Product certification (BIS, IEC, ALMM)Rajatcore4 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Rajatcore · RAJ-B81 series
- Certification scope
- Single product BIS to ALMM List-II (cells) (see variants)
- Standards covered
- IEC 62109 for inverters
- Application support
- End-to-end with lab liaison
- Test lab liaison
- Notified bodies
- Factory audit
- BIS inspection support
Lead time 8-24 weeks for certificate · Warranty As per contract · MOQ 1 application
Type & routine testing laboratories (NABL)Kaverispark4 variants
SampleServiceType & routine testing laboratories (NABL) Kaverispark · KAV-411 series
- Test class
- Type test (LV) to Short-circuit test (see variants)
- Equipment under test
- Power transformers
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 33 kV
- Test standard
- IS or IEC as specified
Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Third-party inspection (TPI)Lonavala5 variants
SampleServiceThird-party inspection (TPI) Lonavala · LON-968 series
- Inspection effort
- 5 man-days to 100 man-days (see variants)
- Equipment inspected
- Towers and structures
- Inspection stage
- Raw material
- Standards used
- Per approved QAP
- Inspector qualification
- Level II NDT certified
Lead time Report in 24-48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day
Electrical safety auditsDwaraka5 variants
SampleServiceElectrical safety audits Dwaraka · DWA-889 series
- Installed load
- 500 kVA to 25 MVA (see variants)
- Scope
- Audit with arc-flash study
- Auditor
- CEA-licensed engineer
- Measurements
- Thermography and power quality
- Report
- Action plan with timeline
Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Type & routine testing laboratories (NABL)Malwavolt6 variants
SampleServiceType & routine testing laboratories (NABL) Malwavolt · MAL-925 series
- Test class
- Acceptance test to Short-circuit test (see variants)
- Equipment under test
- Cables
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 145 kV
- Test standard
- Customer specific test plan
Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Third-party inspection (TPI)Krishna3 variants
SampleServiceThird-party inspection (TPI) Krishna · KRI-AE6 series
- Inspection effort
- 1 man-day to 10 man-days (see variants)
- Equipment inspected
- Cables and conductors
- Inspection stage
- Final pre-dispatch
- Standards used
- Per client specification
- Inspector qualification
- B.E. Electrical with 8 years experience
Lead time Inspector assigned in 48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day
Site acceptance & pre-commissioning testsShaktimark3 variants
SampleServiceSite acceptance & pre-commissioning tests Shaktimark · SHA-1A6 series
- Plant size
- 1 MW to 10 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Relay test set, IV tracer, CRM
- Test sequence
- Visual, mechanical, electrical
- Team
- Team of 6 with lead
Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site
Electrical safety auditsKakatiya4 variants
SampleServiceElectrical safety audits Kakatiya · KAK-885 series
- Installed load
- 1 MVA to 25 MVA (see variants)
- Scope
- Visual and documentation audit
- Auditor
- Chartered engineer
- Measurements
- Earth resistance, insulation
- Report
- Action plan with timeline
Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Product certification (BIS, IEC, ALMM)Mahanadi5 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Mahanadi · MAH-B49 series
- Certification scope
- Product family BIS to Multi-standard IEC set (see variants)
- Standards covered
- IS 14286 and IS 16077
- Application support
- End-to-end with lab liaison
- Test lab liaison
- NABL accredited labs
- Factory audit
- Pre-audit gap analysis
Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Factory acceptance test (FAT) witnessingMahanadi5 variants
SampleServiceFactory acceptance test (FAT) witnessing Mahanadi · MAH-DF3 series
- Equipment value
- INR 50 lakh to INR 25 crore (see variants)
- Test plan
- Based on tender specification
- Tests witnessed
- Routine plus special tests
- Team
- Lead engineer and assistant
- Location
- Domestic factory
Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day
Type & routine testing laboratories (NABL)Urjatron4 variants
SampleServiceType & routine testing laboratories (NABL) Urjatron · URJ-9B7 series
- Test class
- Routine test to Type test (LV) (see variants)
- Equipment under test
- Cables
- Accreditation
- NABL ISO/IEC 17025
- Rating range
- Up to 400 kV
- Test standard
- Customer specific test plan
Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos
Electrical safety auditsRajatcore6 variants
SampleServiceElectrical safety audits Rajatcore · RAJ-2D6 series
- Installed load
- 500 kVA to 50 MVA (see variants)
- Scope
- Audit with measurements
- Auditor
- Chartered engineer
- Measurements
