Pre-compliance and test planning, Titan series

SampleServiceProduct certification (BIS, IEC, ALMM)

Shaktimark · SHA-238 series

Certification scope
Product family BIS to Multi-standard IEC set (see variants)
Standards covered
IEC 61215 and 61730
Application support
End-to-end with lab liaison
Test lab liaison
NABL accredited labs
Factory audit
BIS inspection support

Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application

Price on quote

by Shaktimark Projects (Sample) · invoiced by BARREL

Request quote

SCADA and RTU factory test, Flex series

SampleServiceFactory acceptance test (FAT) witnessing

Airavatsys · AIR-DF3 series

Equipment value
INR 1 crore to INR 10 crore (see variants)
Test plan
Based on tender specification
Tests witnessed
Routine tests per IS or IEC
Team
Specialist engineers per discipline
Location
Domestic factory

Lead time Deployment within 3-5 days · Warranty Re-witness at no cost if protocol changes · MOQ 1 day

Price on quote

by Airavatsys Engineering Services (Sample) · invoiced by BARREL

Request quote

FAT witnessing for inverters and PCS, Max 2 series

SampleServiceFactory acceptance test (FAT) witnessing

Deccan · DEC-A23 series

Equipment value
INR 1 crore to INR 10 crore (see variants)
Test plan
Client approved FAT protocol
Tests witnessed
Routine tests per IS or IEC
Team
Lead engineer and assistant
Location
International factory

Lead time Report within 2 days of test · Warranty Re-witness at no cost if protocol changes · MOQ 1 day

Price on quote

by Deccan Engineering Services (Sample) · invoiced by BARREL

Request quote

Earthing and lightning protection audit, Core series

SampleServiceElectrical safety audits

Maduraividyut · MAD-5F9 series

Installed load
5 MVA to 50 MVA (see variants)
Scope
Audit with measurements
Auditor
Chartered engineer
Measurements
Thermography and power quality
Report
Findings with risk rating

Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site

Price on quote

by Maduraividyut Technical Services (Sample) · invoiced by BARREL

Request quote

Cable and insulation resistance testing, Volt series

SampleServiceSite acceptance & pre-commissioning tests

Maduraividyut · MAD-C63 series

Plant size
1 MW to 50 MW (see variants)
Scope
Solar SAT
Instruments
Insulation tester, earth tester
Test sequence
Visual, mechanical, electrical
Team
Team of 6 with lead

Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site

Price for verified buyers

by Maduraividyut Technical Services (Sample) · invoiced by BARREL

Request quote

IEC certification support for power equipment, Core 2 series

SampleServiceProduct certification (BIS, IEC, ALMM)

Rajatcore · RAJ-B89 series

Certification scope
Product family BIS to Full global set (see variants)
Standards covered
IS 14286 and IS 16077
Application support
Documentation and filing
Test lab liaison
NABL accredited labs
Factory audit
BIS inspection support

Lead time 8-24 weeks for certificate · Warranty Re-filing support at no extra consulting fee · MOQ 1 application

Price on quote

by Rajatcore Consultants (Sample) · invoiced by BARREL

Request quote

Cable drum inspection and sampling, Smart 8 series

SampleServiceThird-party inspection (TPI)

Kakatiya · KAK-215 series

Inspection effort
1 man-day to 50 man-days (see variants)
Equipment inspected
Cables and conductors
Inspection stage
Raw material
Standards used
Per approved QAP
Inspector qualification
Level II NDT certified

Lead time Inspector assigned in 48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day

Price for verified buyers

by Kakatiya Logistics (Sample) · invoiced by BARREL

Request quote

Site acceptance testing for solar plants, Duo series

SampleServiceSite acceptance & pre-commissioning tests

Deccan · DEC-244 series

Plant size
1 MW to 100 MW (see variants)
Scope
Solar SAT
Instruments
Insulation tester, earth tester
Test sequence
Visual, mechanical, electrical
Team
Team of 6 with lead

Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site

Price for verified buyers

by Deccan Engineering Services (Sample) · invoiced by BARREL

Request quote

High-voltage and short-circuit laboratory services, Prime series

SampleServiceType & routine testing laboratories (NABL)

Krishna · KRI-413 series

Test class
Acceptance test to Type test (LV) (see variants)
Equipment under test
Switchgear
Accreditation
NABL plus BIS recognition
Rating range
Up to 400 kV
Test standard
Customer specific test plan

Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos

Price on quote

by Krishna Infra Services (Sample) · invoiced by BARREL

Request quote

High-voltage and short-circuit laboratory services, Ultra series

SampleServiceType & routine testing laboratories (NABL)

Maduraisurya · MAD-416 series

Test class
Special test to Short-circuit test (see variants)
Equipment under test
Switchgear
Accreditation
NABL ISO/IEC 17025
Rating range
Up to 400 kV
Test standard
Customer specific test plan

Lead time Slot in 1-2 weeks · Warranty Report accuracy guarantee · MOQ 1 nos

Price for verified buyers

by Maduraisurya Technical Services (Sample) · invoiced by BARREL

Request quote

PV module qualification testing, Eco series

SampleServiceType & routine testing laboratories (NABL)

Shaktimark · SHA-FB8 series

Test class
Acceptance test to Type test (HV) (see variants)
Equipment under test
Power transformers
Accreditation
NABL plus BIS recognition
Rating range
Up to 33 kV
Test standard
IS or IEC as specified

Lead time Slot in 1-2 weeks · Warranty Report accuracy guarantee · MOQ 1 nos

Price for verified buyers

by Shaktimark Projects (Sample) · invoiced by BARREL

Request quote

Fire and arc-flash risk assessment, Volt series

SampleServiceElectrical safety audits

Malwavolt · MAL-2D4 series

Installed load
1 MVA to 50 MVA (see variants)
Scope
Audit with arc-flash study
Auditor
CEA-licensed engineer
Measurements
Earth resistance, insulation
Report
Action plan with timeline

Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site

Price for verified buyers

by Malwavolt Technical Services (Sample) · invoiced by BARREL

Request quote

Cable and insulation resistance testing, Prime 9 series

SampleServiceSite acceptance & pre-commissioning tests

Kaveridhruv · KAV-C65 series

Plant size
1 MW to 50 MW (see variants)
Scope
Complete SAT with performance test
Instruments
Relay test set, IV tracer, CRM
Test sequence
Per client approved format
Team
Test engineer plus 2 technicians

Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site

Price for verified buyers

by Kaveridhruv Consultants (Sample) · invoiced by BARREL

Request quote

Earth resistance and step-touch potential tests, Neo series

SampleServiceSite acceptance & pre-commissioning tests

Rajatcore · RAJ-C95 series

Plant size
1 MW to 100 MW (see variants)
Scope
Complete SAT with performance test
Instruments
Insulation tester, earth tester
Test sequence
Per client approved format
Team
Test engineer plus 2 technicians

Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site

Price for verified buyers

by Rajatcore Consultants (Sample) · invoiced by BARREL

Request quote

Statutory electrical compliance audit, Smart series

SampleServiceElectrical safety audits

Deccan · DEC-758 series

Installed load
500 kVA to 5 MVA (see variants)
Scope
Audit with measurements
Auditor
CEA-licensed engineer
Measurements
Thermography and power quality
Report
Findings with risk rating

Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site

Price on quote

by Deccan Engineering Services (Sample) · invoiced by BARREL

Request quote

Earth resistance and step-touch potential tests, Volt series

SampleServiceSite acceptance & pre-commissioning tests

Rajatcore · RAJ-C91 series

Plant size
1 MW to 100 MW (see variants)
Scope
Complete SAT with performance test
Instruments
Relay test set, IV tracer, CRM
Test sequence
Per client approved format
Team
Test engineer plus 2 technicians

Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site

Price for verified buyers

by Rajatcore Consultants (Sample) · invoiced by BARREL

Request quote

IEC certification support for power equipment, Core 2 series

SampleServiceProduct certification (BIS, IEC, ALMM)

Deccan · DEC-B83 series

Certification scope
IEC 61215 and 61730 to Full global set (see variants)
Standards covered
IS 14286 and IS 16077
Application support
End-to-end with lab liaison
Test lab liaison
NABL accredited labs
Factory audit
BIS inspection support

Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application

Price on quote

by Deccan Engineering Services (Sample) · invoiced by BARREL

Request quote

Cable and insulation resistance testing, Edge series

SampleServiceSite acceptance & pre-commissioning tests

Krishna · KRI-C69 series

Plant size
10 MW to 250 MW (see variants)
Scope
Solar SAT
Instruments
Relay test set, IV tracer, CRM
Test sequence
Visual, mechanical, electrical
Team
Team of 6 with lead

Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site

Price for verified buyers

by Krishna Infra Services (Sample) · invoiced by BARREL

Request quote

Mahanadiloha · MAH-881 series

Installed load
1 MVA to 25 MVA (see variants)
Scope
Audit with arc-flash study
Auditor
Chartered engineer
Measurements
Earth resistance, insulation
Report
Findings with risk rating

Lead time Audit in 1-2 weeks · Warranty Re-audit at reduced rate · MOQ 1 site

Price for verified buyers

by Mahanadiloha Consultants (Sample) · invoiced by BARREL

Request quote

Lonavala · LON-681 series

Installed load
1 MVA to 50 MVA (see variants)
Scope
Visual and documentation audit
Auditor
CEA-licensed engineer
Measurements
Thermography and power quality
Report
Action plan with timeline

Lead time Report in 7-14 days · Warranty Re-audit at reduced rate · MOQ 1 site

Price for verified buyers

by Lonavala Logistics (Sample) · invoiced by BARREL

Request quote

Cable drum inspection and sampling, Edge series

SampleServiceThird-party inspection (TPI)

Maduraisurya · MAD-213 series

Inspection effort
5 man-days to 50 man-days (see variants)
Equipment inspected
Switchgear and relays
Inspection stage
Final pre-dispatch
Standards used
Per client specification
Inspector qualification
Level II NDT certified

Lead time Report in 24-48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day

Price on quote

by Maduraisurya Technical Services (Sample) · invoiced by BARREL

Request quote

Earthing and lightning protection audit, Plus series

SampleServiceElectrical safety audits

Kamrup · KAM-5F3 series

Installed load
500 kVA to 25 MVA (see variants)
Scope
Audit with arc-flash study
Auditor
Chartered engineer
Measurements
Earth resistance, insulation
Report
Action plan with timeline

Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site

Price on quote

by Kamrup Projects (Sample) · invoiced by BARREL

Request quote

Kaveridhruv · KAV-683 series

Installed load
500 kVA to 25 MVA (see variants)
Scope
Audit with measurements
Auditor
Chartered engineer
Measurements
Earth resistance, insulation
Report
Action plan with timeline

Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site

Price for verified buyers

by Kaveridhruv Consultants (Sample) · invoiced by BARREL

Request quote

BESS container factory acceptance, Max series

SampleServiceFactory acceptance test (FAT) witnessing

Rajatcore · RAJ-9E6 series

Equipment value
INR 25 lakh to INR 1 crore (see variants)
Test plan
Based on tender specification
Tests witnessed
Routine tests per IS or IEC
Team
Lead engineer and assistant
Location
International factory

Lead time Report within 2 days of test · Warranty As per contract · MOQ 1 day

Price for verified buyers

by Rajatcore Consultants (Sample) · invoiced by BARREL

Request quote

BARREL: Bharat Atom Renewable Resources Energy Limited