Mobile substationsThanjavurprakash4 variants
Thanjavurprakash · THA-8E4 series
- Transformer rating
- 10 MVA to 50 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 33 kV
- Chassis
- Skid
- Primary switchgear
- GIS bay
Lead time 30-40 weeks · Warranty 36 months · MOQ 1 nos
Shunt & series reactorsNilgirispark5 variants
SampleShunt & series reactors Nilgirispark · NIL-751 series
- Rating
- 25 MVAr to 200 MVAr (see variants)
- System voltage
- 765 kV
- Type
- Series
- Construction
- Air-core dry
- Phases
- Single
Lead time 20-28 weeks · Warranty 36 months from supply · MOQ 10 nos
SF6 circuit breakersTungabhadra5 variants
SampleSF6 circuit breakers Tungabhadra · TUN-786 series
- System voltage
- 36 kV to 420 kV (see variants)
- Rated current
- 1250 A
- Breaking current
- 50 kA
- Operating mechanism
- Hydraulic spring
- Operation
- Single-pole
Lead time 24-30 weeks · Warranty 30 months from supply · MOQ 1 nos
Traction SCADAUrjaline5 variants
Urjaline · URJ-EA1 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 60870-5-104
Lead time 20-28 weeks · Warranty 36 months with AMC · MOQ 2 lot
Tubular busbars & switchyard conductorsMadurai6 variants
SampleTubular busbars & switchyard conductors Madurai · MAD-8B3 series
- Pipe size
- 50 mm OD to 250 mm OD (see variants)
- Material
- Copper
- Wall thickness
- 6 mm
- Current rating
- 1250 A
- Length available
- 12 m
Lead time 3-5 weeks · Warranty 12 months · MOQ 1 m
Furnace & rectifier transformersTejmark4 variants
SampleFurnace & rectifier transformers Tejmark · TEJ-642 series
- Rating
- 20 MVA to 100 MVA (see variants)
- Primary voltage
- 11 kV
- Secondary voltage
- Up to 400 V DC rectified
- Application
- LRF
- Cooling
- ONAN/ONAF
Lead time 16-20 weeks · Warranty 24 months · MOQ 1 nos
Furnace & rectifier transformersEllora5 variants
SampleFurnace & rectifier transformers Ellora · ELL-919 series
- Rating
- 10 MVA to 100 MVA (see variants)
- Primary voltage
- 33 kV
- Secondary voltage
- Up to 400 V DC rectified
- Application
- LRF
- Cooling
- ONAN/ONAF
Lead time 28-36 weeks · Warranty 24 months · MOQ 1 nos
Hybrid & dead-tank switchgearMadurai3 variants
SampleHybrid & dead-tank switchgear Madurai · MAD-FD8 series
- System voltage
- 72.5 kV to 245 kV (see variants)
- Concept
- Dead tank
- Rated current
- 2000 A
- Breaking current
- 40 kA
- Gas
- SF6
Lead time 28-36 weeks · Warranty 24 months · MOQ 1 nos
Hybrid & dead-tank switchgearKanchi3 variants
SampleHybrid & dead-tank switchgear Kanchi · KAN-073 series
- System voltage
- 145 kV to 420 kV (see variants)
- Concept
- Dead tank
- Rated current
- 2000 A
- Breaking current
- 31.5 kA
- Gas
- SF6
Lead time 28-36 weeks · Warranty 36 months · MOQ 5 nos
Isolators & earth switchesJhelumtesla5 variants
SampleIsolators & earth switches Jhelumtesla · JHE-734 series
- System voltage
- 36 kV to 420 kV (see variants)
- Rated current
- 800 A
- Type
- Pantograph
- Earth switch
- With 2 earth switches
- Short-time current
- 31.5 kA
Lead time 10-14 weeks · Warranty 30 months from supply · MOQ 1 nos
Gas-insulated switchgear (GIS)Sahyadritamra5 variants
SampleGas-insulated switchgear (GIS) Sahyadritamra · SAH-AC6 series
- System voltage
- 36 kV to 420 kV (see variants)
- Rated current
- 4000 A
- Short-circuit current
- 31.5 kA
- Configuration
- Ring bus
- Enclosure
- Aluminium alloy
Lead time 40-52 weeks · Warranty 36 months · MOQ 1 bay
Section insulators & neutral sectionsWayanadjoule5 variants
SampleSection insulators & neutral sections Wayanadjoule · WAY-C91 series
- Type
- Standard section insulator to Auto-passing neutral (see variants)
- Voltage
- 25 kV AC
- Material
- Epoxy glass
- Length
- 18 m
- Rated current
- 400 A