- Thermography and power quality
- Report
- Findings with risk rating
Lead time Report in 7-14 days · Warranty Re-audit at reduced rate · MOQ 1 site
Site acceptance & pre-commissioning testsLonavala3 variants
SampleServiceSite acceptance & pre-commissioning tests Lonavala · LON-247 series
- Plant size
- 25 MW to 100 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Team of 6 with lead
Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site
Electrical safety auditsUrjatron5 variants
SampleServiceElectrical safety audits Urjatron · URJ-754 series
- Installed load
- 500 kVA to 25 MVA (see variants)
- Scope
- Audit with arc-flash study
- Auditor
- CEA-licensed engineer
- Measurements
- Earth resistance, insulation
- Report
- Action plan with timeline
Lead time Audit in 1-2 weeks · Warranty Re-audit at reduced rate · MOQ 1 site
Electrical safety auditsVidyutline6 variants
SampleServiceElectrical safety audits Vidyutline · VID-751 series
- Installed load
- 500 kVA to 50 MVA (see variants)
- Scope
- Audit with measurements
- Auditor
- Chartered engineer
- Measurements
- Thermography and power quality
- Report
- Action plan with timeline
Lead time Audit in 1-2 weeks · Warranty Re-audit at reduced rate · MOQ 1 site
Type & routine testing laboratories (NABL)Lonavala5 variants
SampleServiceType & routine testing laboratories (NABL) Lonavala · LON-4F4 series
- Test class
- Acceptance test to Type test (HV) (see variants)
- Equipment under test
- PV modules
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 145 kV
- Test standard
- Customer specific test plan
Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos
Site acceptance & pre-commissioning testsKaverispark6 variants
SampleServiceSite acceptance & pre-commissioning tests Kaverispark · KAV-C91 series
- Plant size
- 1 MW to 100 MW (see variants)
- Scope
- Electrical pre-commissioning
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Test engineer plus 2 technicians
Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site
Third-party inspection (TPI)Urjatek6 variants
SampleServiceThird-party inspection (TPI) Urjatek · URJ-AE1 series
- Inspection effort
- 1 man-day to 100 man-days (see variants)
- Equipment inspected
- Cables and conductors
- Inspection stage
- Raw material
- Standards used
- Per approved QAP
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Third-party inspection (TPI)Malwavolt3 variants
SampleServiceThird-party inspection (TPI) Malwavolt · MAL-AE6 series
- Inspection effort
- 20 man-days to 100 man-days (see variants)
- Equipment inspected
- Cables and conductors
- Inspection stage
- In-process
- Standards used
- Per client specification
- Inspector qualification
- Level II NDT certified
Lead time Report in 24-48 hours · Warranty As per contract · MOQ 1 day
Site acceptance & pre-commissioning testsMahanadi6 variants
SampleServiceSite acceptance & pre-commissioning tests Mahanadi · MAH-1A5 series
- Plant size
- 5 MW to 250 MW (see variants)
- Scope
- Solar SAT
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Team of 6 with lead
Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site
Type & routine testing laboratories (NABL)Kaveridhruv3 variants
SampleServiceType & routine testing laboratories (NABL) Kaveridhruv · KAV-4F9 series
- Test class
- Type test (MV) to Short-circuit test (see variants)
- Equipment under test
- Insulators
- Accreditation
- NABL ISO/IEC 17025
- Rating range
- Up to 33 kV
- Test standard
- IS or IEC as specified
Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Product certification (BIS, IEC, ALMM)Krishna5 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Krishna · KRI-558 series
- Certification scope
- Product family BIS to Multi-standard IEC set (see variants)
- Standards covered
- IEC 62109 for inverters
- Application support
- Documentation and filing
- Test lab liaison
- Notified bodies
- Factory audit
- BIS inspection support
Lead time Kick-off in 1 week · Warranty As per contract · MOQ 1 application
Factory acceptance test (FAT) witnessingKamrup3 variants
SampleServiceFactory acceptance test (FAT) witnessing Kamrup · KAM-A28 series
- Equipment value
- INR 5 crore to INR 25 crore (see variants)
- Test plan
- Based on tender specification
- Tests witnessed
- Routine tests per IS or IEC
- Team
- Specialist engineers per discipline
- Location
- Domestic factory
Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day
Site acceptance & pre-commissioning testsAiravatsys4 variants
SampleServiceSite acceptance & pre-commissioning tests Airavatsys · AIR-1A6 series
- Plant size
- 1 MW to 25 MW (see variants)
- Scope
- Electrical pre-commissioning
- Instruments
- Relay test set, IV tracer, CRM
- Test sequence
- Visual, mechanical, electrical
- Team
- Test engineer plus 2 technicians
Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site