Product certification (BIS, IEC, ALMM)Krishna3 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Krishna · KRI-556 series
- Certification scope
- ALMM List-II (cells) to Multi-standard IEC set (see variants)
- Standards covered
- IEC 62109 for inverters
- Application support
- Documentation and filing
- Test lab liaison
- NABL accredited labs
- Factory audit
- Pre-audit gap analysis
Lead time 8-24 weeks for certificate · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Site acceptance & pre-commissioning testsMaduraividyut4 variants
SampleServiceSite acceptance & pre-commissioning tests Maduraividyut · MAD-C62 series
- Plant size
- 25 MW to 250 MW (see variants)
- Scope
- Electrical pre-commissioning
- Instruments
- Insulation tester, earth tester
- Test sequence
- Visual, mechanical, electrical
- Team
- Test engineer plus 2 technicians
Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Product certification (BIS, IEC, ALMM)Mahanadi6 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Mahanadi · MAH-B49 series
- Certification scope
- Product family BIS to Full global set (see variants)
- Standards covered
- IS 14286 and IS 16077
- Application support
- End-to-end with lab liaison
- Test lab liaison
- Notified bodies
- Factory audit
- BIS inspection support
Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Site acceptance & pre-commissioning testsMaduraisurya6 variants
SampleServiceSite acceptance & pre-commissioning tests Maduraisurya · MAD-248 series
- Plant size
- 1 MW to 100 MW (see variants)
- Scope
- Solar SAT
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Team of 6 with lead
Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site
Site acceptance & pre-commissioning testsKamrup6 variants
SampleServiceSite acceptance & pre-commissioning tests Kamrup · KAM-1A4 series
- Plant size
- 5 MW to 250 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Insulation tester, earth tester
- Test sequence
- Visual, mechanical, electrical
- Team
- Team of 6 with lead
Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Product certification (BIS, IEC, ALMM)Vidyutline3 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Vidyutline · VID-559 series
- Certification scope
- ALMM List-II (cells) to Multi-standard IEC set (see variants)
- Standards covered
- IEC 61215 and 61730
- Application support
- End-to-end with lab liaison
- Test lab liaison
- Notified bodies
- Factory audit
- Pre-audit gap analysis
Lead time 8-24 weeks for certificate · Warranty As per contract · MOQ 1 application
Electrical safety auditsKaverispark3 variants
SampleServiceElectrical safety audits Kaverispark · KAV-752 series
- Installed load
- 1 MVA to 10 MVA (see variants)
- Scope
- Visual and documentation audit
- Auditor
- Chartered engineer
- Measurements
- Thermography and power quality
- Report
- Action plan with timeline
Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Type & routine testing laboratories (NABL)Kakatiyarajat6 variants
SampleServiceType & routine testing laboratories (NABL) Kakatiyarajat · KAK-925 series
- Test class
- Acceptance test to Short-circuit test (see variants)
- Equipment under test
- Insulators
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 33 kV
- Test standard
- IS or IEC as specified
Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Product certification (BIS, IEC, ALMM)Kamrup3 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Kamrup · KAM-469 series
- Certification scope
- Single product BIS to ALMM List-I (see variants)
- Standards covered
- IEC 61215 and 61730
- Application support
- Documentation and filing
- Test lab liaison
- Notified bodies
- Factory audit
- BIS inspection support
Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Site acceptance & pre-commissioning testsVidyutline3 variants
SampleServiceSite acceptance & pre-commissioning tests Vidyutline · VID-C99 series
- Plant size
- 25 MW to 100 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Insulation tester, earth tester
- Test sequence
- Visual, mechanical, electrical
- Team
- Team of 6 with lead
Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site
Third-party inspection (TPI)Lonavala5 variants
SampleServiceThird-party inspection (TPI) Lonavala · LON-963 series
- Inspection effort
- 1 man-day to 50 man-days (see variants)
- Equipment inspected
- Towers and structures
- Inspection stage
- Final pre-dispatch
- Standards used
- Per approved QAP
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Electrical safety auditsDwaraka5 variants
SampleServiceElectrical safety audits Dwaraka · DWA-882 series
- Installed load
- 1 MVA to 50 MVA (see variants)
- Scope
- Visual and documentation audit
- Auditor
- CEA-licensed engineer
- Measurements
- Thermography and power quality
- Report
- Action plan with timeline
Lead time Report in 7-14 days · Warranty Re-audit at reduced rate · MOQ 1 site
Type & routine testing laboratories (NABL)Lonavala5 variants
SampleServiceType & routine testing laboratories (NABL) Lonavala · LON-4F4 series
- Test class
- Acceptance test to Type test (HV) (see variants)
- Equipment under test
- Insulators
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 400 kV
- Test standard
- Customer specific test plan
Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos
Electrical safety auditsKrishna5 variants
SampleServiceElectrical safety audits Krishna · KRI-688 series
- Installed load
- 500 kVA to 25 MVA (see variants)
- Scope
- Audit with arc-flash study
- Auditor
- Chartered engineer
- Measurements
- Earth resistance, insulation
- Report
- Action plan with timeline
Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Product certification (BIS, IEC, ALMM)Dwaraka3 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Dwaraka · DWA-463 series
- Certification scope
- IEC 61215 and 61730 to Full global set (see variants)
- Standards covered
- IEC 62109 for inverters
- Application support
- Documentation and filing
- Test lab liaison
- NABL accredited labs
- Factory audit
- BIS inspection support
Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Electrical safety auditsKaverispark4 variants
SampleServiceElectrical safety audits Kaverispark · KAV-752 series
- Installed load
- 1 MVA to 25 MVA (see variants)
- Scope
- Audit with measurements
- Auditor
- CEA-licensed engineer
- Measurements
- Thermography and power quality
- Report
- Action plan with timeline
Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Product certification (BIS, IEC, ALMM)Maduraisurya4 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Maduraisurya · MAD-B44 series
- Certification scope
- Product family BIS to IEC 61215 and 61730 (see variants)
- Standards covered
- IEC 61215 and 61730
- Application support
- Documentation and filing
- Test lab liaison
- NABL accredited labs
- Factory audit
- BIS inspection support
Lead time Kick-off in 1 week · Warranty Re-filing support at no extra consulting fee · MOQ 1 application
Site acceptance & pre-commissioning testsVidyutline4 variants
SampleServiceSite acceptance & pre-commissioning tests Vidyutline · VID-C95 series
- Plant size
- 1 MW to 25 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Insulation tester, earth tester
- Test sequence
- Visual, mechanical, electrical
- Team
- Team of 6 with lead
Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Third-party inspection (TPI)Kaveridhruv4 variants
SampleServiceThird-party inspection (TPI) Kaveridhruv · KAV-092 series
- Inspection effort
- 5 man-days to 50 man-days (see variants)
- Equipment inspected
- PV modules and inverters
- Inspection stage
- Final pre-dispatch
- Standards used
- Per client specification
- Inspector qualification
- B.E. Electrical with 8 years experience
Lead time Inspector assigned in 48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day
Site acceptance & pre-commissioning testsKaveridhruv5 variants
SampleServiceSite acceptance & pre-commissioning tests Kaveridhruv · KAV-C68 series
- Plant size
- 5 MW to 100 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Relay test set, IV tracer, CRM
- Test sequence
- Visual, mechanical, electrical
- Team
- Test engineer plus 2 technicians
Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Third-party inspection (TPI)Mahanadiloha3 variants
SampleServiceThird-party inspection (TPI) Mahanadiloha · MAH-6E5 series
- Inspection effort
- 1 man-day to 10 man-days (see variants)
- Equipment inspected
- Switchgear and relays
- Inspection stage
- In-process
- Standards used
- Per approved QAP
- Inspector qualification
- B.E. Electrical with 8 years experience
Lead time Inspector assigned in 48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day
Third-party inspection (TPI)Deccan6 variants
SampleServiceThird-party inspection (TPI) Deccan · DEC-AE8 series
- Inspection effort
- 1 man-day to 100 man-days (see variants)
- Equipment inspected
- Cables and conductors
- Inspection stage
- Final pre-dispatch
- Standards used
- Per approved QAP
- Inspector qualification
- B.E. Electrical with 8 years experience
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Electrical safety auditsUrjatek5 variants
SampleServiceElectrical safety audits Urjatek · URJ-5F2 series
- Installed load
- 1 MVA to 50 MVA (see variants)
- Scope
- Audit with measurements
- Auditor
- CEA-licensed engineer
- Measurements
- Thermography and power quality
- Report
- Action plan with timeline
Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Type & routine testing laboratories (NABL)Vidyutline5 variants
SampleServiceType & routine testing laboratories (NABL) Vidyutline · VID-929 series
- Test class
- Acceptance test to Type test (HV) (see variants)
- Equipment under test
- Distribution transformers
- Accreditation
- NABL ISO/IEC 17025
- Rating range
- Up to 33 kV
- Test standard
- Customer specific test plan
Lead time Test report in 3-8 weeks · Warranty Free retest on lab error · MOQ 1 nos