Lead time 8-10 weeks · Warranty 12 months · MOQ 2 nos
OHE masts, cantilevers & catenaryUrjaline5 variants
SampleOHE masts, cantilevers & catenary Urjaline · URJ-C24 series
- Mast type
- Single track mast to Tunnel bracket (see variants)
- Section
- Rolled beam
- Height
- 8 m
- Steel grade
- Fe 490
- Galvanising
- Hot-dip 610 g/m2
Lead time 8-12 weeks · Warranty 12 months · MOQ 1 nos
Power transformersTaxilaurja4 variants
Taxilaurja · TAX-D24 series
- Rating
- 50 MVA to 315 MVA (see variants)
- Voltage ratio
- 132/33 kV
- Cooling
- ONAN/ONAF/OFAF
- Vector group
- YNa0d11
- Tap changer
- OLTC 1.25% steps
Lead time 30-40 weeks · Warranty 36 months from supply · MOQ 1 nos
Traction SCADADhruvline5 variants
Dhruvline · DHR-D71 series
- Control posts
- Up to 10 posts to Up to 250 posts (see variants)
- Architecture
- Distributed
- RTU I/O
- Per post
- Communication
- OFC / MPLS
- Protocol
- IEC 61850
Lead time 20-28 weeks · Warranty 24 months · MOQ 2 lot
Dry-type transformersSabarmati4 variants
SampleDry-type transformers Sabarmati · SAB-8B3 series
- Rating
- 250 kVA to 1600 kVA (see variants)
- Voltage ratio
- 33/0.433 kV
- Technology
- Cast resin
- Insulation class
- Class F
- Cooling
- AN/AF
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Traction substations & transformersDhruvline3 variants
SampleTraction substations & transformers Dhruvline · DHR-DE5 series
- Rating
- 16 MVA to 21.6 MVA (see variants)
- Primary voltage
- 132 kV
- Secondary voltage
- 55 kV (2x25)
- Connection
- Scott
- Cooling
- ONAN
Lead time 16-20 weeks · Warranty 24 months from commissioning · MOQ 5 nos
Covered conductors & LT spacersKanchi6 variants
SampleCovered conductors & LT spacers Kanchi · KAN-A62 series
- Conductor size
- 70 mm2 to 240 mm2 (see variants)
- Voltage
- 11 kV
- Conductor
- AAAC
- Insulation
- XLPE
- Layers
- Single
Lead time 3-5 weeks · Warranty 24 months · MOQ 1 km
Traction SCADALumengen4 variants
Lumengen · LUM-D77 series
- Control posts
- Up to 10 posts to Up to 100 posts (see variants)
- Architecture
- Redundant server
- RTU I/O
- Per post
- Communication
- GSM backup
- Protocol
- IEC 61850
Lead time 12-16 weeks · Warranty 24 months · MOQ 1 lot
Earthing & auxiliary transformersChambal6 variants
SampleEarthing & auxiliary transformers Chambal · CHA-A82 series
- Rating
- 50 kVA to 1600 kVA (see variants)
- Type
- Station service
- Primary voltage
- 33 kV
- Secondary voltage
- 3.3 kV
- Short-time rating
- 10 s
Lead time 8-10 weeks · Warranty 24 months · MOQ 1 nos
Lattice towers & monopolesKonark5 variants
SampleLattice towers & monopoles Konark · KON-CD1 series
- Voltage class
- 11 kV to 220 kV (see variants)
- Type
- Lattice
- Circuit
- Single
- Tower type
- A suspension
- Height
- 60 m
Lead time 14-20 weeks · Warranty As per contract · MOQ 2 MT
Dry-type transformersEllora5 variants
SampleDry-type transformers Ellora · ELL-0E3 series
- Rating
- 100 kVA to 1600 kVA (see variants)
- Voltage ratio
- 22/0.433 kV
- Technology
- VPI
- Insulation class
- Class H
- Cooling
- AN
Lead time 4-6 weeks · Warranty 24 months · MOQ 1 nos
Disturbance recorders & PMUsDwaraka5 variants
SampleDisturbance recorders & PMUs Dwaraka · DWA-C89 series
- Channels
- 8 analog to 96 analog (see variants)
- Sampling rate
- 10 kHz
- Time sync
- IRIG-B
- Accuracy
- 0.1% FS
- Reporting rate
- 50 fps
Lead time 6-8 weeks · Warranty 24 months · MOQ 1 nos
Compact secondary substationsTejmark6 variants
SampleCompact secondary substations Tejmark · TEJ-322 series
- Transformer rating
- 100 kVA to 1600 kVA (see variants)
- Primary voltage
- 11 kV
- Secondary voltage
- 0.433 kV
- HV equipment
- VCB panel
- Transformer type
- Oil-immersed
Lead time 10-14 weeks · Warranty 24 months · MOQ 1 nos