurements
Thermography and power quality
Report
Action plan with timeline

Lead time Audit in 1-2 weeks · Warranty Re-audit at reduced rate · MOQ 1 site

Price on quote

by Maduraividyut Technical Services (Sample) · invoiced by BARREL

Request quote

High-voltage and short-circuit laboratory services, Ultra series

SampleServiceType & routine testing laboratories (NABL)

Maduraisurya · MAD-411 series

Test class
Acceptance test to Type test (MV) (see variants)
Equipment under test
PV modules
Accreditation
NABL ISO/IEC 17025
Rating range
Up to 33 kV
Test standard
IS or IEC as specified

Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos

Price on quote

by Maduraisurya Technical Services (Sample) · invoiced by BARREL

Request quote

Earthing and lightning protection audit, Neo 6 series

SampleServiceElectrical safety audits

Kamrup · KAM-5F3 series

Installed load
1 MVA to 10 MVA (see variants)
Scope
Visual and documentation audit
Auditor
Chartered engineer
Measurements
Earth resistance, insulation
Report
Action plan with timeline

Lead time Report in 7-14 days · Warranty Re-audit at reduced rate · MOQ 1 site

Price for verified buyers

by Kamrup Projects (Sample) · invoiced by BARREL

Request quote

BESS container factory acceptance, Volt series

SampleServiceFactory acceptance test (FAT) witnessing

Kaverispark · KAV-9E1 series

Equipment value
INR 25 lakh to INR 25 crore (see variants)
Test plan
Client approved FAT protocol
Tests witnessed
Routine tests per IS or IEC
Team
Specialist engineers per discipline
Location
Domestic factory

Lead time Report within 2 days of test · Warranty Re-witness at no cost if protocol changes · MOQ 1 day

Price for verified buyers

by Kaverispark Logistics (Sample) · invoiced by BARREL

Request quote

FAT witnessing for power transformers, Titan series

SampleServiceFactory acceptance test (FAT) witnessing

Urjatek · URJ-D87 series

Equipment value
INR 25 lakh to INR 10 crore (see variants)
Test plan
Based on tender specification
Tests witnessed
Routine tests per IS or IEC
Team
Specialist engineers per discipline
Location
International factory

Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day

Price for verified buyers

by Urjatek Projects (Sample) · invoiced by BARREL

Request quote

Pre-compliance and test planning, Smart series

SampleServiceProduct certification (BIS, IEC, ALMM)

Shaktimark · SHA-236 series

Certification scope
Product family BIS to Multi-standard IEC set (see variants)
Standards covered
IS 14286 and IS 16077
Application support
Documentation and filing
Test lab liaison
Notified bodies
Factory audit
Pre-audit gap analysis

Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application

Price on quote

by Shaktimark Projects (Sample) · invoiced by BARREL

Request quote

SCADA and RTU factory test, Xtra series

SampleServiceFactory acceptance test (FAT) witnessing

Airavatsys · AIR-DF1 series

Equipment value
INR 25 lakh to INR 25 crore (see variants)
Test plan
Based on tender specification
Tests witnessed
Routine tests per IS or IEC
Team
Specialist engineers per discipline
Location
Domestic factory

Lead time Report within 2 days of test · Warranty Re-witness at no cost if protocol changes · MOQ 1 day

Price for verified buyers

by Airavatsys Engineering Services (Sample) · invoiced by BARREL

Request quote

Urjatron · URJ-6E5 series

Inspection effort
1 man-day to 100 man-days (see variants)
Equipment inspected
Transformers and reactors
Inspection stage
In-process
Standards used
Per approved QAP
Inspector qualification
Level II NDT certified

Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day

Price on quote

by Urjatron Infra Services (Sample) · invoiced by BARREL

Request quote

Routine testing of cables and conductors, Plus series

SampleServiceType & routine testing laboratories (NABL)

Kamrup · KAM-4F4 series

Test class
Acceptance test to Type test (MV) (see variants)
Equipment under test
Cables
Accreditation
NABL ISO/IEC 17025
Rating range
Up to 33 kV
Test standard
IS or IEC as specified

Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos

Price on quote

by Kamrup Projects (Sample) · invoiced by BARREL

Request quote

FAT witnessing for inverters and PCS, Volt series

SampleServiceFactory acceptance test (FAT) witnessing

Kaveridhruv · KAV-A29 series

Equipment value
INR 25 lakh to INR 1 crore (see variants)
Test plan
Based on tender specification
Tests witnessed
Routine plus special tests
Team
Specialist engineers per discipline
Location
Domestic factory

Lead time Report within 2 days of test · Warranty Re-witness at no cost if protocol changes · MOQ 1 day

Price for verified buyers

by Kaveridhruv Consultants (Sample) · invoiced by BARREL

Request quote

BESS container factory acceptance, Core series

SampleServiceFactory acceptance test (FAT) witnessing

Kaverispark · KAV-9E1 series

Equipment value
INR 25 lakh to INR 1 crore (see variants)
Test plan
Client approved FAT protocol
Tests witnessed
Routine plus special tests
Team
Lead engineer and assistant
Location
Domestic factory

Lead time Deployment within 3-5 days · Warranty As per contract · MOQ 1 day

Price on quote

by Kaverispark Logistics (Sample) · invoiced by BARREL

Request quote

PV module qualification testing, Neo series

SampleServiceType & routine testing laboratories (NABL)

Shaktimark · SHA-FB7 series

Test class
Acceptance test to Short-circuit test (see variants)
Equipment under test
Distribution transformers
Accreditation
NABL plus BIS recognition
Rating range
Up to 33 kV
Test standard
IS or IEC as specified

Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos

Price on quote

by Shaktimark Projects (Sample) · invoiced by BARREL

Request quote

BIS registration for PV modules and inverters, Core 9 series

SampleServiceProduct certification (BIS, IEC, ALMM)

Lonavala · LON-B41 series

Certification scope
ALMM List-I to Full global set (see variants)
Standards covered
IEC 62109 for inverters
Application support
End-to-end with lab liaison
Test lab liaison
Notified bodies
Factory audit
Pre-audit gap analysis

Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 application

Price on quote

by Lonavala Logistics (Sample) · invoiced by BARREL

Request quote

Statutory electrical compliance audit, Duo 7 series

SampleServiceElectrical safety audits

Urjatron · URJ-757 series

Installed load
1 MVA to 10 MVA (see variants)
Scope
Audit with measurements
Auditor
Chartered engineer
Measurements
Thermography and power quality
Report
Action plan with timeline

Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site

Price for verified buyers

by Urjatron Infra Services (Sample) · invoiced by BARREL

Request quote

ALMM enlistment for solar modules, Neo series

SampleServiceProduct certification (BIS, IEC, ALMM)

Mahanadiloha · MAH-467 series

Certification scope
ALMM List-II (cells) to Full global set (see variants)
Standards covered
IEC 62109 for inverters
Application support
Documentation and filing
Test lab liaison
NABL accredited labs
Factory audit
BIS inspection support

Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application

Price on quote

by Mahanadiloha Consultants (Sample) · invoiced by BARREL

Request quote

Maduraisurya · MAD-887 series

Installed load
5 MVA to 50 MVA (see variants)
Scope
Audit with arc-flash study
Auditor
CEA-licensed engineer
Measurements
Earth resistance, insulation
Report
Action plan with timeline

Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site

Price on quote

by Maduraisurya Technical Services (Sample) · invoiced by BARREL

Request quote

Routine testing of cables and conductors, Edge series

SampleServiceType & routine testing laboratories (NABL)

Dwaraka · DWA-4F4 series

Test class
Type test (LV) to Short-circuit test (see variants)
Equipment under test
Power transformers
Accreditation
NABL ISO/IEC 17025
Rating range
Up to 400 kV
Test standard
IS or IEC as specified

Lead time Test report in 3-8 weeks · Warranty Free retest on lab error · MOQ 1 nos

Price on quote

by Dwaraka Projects (Sample) · invoiced by BARREL

Request quote

FAT witnessing for power transformers, Elite series

SampleServiceFactory acceptance test (FAT) witnessing

Kakatiyarajat · KAK-D82 series

Equipment value
INR 50 lakh to INR 10 crore (see variants)
Test plan
Client approved FAT protocol
Tests witnessed
Routine plus special tests
Team
Specialist engineers per discipline
Location
Domestic factory

Lead time Deployment within 3-5 days · Warranty As per contract · MOQ 1 day

Price on quote

by Kakatiyarajat Consultants (Sample) · invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited