Site acceptance & pre-commissioning testsKakatiya5 variants
SampleServiceSite acceptance & pre-commissioning tests Kakatiya · KAK-626 series
- Plant size
- 5 MW to 100 MW (see variants)
- Scope
- Electrical pre-commissioning
- Instruments
- Relay test set, IV tracer, CRM
- Test sequence
- Visual, mechanical, electrical
- Team
- Test engineer plus 2 technicians
Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Electrical safety auditsKrishna3 variants
SampleServiceElectrical safety audits Krishna · KRI-681 series
- Installed load
- 500 kVA to 5 MVA (see variants)
- Scope
- Visual and documentation audit
- Auditor
- Chartered engineer
- Measurements
- Earth resistance, insulation
- Report
- Findings with risk rating
Lead time Audit in 1-2 weeks · Warranty Re-audit at reduced rate · MOQ 1 site
Site acceptance & pre-commissioning testsKamrup5 variants
SampleServiceSite acceptance & pre-commissioning tests Kamrup · KAM-1A9 series
- Plant size
- 5 MW to 100 MW (see variants)
- Scope
- Electrical pre-commissioning
- Instruments
- Relay test set, IV tracer, CRM
- Test sequence
- Per client approved format
- Team
- Team of 6 with lead
Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Factory acceptance test (FAT) witnessingLonavala4 variants
SampleServiceFactory acceptance test (FAT) witnessing Lonavala · LON-9E9 series
- Equipment value
- INR 1 crore to INR 25 crore (see variants)
- Test plan
- Client approved FAT protocol
- Tests witnessed
- Routine plus special tests
- Team
- Specialist engineers per discipline
- Location
- Domestic factory
Lead time Report within 2 days of test · Warranty As per contract · MOQ 1 day
Electrical safety auditsShaktimark5 variants
SampleServiceElectrical safety audits Shaktimark · SHA-2D4 series
- Installed load
- 500 kVA to 25 MVA (see variants)
- Scope
- Audit with measurements
- Auditor
- Chartered engineer
- Measurements
- Thermography and power quality
- Report
- Action plan with timeline
Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Electrical safety auditsShaktimark4 variants
SampleServiceElectrical safety audits Shaktimark · SHA-2D5 series
- Installed load
- 5 MVA to 50 MVA (see variants)
- Scope
- Audit with measurements
- Auditor
- Chartered engineer
- Measurements
- Earth resistance, insulation
- Report
- Findings with risk rating
Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Site acceptance & pre-commissioning testsUrjatron4 variants
SampleServiceSite acceptance & pre-commissioning tests Urjatron · URJ-249 series
- Plant size
- 25 MW to 250 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Relay test set, IV tracer, CRM
- Test sequence
- Visual, mechanical, electrical
- Team
- Test engineer plus 2 technicians
Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site
Site acceptance & pre-commissioning testsKakatiyarajat6 variants
SampleServiceSite acceptance & pre-commissioning tests Kakatiyarajat · KAK-C98 series
- Plant size
- 1 MW to 100 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Relay test set, IV tracer, CRM
- Test sequence
- Per client approved format
- Team
- Test engineer plus 2 technicians
Lead time Mobilisation in 3-7 days · Warranty Report accuracy guaranteed · MOQ 1 site
Third-party inspection (TPI)Shaktimark3 variants
SampleServiceThird-party inspection (TPI) Shaktimark · SHA-094 series
- Inspection effort
- 20 man-days to 100 man-days (see variants)
- Equipment inspected
- PV modules and inverters
- Inspection stage
- Raw material
- Standards used
- Per approved QAP
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day
Factory acceptance test (FAT) witnessingDeccan3 variants
SampleServiceFactory acceptance test (FAT) witnessing Deccan · DEC-A29 series
- Equipment value
- INR 5 crore to INR 25 crore (see variants)
- Test plan
- Client approved FAT protocol
- Tests witnessed
- Routine tests per IS or IEC
- Team
- Lead engineer and assistant
- Location
- International factory
Lead time Report within 2 days of test · Warranty As per contract · MOQ 1 day
Type & routine testing laboratories (NABL)Airavatsys6 variants
SampleServiceType & routine testing laboratories (NABL) Airavatsys · AIR-9B6 series
- Test class
- Acceptance test to Short-circuit test (see variants)
- Equipment under test
- Switchgear
- Accreditation
- NABL ISO/IEC 17025
- Rating range
- Up to 33 kV
- Test standard
- Customer specific test plan
Lead time Slot in 1-2 weeks · Warranty Free retest on lab error · MOQ 1 nos
Third-party inspection (TPI)Malwavolt6 variants
SampleServiceThird-party inspection (TPI) Malwavolt · MAL-AE3 series
- Inspection effort
- 1 man-day to 100 man-days (see variants)
- Equipment inspected
- Towers and structures
- Inspection stage
- In-process
- Standards used
- Per client specification
- Inspector qualification
- B.E. Electrical with 8 years experience
Lead time Report in 24-48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day
Type & routine testing laboratories (NABL)Kakatiya3 variants
SampleServiceType & routine testing laboratories (NABL) Kakatiya · KAK-9B9 series
- Test class
- Special test to Type test (MV) (see variants)
- Equipment under test
- Switchgear
- Accreditation
- NABL plus BIS recognition
- Rating range
- Up to 400 kV
- Test standard
- IS or IEC as specified
Lead time Test report in 3-8 weeks · Warranty Report accuracy guarantee · MOQ 1 nos
Site acceptance & pre-commissioning testsUrjatek5 variants
SampleServiceSite acceptance & pre-commissioning tests Urjatek · URJ-627 series
- Plant size
- 10 MW to 250 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Relay test set, IV tracer, CRM
- Test sequence
- Visual, mechanical, electrical
- Team
- Test engineer plus 2 technicians
Lead time On-site 3-21 days · Warranty Report accuracy guaranteed · MOQ 1 site
Site acceptance & pre-commissioning testsUrjatron6 variants
SampleServiceSite acceptance & pre-commissioning tests Urjatron · URJ-244 series
- Plant size
- 1 MW to 100 MW (see variants)
- Scope
- Electrical pre-commissioning
- Instruments
- Insulation tester, earth tester
- Test sequence
- Per client approved format
- Team
- Test engineer plus 2 technicians
Lead time On-site 3-21 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Third-party inspection (TPI)Urjatek5 variants
SampleServiceThird-party inspection (TPI) Urjatek · URJ-AE8 series
- Inspection effort
- 5 man-days to 100 man-days (see variants)
- Equipment inspected
- Towers and structures
- Inspection stage
- Raw material
- Standards used
- Per client specification
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day
Electrical safety auditsKakatiyarajat3 variants
SampleServiceElectrical safety audits Kakatiyarajat · KAK-685 series
- Installed load
- 10 MVA to 50 MVA (see variants)
- Scope
- Visual and documentation audit
- Auditor
- Chartered engineer
- Measurements
- Thermography and power quality
- Report
- Findings with risk rating
Lead time Audit in 1-2 weeks · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Site acceptance & pre-commissioning testsDwaraka4 variants
SampleServiceSite acceptance & pre-commissioning tests Dwaraka · DWA-624 series
- Plant size
- 1 MW to 25 MW (see variants)
- Scope
- Complete SAT with performance test
- Instruments
- Insulation tester, earth tester
- Test sequence
- Visual, mechanical, electrical
- Team
- Test engineer plus 2 technicians
Lead time Mobilisation in 3-7 days · Warranty Retest at no cost on instrument error · MOQ 1 site
Electrical safety auditsKakatiya5 variants
SampleServiceElectrical safety audits Kakatiya · KAK-883 series
- Installed load
- 1 MVA to 50 MVA (see variants)
- Scope
- Visual and documentation audit
- Auditor
- Chartered engineer
- Measurements
- Earth resistance, insulation
- Report
- Findings with risk rating
Lead time Report in 7-14 days · Warranty Clarifications on report at no cost for 6 months · MOQ 1 site
Factory acceptance test (FAT) witnessingDwaraka3 variants
SampleServiceFactory acceptance test (FAT) witnessing Dwaraka · DWA-D81 series
- Equipment value
- INR 1 crore to INR 10 crore (see variants)
- Test plan
- Based on tender specification
- Tests witnessed
- Routine plus special tests
- Team
- Specialist engineers per discipline
- Location
- Domestic factory
Lead time Deployment within 3-5 days · Warranty As per contract · MOQ 1 day
Third-party inspection (TPI)Dwaraka3 variants
SampleServiceThird-party inspection (TPI) Dwaraka · DWA-964 series
- Inspection effort
- 20 man-days to 100 man-days (see variants)
- Equipment inspected
- PV modules and inverters
- Inspection stage
- Raw material
- Standards used
- Per client specification
- Inspector qualification
- Level II NDT certified
Lead time Inspector assigned in 48 hours · Warranty As per contract · MOQ 1 day
Third-party inspection (TPI)Kakatiyarajat5 variants
SampleServiceThird-party inspection (TPI) Kakatiyarajat · KAK-6E1 series
- Inspection effort
- 1 man-day to 50 man-days (see variants)
- Equipment inspected
- Towers and structures
- Inspection stage
- Raw material
- Standards used
- Per client specification
- Inspector qualification
- Level II NDT certified
Lead time Report in 24-48 hours · Warranty Re-inspection at no cost for disputed lots · MOQ 1 day
Factory acceptance test (FAT) witnessingKrishna6 variants
SampleServiceFactory acceptance test (FAT) witnessing Krishna · KRI-174 series
- Equipment value
- INR 25 lakh to INR 25 crore (see variants)
- Test plan
- Client approved FAT protocol
- Tests witnessed
- Routine plus special tests
- Team
- Specialist engineers per discipline
- Location
- International factory
Lead time Report within 2 days of test · Warranty Re-witness at no cost if protocol changes · MOQ 1 day
Product certification (BIS, IEC, ALMM)Vidyutline5 variants
SampleServiceProduct certification (BIS, IEC, ALMM) Vidyutline · VID-557 series
- Certification scope
- ALMM List-I to Full global set (see variants)
- Standards covered
- IEC 62109 for inverters
- Application support
- End-to-end with lab liaison
- Test lab liaison
- Notified bodies
- Factory audit
- BIS inspection support
Lead time 8-24 weeks for certificate · Warranty As per contract · MOQ 1 application